20.06.2014 Views

Download PDF (2.3MB) - Safequarry.com

Download PDF (2.3MB) - Safequarry.com

Download PDF (2.3MB) - Safequarry.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

12:<br />

><br />

transport – site design<br />

www.safequarry.<strong>com</strong><br />

Vehicle movements: improvement<br />

programme<br />

Midland Quarry Products > Edwin Richards Quarry, West Midlands > 0121 561 4400<br />

At Edwin Richards Quarry, a <strong>com</strong>prehensive<br />

package of improvements has been made to<br />

vehicle and pedestrian movements, including:<br />

• introduction of a <strong>com</strong>pany safe working<br />

transport guidance booklet for all hauliers,<br />

including guidance for safe reversing<br />

• enforcement of agreed traffic routes out of the<br />

quarry and away from the majority of the local<br />

residential areas<br />

• introduction of a cab ‘seat belt worn’ light.<br />

><br />

Vehicle maintenance and traffic control<br />

system<br />

Bardon Aggregates > Warmwell Quarry, Dorset > 01929 522496<br />

At Warmwell Quarry in Dorchester, a <strong>com</strong>prehensive programme of vehicle maintenance and traffic<br />

management is in place, including:<br />

• risk assessments – created using the <strong>com</strong>puter system, ‘Envoy’. The records are accessible by all other<br />

employees and a date for review is flagged up<br />

• sheeting rack – avoids the need for hauliers to<br />

enter the body of the trucks to skim the load or<br />

to climb on the body to sheet<br />

• traffic marking – at the start of the access road<br />

to direct visitors to either the landfill, concrete<br />

plant or the quarry.<br />

><br />

Traffic light controls to safeguard<br />

pedestrians<br />

Tarmac Northern > Cruicks Quarry, Fife > 01383 413241<br />

The weighbridge at Cruicks Quarry in Inverkeithing can only be accessed by crossing the busy main road<br />

<strong>com</strong>ing into the quarry. A risk assessment highlighted the potential hazard and a pedestrian walkway with<br />

traffic lights was installed.<br />

This same system was installed in three further parts of the quarry, including an internal haul road, which<br />

crosses the main in<strong>com</strong>ing road. Although the latter generally has right of way, the mobile plant operators<br />

can change the light from red to green using a hand-held remote control unit.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!