3.2. Detailed Non-Conformity Report, Corrective Actions Taken and Auditors’ Conclusions<br />

Non Conformity Report – T01.07/11<br />

Date of issued 07.07.2011 NCR issued by : Wieke Savitri<br />

Location<br />

PT. Tapian Nadenggan (Langga Payung<br />

Estate)<br />

Discussed with<br />

: Managers and staffs<br />

<strong>RSPO</strong> – Criterion : 4.1<br />

Operating procedures are appropriately documented and consistently implemented and<br />

monitored.<br />

Description of Finding:<br />

In Standard Operating Procedure for replanting doesn’t explain the timetable to plant legume cover<br />

crops.<br />

Classification Major Minor<br />

Corrective Action Taken:<br />

Had revised the Working Instruction IK/LPYE/RPL/04 “Nursery, Planting and Maintenance of<br />

Legumes Cover Crops” dated on 15.07.2011 by defining the timetable to plant LCC 2 weeks after<br />

chipping process in flat area or 2 weeks after terracing process in undulating area.<br />

Auditee sign:<br />

Auditor Comments:<br />

Auditor Comments and Conclusion<br />

To check in next verification visit<br />

Appropriate action not taken<br />

Appropriate action taken<br />

Corrective action in compliance with the requirement<br />

Date of verification: 06.09.2011<br />

Auditor(s) sign:<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 36