on 01.07.2010. Evaluation is done regulary every six month by <strong>RSPO</strong> Officers in each unit which<br />

has to keep track of its (PTTN’s) legal requirements and make sure that they are complied with.<br />

Since PTTN has SM-K3 certification by Ministry of Labor of Republic Indonesia, the <strong>RSPO</strong> Officer has<br />

to make sure that the responsible personnel – engineers, boiler men, electricians, have the necessary<br />

qualifications, and the equipments – boilers and diesel generators – have the necessary certifications<br />

and the permits are still valid. The evidence of evaluation is recorded in “Form evaluasi kepatuhan<br />

kepada Peraturan, Perundangan dan Persyaratan lainnya (02/ENVD-EK-LH/X/2010)”, the last<br />

evaluation was done on 24.01.2011. All the documents were checked and mostly found to be in legal<br />

compliance. However, compliance for some regulations at regency (Kabupaten) level was<br />

outstanding due to the division of Kabupaten Tapanuli Selatan into Kabupaten Padang Lawas Utara<br />

and Labuhanbaru Selatan. Nevertheless, PTTN has taken the required steps to fulfill the outstanding<br />

regulation compliance as it needs time for the regency government to process them.<br />

Compliance Status : Full.<br />

Criterion 2.2<br />

The right to use the land can be demonstrated and is not legitimately contested by local<br />

communities with demonstrable rights<br />

Currently, there are no claims on PTTN-Langga Payung Mill by anyone based on interview with local<br />

communities and other stakeholders during public consultation. SMART Tbk took over the land from<br />

established company PT. Tapian Nadenggan in 1989, not directly from the local community. The mill /<br />

estate managers have ensured proper registration of their HGU certificates in register. (2.2.1). The<br />

boundaries of PTTN land were easily identified being demarcated by T-0 pillars, their identification<br />

numbers corresponding with points in the maps in HGU (Land Use Title) (2.2.2). There is mechanism<br />

to monitor and maintain the boundary stones periodically as shown in “Data Monitoring dan<br />

Perawatan Patok Batas BPN Report ”, which conducted every 6 month by HCV Officer,<br />

acknowledged by Estate Manager. The maintenance include cleaning and repainting the boundaries<br />

stones, and sometimes repairing the damaged boundaries stones or repositioning using GPS if the<br />

boundaries stones are relocated or missed. There is procedure for resolving any conflict over land<br />

refers to “Pedoman Teknis Persiapan Lahan SMART No. SOP/NP/SMART/XII/MCAR001, Chapter<br />

XII,. Penanganan Keluhan dan Ketidakpuasan” dated on 1 July 2010 and “SOP Penanganan Keluh<br />

Kesah dan Ketidakpuasan No. PT. TN-LPYM/<strong>RSPO</strong>-SOP/02, (2.2.3).<br />

Compliance Status : Full.<br />

Criterion 2.3<br />

Use of land for oil palm does not diminish the legal rights or customary rights of other users,<br />

without their free, prior and informed consent<br />

As far as could be ascertained, there is no customary right of other users, according to HCV<br />

assessment report there was no indigenous people around the mill and estates.<br />

Compliance Status : Full.<br />

Criterion 3.1<br />

There is an implemented management plan that aims to achieve long term economic and<br />

financial viability<br />

PTTN has long term projection (2010 – 2020) for its crop, including key performance data for its mill<br />

and estates as part of its long term economic planning for all corporate of SMART Tbk Group,<br />

including mill allocation, production of FFB (tonnage) FFB/ ha (yield); OER, by predicting inflation<br />

rate; exchange rate; interest rate; portion cash; dividen; non deductible expenses; working hours;<br />

turnover; % allowance for doubtful accounts, age of asset; price of FFB purchase. During the<br />

projection period the mill capacity is 60 FFB/ hour and no plan to increase the mill capacity.<br />

Compliance Status : Full.<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 20