IWMP-11 - Commissionerate of Rural Development Gujarat State ...
IWMP-11 - Commissionerate of Rural Development Gujarat State ...
IWMP-11 - Commissionerate of Rural Development Gujarat State ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Need <strong>of</strong> Watershed <strong>Development</strong> Programme<br />
PIA: DWDU, Amreli<br />
Watershed <strong>Development</strong> Programme is selected on the basis <strong>of</strong> thirteen parameter namely Poverty Index, Percentage <strong>of</strong> SC/ST, Actual<br />
Wages, Percentage <strong>of</strong> small and marginal farmers, Ground water status, Moisture Index, Area under rainfed Agriculture, Drinking water<br />
situation in the area, percentage <strong>of</strong> degraded land, Productivity potential <strong>of</strong> the land, Contiguity <strong>of</strong> another watershed that has already<br />
developed/treated Cluster approach for plain or for hilly terrain. Based on these thirteen parameter a composite ranking was been given to<br />
cluster.<br />
Since the waste land is maximum in the project area and due to the low moisture index the area is classified under IWDP block. Drinking<br />
water is a major problem in this project area. In a broader view the soil <strong>of</strong> this region is suitable for agriculture crops and cash crops but<br />
due to lack <strong>of</strong> water harvesting structures and irrigation water agriculture itself has become a constraint and the productivity potential has<br />
considerable gone low. The soil is very porous and hence rate <strong>of</strong> infiltration is more however production <strong>of</strong> the land can be significantly<br />
enriched with the help <strong>of</strong> better management practices and availability <strong>of</strong> timely irrigation and use <strong>of</strong> organic and inorganic fertilizer.<br />
Table no.2: Weight-age <strong>of</strong> the project<br />
Weightage under the criteria<br />
Project name Project type<br />
i ii iii iv v vi vii viii ix x xi xii xiii Total<br />
<strong>IWMP</strong> <strong>11</strong> Others 7.5 3 0 5 3 10 10 7.5 10 10 10 15 0 91<br />
District Watershed <strong>Development</strong> Unit, Amreli 8