IWMP-11 - Commissionerate of Rural Development Gujarat State ...
IWMP-11 - Commissionerate of Rural Development Gujarat State ...
IWMP-11 - Commissionerate of Rural Development Gujarat State ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PIA: DWDU, Amreli<br />
Afforestation/Agro-Forestry: Emphasis is placed on maximizing the use <strong>of</strong> available land and resources with high yield tree species. Trees<br />
can either be <strong>of</strong> similar species or mixed in a manner that will result in a stand or forest. Depending on the climate, geographical layout <strong>of</strong><br />
the area and the soil conditions, trees that have the greatest growth potential are selected like Neem and Babool.<br />
Farm Outlet: Farm outlets are constructed on agricultural land with the aim <strong>of</strong> arresting soil erosion and improving the soil moisture pr<strong>of</strong> ile.<br />
Ideally, bunds on farms should be made on the contour line. But this creates several problems for farmers. Contour bunds divide the field into<br />
irregular sections. In such a situation, it becomes inconvenient to maneuver bullocks for operations such as ploughing and line-sowing.<br />
Table no.36: Details <strong>of</strong> ridge line treatment / land based activities in watershed works<br />
Type <strong>of</strong> treatment Type <strong>of</strong> land Target<br />
No. <strong>of</strong><br />
S. Village Name <strong>of</strong><br />
(i)<br />
(iii)<br />
(iii)<br />
(ii)<br />
units<br />
No. name structures<br />
Ridge<br />
Land<br />
(ii) Others<br />
Estimated cost (Rs. in<br />
Drainage (i)Private<br />
(No./<br />
area<br />
dev.<br />
Community (pl.<br />
lakh)<br />
line (D)<br />
cu.m./<br />
®<br />
(L)<br />
specify)<br />
rmt)<br />
M W O T<br />
Afforestation L C 2 Ha 2.50<br />
1 Shedubhar<br />
Masonry stop<br />
D<br />
dams<br />
C 19<br />
65.25<br />
Nalaplug (Pucca) D C 4 8.30<br />
Farm outlet L P 220 33.00<br />
109.05<br />
Expected<br />
month &<br />
year <strong>of</strong><br />
completion<br />
(mm/yyyy)<br />
S.<br />
No.<br />
Village<br />
name<br />
1 Haripura<br />
Name <strong>of</strong><br />
structures<br />
Type <strong>of</strong> treatment Type <strong>of</strong> land Target<br />
No. <strong>of</strong><br />
(iii)<br />
(iii)<br />
(ii)<br />
units<br />
Land<br />
(ii) Others<br />
Drainage (i)Private<br />
(No./<br />
dev.<br />
Community (pl.<br />
line (D)<br />
cu.m./<br />
(L)<br />
specify)<br />
rmt)<br />
(i)<br />
Ridge<br />
area<br />
®<br />
Estimated cost (Rs. in<br />
lakh)<br />
M W O T<br />
Field Bunding L C 20000rmt 10.00<br />
Afforestation L C 1 Ha 1.25<br />
Masonry<br />
dams<br />
stop<br />
D<br />
C 4<br />
10.00<br />
Expected<br />
month &<br />
year <strong>of</strong><br />
completion<br />
(mm/yyyy)<br />
District Watershed <strong>Development</strong> Unit, Amreli 51