17.06.2014 Views

RSPO CERTIFICATION ASSESSMENT PUBLIC SUMMARY REPORT

RSPO CERTIFICATION ASSESSMENT PUBLIC SUMMARY REPORT

RSPO CERTIFICATION ASSESSMENT PUBLIC SUMMARY REPORT

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The application of POME as organic fertilizer in Langga Payung Estate based on land application<br />

research by Lembaga Penelitian Universitas Sumatera Utara, the last record refered to No. 01 –<br />

03/H5.2.3.1/PPM/K5/2011 dated on 07.01.2011. The test result of BOD range of the applied POME<br />

in three ponds are between 1,264 – 1,516 mg/l, still below the maximum standard 5,000 mg/l as<br />

required by “PerMenLH No.29/2009” The application of EFB in Langga Payung Estate in Division<br />

area II, IV, V and VI with the dosage 30 t/ha. Fertilizing program developed by SMARTRI covers time<br />

of application and type and dosage of fertilizer. Combination application of EFB and POME in Langga<br />

Payung Estates in recent years show that usage of chemical fertilizer was being reduced.<br />

Compliance Status : Full..<br />

Criterion 4.3<br />

Practices minimise and control erosion and degradation of soils<br />

PTTN has soil maps for each estate (Langga Payung Estate, Paya Baung Estate, and Normark<br />

Estate) which categorize the classes of land suitability based on parameters of slope, texture and soil<br />

limiting factors. There are no fragile or problem soils being classified on all the 3 soil maps.<br />

PTTN has established management strategy to minimize and control erosion and degradation of soils<br />

by planting Legume Cover Crops, terracing on undulating to steep areas, pruning and frond stacking<br />

besides having routine road maintenance program. Roadmaintenance is carried out bysandstone<br />

(sirtu) gravelling to make the road surface hard and compact.<br />

PTTN established procedure for land preparation for replanting, however , it was found during the<br />

field visit that the replanting area in Division 1 (LPYE11B21) with slope 16 - 40 % was not<br />

appropriately covered by Muccuna brachteata.<br />

A Minor non-compliance was issued. (See NCR T-02.07/2011)<br />

Compliance Status : Not Compliant<br />

Figure 3 Soil map in Normark Estate<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!