Non Conformity Report – T02.07/11<br />

Date of issued 07.07.2011 NCR issued by : Wieke Savitri<br />

Location<br />

PT. Tapian Nadenggan (Langga Payung<br />

Estate)<br />

Discussed with<br />

<strong>RSPO</strong> – Criterion : 4.3<br />

Practices minimise and control erosion and degradation crisis.<br />

: Managers and staffs<br />

Description of Finding:<br />

It was found during the field visit that the replanting area in Division 1 (LPYE11B21) with slopes of<br />

16-40% was not appropriately covered with Mucuna bracteata<br />

Classification Major Minor<br />

Corrective Action Taken:<br />

Mucchuna brachteata has been planted in Division 1 (LPYE11B21) since July to August 2011 for<br />

total area 37.83 ha as required by Working Instruction IK/LPYE/RPL/04 dated on 15.07.2011 by<br />

monitoring the rainfall.<br />

Auditee sign:<br />

Auditor Comments:<br />

Auditor Comments and Conclusion<br />

To check in next verification visit<br />

Appropriate action not taken<br />

Appropriate action taken<br />

Corrective action in compliance with the requirement<br />

Date of verification: 06.09.2011<br />

Auditor(s) sign:<br />