10:<br />

><br />

transport – site design<br />

Pedestrian management<br />

Bardon Aggregates > Heights Quarry, County Durham > 01388 517 381<br />

Heights Quarry, near Bishop Auckland in County Durham, is<br />

operated by Bardon Aggregates. Amongst the various safety<br />

features are good examples of two types of pedestrian segregation.<br />

Chain-linked vertical<br />

angle-irons where<br />

width is limited, and<br />

oversize blocks where<br />

it is not.<br />

www.safequarry.<strong>com</strong><br />

><br />

Protected pedestrian routing<br />

Bardon Aggregates > Croft Quarry, Leicestershire > 01629 650275<br />

><br />

At Croft Quarry, routes for both vehicles and pedestrians have <strong>com</strong>e under scrutiny. The out<strong>com</strong>e has been<br />

a new walkway from the parking area to the railhead, <strong>com</strong>plete with handrails, signs and an overhead<br />

cover under the conveyor to protect pedestrians from falling objects.<br />

Everyday activities have also been made safer for the drivers of dump trucks with the grading and<br />

resurfacing of two parts of the haul routes.<br />

Cement delivery controls and procedures<br />

Aggregate Industries > Marybank Quarry, Isle of Lewis > 01851 703227<br />

Delivering to the remote Hebridean Isle<br />

of Lewis proves time-consuming and<br />

expensive. Major improvements in all these<br />

areas have been made since five specialist<br />

vessels with a cumulative storage capacity<br />

of 1,000 tonnes have been installed on site.<br />

This means that cement can be delivered in<br />

bulk by boat, and taken the short remainder<br />

of the journey by road.<br />

The new system has raised several<br />

safety concerns – all of which have been<br />

<strong>com</strong>prehensively dealt with. Road tankers<br />

deliver cement into the top of the new<br />

vessels – at a height of 12 metres and close to the quarry face. For the safety of personnel, a protective<br />

barrier has been installed next to the quarry face and road barrier sections enclose the work area around<br />

the delivery pipes.<br />

Delivery pipes are marked to identify their silo number and contents, and a repeater panel has been<br />

installed. Delivery and emergency procedures are clearly posted. A walkway with a lockable gate provides<br />

access to the top of the pressure vessels, avoiding the need for a ladder.