IWMP-2 - Commissionerate of Rural Development Gujarat State
IWMP-2 - Commissionerate of Rural Development Gujarat State
IWMP-2 - Commissionerate of Rural Development Gujarat State
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>IWMP</strong>-2 Mahiyari<br />
Table no. 51: Status <strong>of</strong> Drinking water<br />
S.<br />
No.<br />
Names <strong>of</strong><br />
Villages<br />
Availability <strong>of</strong> drinking water<br />
Quality <strong>of</strong> drinking water<br />
(no. <strong>of</strong> months in a year)<br />
Expected Postproject<br />
Pre-project Expected Post project Pre-project<br />
Comments<br />
1 Mahiyari 9 Months<br />
2 Revadra<br />
9 Months<br />
3 Tarkhai<br />
9 Months<br />
12 Month<br />
Saline with<br />
high TDS<br />
Potable<br />
-<br />
6.1.5 Crops<br />
Agriculture primarily depends upon water; but this is what is lacking in Mahiyari Project. The surface water is scanty due to average or high<br />
rainfall and ground water is saline, which is unfit for crop production.<br />
All this can change with the integrated land and water management during the watershed project. The planned earthen bunds would prevent<br />
the saline water from the Sea <strong>of</strong> Arb Sagar to mix with the sweet rain water and also help percolate sweet water underground, and preserve<br />
some moisture in the soil. This will help in additional area coming under cultivation and increasing productivity too. The farmers can take more<br />
than one season <strong>of</strong> crops. Different varieties <strong>of</strong> crops can be taken.<br />
District Watershed <strong>Development</strong> Unit, Porbandar