File - Roundtable on Sustainable Palm Oil
File - Roundtable on Sustainable Palm Oil
File - Roundtable on Sustainable Palm Oil
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 1 of 46<br />
RSPO CERTIFICATION ASSESSMENT<br />
PUBLIC SUMMARY REPORT<br />
IOI CORPORATION BERHAD<br />
(9027-W)<br />
RSPO Membership No: 2-0002-04-000-00<br />
MANAGEMENT UNIT<br />
Pukin Grouping, Johor, Malaysia<br />
Certificate No: RSPO 927888<br />
Issued date: 13 June 2012<br />
Expiry date: 12 June 2017<br />
Assessment Type Assessment Dates<br />
Initial Certificati<strong>on</strong> 08 – 11 December 2010<br />
Surveillance 1<br />
Surveillance 2<br />
Surveillance 3<br />
Surveillance 4<br />
Re-Certificati<strong>on</strong><br />
Moody Internati<strong>on</strong>al Certificati<strong>on</strong> (Malaysia) Sdn. Bhd. (188296-W)<br />
6-L12-01, Level 12, Tower 2, Menara PGRM No. 6 & 8 Jalan Pudu Ulu, Cheras, 56100 Kuala Lumpur, Malaysia<br />
Teleph<strong>on</strong>e:+00 (603) 9283 9881 Facsimile:+00 (603) 9284 8187 Email: ba.service@intertek.com<br />
Website: www.intertek.com; www.moodyint.com<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 2 of 46<br />
TABLE OF CONTENTS<br />
Secti<strong>on</strong> C<strong>on</strong>tent Page No<br />
1.0 SCOPE OF CERTIFICATION ASSESSMENT 3<br />
1.1 Introducti<strong>on</strong> 3<br />
1.2 Locati<strong>on</strong> (address, GPS and map) mill, estates and hectarage 3<br />
1.3 Descripti<strong>on</strong> of supply base (fruit sources) 3<br />
1.4 Date of plantings and cycle 3<br />
1.5 Other certificati<strong>on</strong>s held 4<br />
1.6 Organizati<strong>on</strong>al informati<strong>on</strong>/c<strong>on</strong>tact pers<strong>on</strong> 4<br />
1.7 Time Bound Plan for Other Management Units 4<br />
1.8 T<strong>on</strong>nages Certified 5<br />
1.9 Abbreviati<strong>on</strong>s Used 6<br />
2.0 ASSESSMENT PROCESS 6<br />
2.1 Assessment Methodology, Programme & Site Visits 6<br />
2.2 Date of next scheduled visit 7<br />
2.3 Qualificati<strong>on</strong>s of the Lead Assessor and Assessment Team 7<br />
2.4 Certificati<strong>on</strong> Body 7<br />
2.5 Outline of how stakeholder c<strong>on</strong>sultati<strong>on</strong> was managed 7<br />
3.0 ASSESSMENT FINDINGS 8<br />
3.1 Summary of findings 8-18<br />
3.2 Details of Identified N<strong>on</strong>compliance and Corrective Acti<strong>on</strong>s, Observati<strong>on</strong>s and<br />
19-22<br />
Identified Positive Elements<br />
3.3 Issues Raised by Stakeholders and Findings related to each issue 22<br />
4.0 ASSESSMENT CONCLUSION AND RECOMMENDATION 22<br />
4.1 Acknowledgement of Internal Resp<strong>on</strong>sibility and C<strong>on</strong>firmati<strong>on</strong> of Assessment<br />
23<br />
Findings<br />
APPENDICES<br />
Appendix A Qualificati<strong>on</strong>s of the Lead Assessor and Assessment Team 24<br />
Appendix B Certificati<strong>on</strong> Assessment Programme 25-26<br />
Appendix C Maps of locati<strong>on</strong> – mill, estates and HCVs 27-28<br />
Appendix D Photographs of Assessment findings at PUKIN GROUPING-PMU 39-40<br />
Appendix E Stakeholders comment, PUKIN GROUPING-PMU resp<strong>on</strong>se and MICM remarks 40<br />
Appendix F Time Bound Plan for the Other Management units (updated for 2011/ 2012) 42<br />
Appendix G Supply Chain Requirements which are applicable to CPO Mills 43<br />
Appendix H MICM - RSPO Certificate details for IOI-PUKIN GROUPING-PMU 46<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 3 of 46<br />
1.0 SCOPE OF CERTIFICATION ASSESSMENT<br />
1.1 Introducti<strong>on</strong><br />
This certificati<strong>on</strong> assessment was c<strong>on</strong>ducted <strong>on</strong> the Pukin Grouping-Plantati<strong>on</strong> Management Unit (PMU) of IOI<br />
Corporati<strong>on</strong> Berhad, <strong>on</strong> the 8 to 11 December 2010, to assess if the organizati<strong>on</strong>‟s operati<strong>on</strong>s of the mill and its supply<br />
bases were in compliance against the RSPO Principles and Criteria (October 2007); Malaysian Nati<strong>on</strong>al Interpretati<strong>on</strong><br />
(MY-NI, November 2010) and RSPO Supply Chain Certificati<strong>on</strong> (November 2009) for POM.<br />
The plantati<strong>on</strong> management unit (PMU) or management unit is equivalent to a certificati<strong>on</strong> unit as defined in the RSPO<br />
Certificati<strong>on</strong> Systems Document. Each PMU c<strong>on</strong>sists of <strong>on</strong>e mill and its supply bases which are made up of estates<br />
owned by IOI Corporati<strong>on</strong> Berhad (IOI).<br />
1.2 Locati<strong>on</strong> (address, GPS and map)<br />
The PUKIN GROUPING-PMU c<strong>on</strong>sist of <strong>on</strong>e (1) palm oil mill namely Pukin <strong>Palm</strong> <strong>Oil</strong> Mill and four (4) estates i.e. Pukin,<br />
Shahzan 1, Shahzan 2 and Segamat estates. Details of the addresses and locati<strong>on</strong>s are as indicated in Table 1. The<br />
locati<strong>on</strong>, field and topography maps are detailed in Appendix C1 – C9.<br />
Table 1: Address and GPS Locati<strong>on</strong><br />
Name<br />
Pukin <strong>Palm</strong> <strong>Oil</strong> Mill<br />
Pukin Estate<br />
Shahzan 1 Estate<br />
Shahzan 2 Estate<br />
Segamat Estate<br />
Address<br />
30km, Lebuhraya Tun Abdul Razak,<br />
Kerat<strong>on</strong>g, Rompin, Pahang<br />
30km, Lebuhraya Tun Abdul Razak,<br />
Kerat<strong>on</strong>g, Rompin, Pahang<br />
30km, Lebuhraya Tun Abdul Razak,<br />
Kerat<strong>on</strong>g, Rompin, Pahang<br />
36km, Lebuhraya Tun Abdul Razak,<br />
Kerat<strong>on</strong>g, Rompin, Pahang<br />
Km 5, Jalan Segamat Muar, 85009<br />
Segamat, Johor<br />
GPS Reference<br />
Latitude<br />
L<strong>on</strong>gitude<br />
02° 43‟07.9” N 102° 54‟28.7” E<br />
02° 43‟07.9” N 102° 54‟28.7” E<br />
02° 47‟58.5” N 102° 50‟56.3” E<br />
02° 48‟59.6” N 102° 52‟26.5” E<br />
02° 29‟22.0” N 102° 52‟58.5” E<br />
1.3 Descripti<strong>on</strong> of supply base (fruit sources)<br />
The 4 estates which are owned by IOI are the main sources of FFB to the POM at PUKIN GROUPING-PMU as indicated<br />
in Table 2.<br />
There were other estates owned by IOI, which also supplied FFB to the POM. These other supply bases have also been<br />
c<strong>on</strong>sidered in the overall assessment <strong>on</strong> PUKIN GROUPING-PMU and have been verified to be part of the Time Bound<br />
Plan committed by IOI for certificati<strong>on</strong>. (Refer to para.1.8)<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 4 of 46<br />
Table 2: Estate Area Summary and FFB Producti<strong>on</strong><br />
Estate<br />
Total<br />
Area Summary (ha)<br />
Planted<br />
FFB (MT)<br />
Immature (ha)<br />
Pukin Estate 2,437.26 2,198.0 20,975.26 629.0<br />
Shahzan 1 Estate 1,562.95 1,517.0 25,045.86 Nil<br />
Shahzan 2 Estate 1,640.77 1,602.0 32,633.76 Nil<br />
Segamat Estate 1,921.62 1,779.0 24,959.39 Nil<br />
Total 7,562.60 7,096.0 103,614.27 629.0<br />
Note: The FFB producti<strong>on</strong> figures above were the actual output submitted for the financial year June 2009 to July 2010.<br />
1.4 Date of plantings and cycle<br />
The 4 estates were developed between 1988 and 2006 and are mainly in the 1 st cycle of planting except for the Pukin<br />
estate which has started <strong>on</strong> some re-planting (2 nd cycle). The replanting at Pukin estate was d<strong>on</strong>e in stages from 2007 to<br />
2010 between 168 to 250 hectares annually. The age profile is as shown in Table 3.<br />
Table 3: Age Profile of Planted <strong>Oil</strong> <strong>Palm</strong><br />
Year of Planting<br />
Age of <strong>Palm</strong><br />
(years)<br />
Planted (Ha)<br />
Pukin Shahzan 1 Shahzan 2 Segamat<br />
2007-2010 < 3 (immature) 629.0 - - -<br />
2004-2006 3-5 - - - 96.0<br />
1994-2003 6-15 1,384.0 1,517.0 1,602.0 694.0<br />
1988-1993 16-25 185.0 - - 989.0<br />
Total 2,198.0 1,517.0 1,602.0 1,779.0<br />
Note: The above data are extracted from the respective Area Statement submitted as at 30 November 2010.<br />
1.5 Other certificati<strong>on</strong>s held and Use of RSPO Trademarks<br />
PUKIN GROUPING-PMU does not hold any other certificati<strong>on</strong>s.<br />
1.5.1 The RSPO‟s trademarks and logo are not being used by the PMU audited.<br />
1.6 Organisati<strong>on</strong>al informati<strong>on</strong> / C<strong>on</strong>tact Pers<strong>on</strong><br />
Mr. Too Heng Liew<br />
Head of Sustainability<br />
IOI Corporati<strong>on</strong> Berhad<br />
Level 8, Two IOI Square, IOI Resort,<br />
62502 Putrajaya, Malaysia<br />
Tel: + 603 8947 8888<br />
Fax: + 603 8947 8888<br />
Email: hl.too@ioigroup.com<br />
1.7 Time Bound Plan for Other Management Units<br />
IOI operates 12 palm oil mills and 77 oil palm estates throughout Malaysia and Ind<strong>on</strong>esia. The organizati<strong>on</strong> is a<br />
pi<strong>on</strong>eering member of RSPO and has been taking an active role in the RSPO certificati<strong>on</strong> processes since 2004.<br />
Currently, a significant number of its Plantati<strong>on</strong> Management Units (PMU) is undergoing the RSPO certificati<strong>on</strong> process in<br />
accordance with its time bound plan to achieve RSPO certificati<strong>on</strong> for all its PMUs by 2016. Details of the time bound plan<br />
as submitted by IOI are as per Appendix F.<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 5 of 46<br />
1.8 T<strong>on</strong>nages Certified<br />
The breakdown of the all suppliers and their estimated t<strong>on</strong>nages of FFB supplied to the POM of PUKIN GROUPING-PMU<br />
from June 2009 to July 2010 were as follows:<br />
# Estate /Supplier<br />
FFB Processed<br />
(MT)<br />
Main Receiving Mill Details of RSPO Assessed /<br />
Certified FFB (if any)<br />
1 Pukin Estate 20,975.26 Pukin <strong>Oil</strong> Mill Covered under this report.<br />
2 Shahzan 1 Estate 25,045.86 Pukin <strong>Oil</strong> Mill<br />
3 Shahzan 2 Estate 32,633.76 Pukin <strong>Oil</strong> Mill<br />
4 Segamat Estate 24,959.39 Pukin <strong>Oil</strong> Mill<br />
5<br />
6<br />
Leepang A<br />
Laukin A<br />
19,713.38<br />
9,439.99<br />
Bukit Leelau <strong>Oil</strong> Mill<br />
Bukit Leelau <strong>Oil</strong> Mill<br />
Covered under SIRIM QAS<br />
Internati<strong>on</strong>al Certificate no: RSPO<br />
010 dated 19 November 2010 -<br />
7 Detas 1,619.28 Bukit Leelau <strong>Oil</strong> Mill<br />
Bukit Leelau Grouping.<br />
8 Merch<strong>on</strong>g 1,289.16 Bukit Leelau <strong>Oil</strong> Mill<br />
9 Mekassar 771.92 Bukit Leelau <strong>Oil</strong> Mill<br />
10 Bukit Leelau 1,528.57 Bukit Leelau <strong>Oil</strong> Mill<br />
11 Bukit Serampang 217.97 Gomali <strong>Oil</strong> Mill Covered under SGS Certificate no:<br />
RSPO/PM-00573 dated 23 August<br />
12 Sagil 92.39 Gomali <strong>Oil</strong> Mill 2010-Gomali Grouping.<br />
13 Manna (Outgrower) 9.58 Bukit Leelau <strong>Oil</strong> Mill N.A<br />
14 Ladang Haji Harun (Outgrower) 4.42 Bukit Leelau <strong>Oil</strong> Mill N.A<br />
15 IOI Resort 1.58 Gomali <strong>Oil</strong> Mill N.A<br />
Total 138,302.51<br />
The summary of the total estimated t<strong>on</strong>nages of FFB supplied from the 4 estates assessed and other suppliers at PUKIN<br />
GROUPING-PMU is as per below:<br />
# Estate / Supplier FFB Processed (MT)<br />
1 - 4 As indicated above 103,614.27<br />
5 - 15 Other Suppliers / Sources 34,688.24<br />
Total 138,302.51<br />
Note:<br />
<br />
<br />
All the estates / suppliers are under RSPO assessed / certified sources as indicated above except for outgrowers<br />
- Manna Estate, Ladang Haji Harun and the FFB from IOI Resort.<br />
Therefore the FFB processed by PUKIN GROUPING-PMU from RSPO assessed estates / suppliers totals about<br />
138, 286.93 metric t<strong>on</strong>s (i.e. 138,302.51 less 15.58 MT).<br />
Based <strong>on</strong> details above, the approximate annual certifiable t<strong>on</strong>nages of CPO and PK producti<strong>on</strong> under PUKIN<br />
GROUPING-PMU are detailed as follows:<br />
FFB Processed (MT) from RSPO<br />
assessed / certified sources<br />
CPO Producti<strong>on</strong> claimed for<br />
certificati<strong>on</strong> (MT)<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012<br />
PK Producti<strong>on</strong> claimed for<br />
certificati<strong>on</strong> (MT)<br />
138,286.93 31,139.91 6,562.70<br />
Book keeping requirements for the CPO at the POM was also assessed and found to be capable of complying with the<br />
relevant elements of the RSPO Supply Chain Certificati<strong>on</strong> for the POM. M<strong>on</strong>itoring of CPO quantities which is based <strong>on</strong>
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 6 of 46<br />
the Mass Balance model is verified. Details of activities checked for the Supply Chain requirements at the POM are as<br />
per Appendix G to this report.<br />
The annual t<strong>on</strong>nages of CPO and PK producti<strong>on</strong> by the PMU and estates and certified suppliers as assessed (based <strong>on</strong><br />
2009 /2010 verified data) are detailed as follows:<br />
FFB Processed (MT) from RSPO<br />
assessed / certified sources<br />
CPO Producti<strong>on</strong> (MT)<br />
PK Producti<strong>on</strong> (MT)<br />
138,286.93 31,139.91 6,562.70<br />
OER: 22.52% KER: 4.75%<br />
Note1: Producti<strong>on</strong> quantities / volumes for 2010 / 2011 (as submitted) are:<br />
195,170.30 42,550.60 7,863.00<br />
OER: 21.80% KER: 4.03%<br />
Note2: Projected producti<strong>on</strong> quantities / volumes for 2011 / 2012 are:<br />
265,460.00 60,392.00 13,273.00<br />
OER: 22.75% KER: 5.00%<br />
Note3: 100% of FFB to be received by Pukin <strong>Oil</strong> Mill will be RSPO certified subject to Pukin PMU being certified.<br />
1.9 Abbreviati<strong>on</strong>s Used<br />
AMESU All Malayan Estate Staff Uni<strong>on</strong> MSDS Material Safety Data Sheets<br />
CHRA Chemical Health Risk Assessment MTCS Malaysia Timber Certificati<strong>on</strong> Scheme<br />
CPO Crude <strong>Palm</strong> <strong>Oil</strong> NCR N<strong>on</strong>-C<strong>on</strong>formance Report<br />
CSDS Chemical Safety Data Sheets NGO N<strong>on</strong>-Government Organisati<strong>on</strong><br />
DOE Department of Envir<strong>on</strong>ment NUPW Nati<strong>on</strong>al Uni<strong>on</strong> Plantati<strong>on</strong> Workers<br />
ECC Employees C<strong>on</strong>sultative Council OER <strong>Oil</strong> Extracti<strong>on</strong> Rate<br />
EHS Envir<strong>on</strong>mental Health & Safety OSH Occupati<strong>on</strong>al Safety & Health<br />
EFB Empty Fruit Bunch PEFC Programme for the Endorsement of Forest<br />
Certificati<strong>on</strong><br />
EIA Envir<strong>on</strong>mental Impact Assessment PK <strong>Palm</strong> Kernel<br />
ERT Endangered, Rare & Threatened species PKO <strong>Palm</strong> Kernel <strong>Oil</strong><br />
ETP Effluent Treatment Plant POM <strong>Palm</strong> <strong>Oil</strong> Mill<br />
FFB Fresh Fruit Bunch POME <strong>Palm</strong> <strong>Oil</strong> Mill Effluent<br />
GAP Good Agriculture Practice PPE Pers<strong>on</strong>al Protective Equipment<br />
HCV High C<strong>on</strong>servati<strong>on</strong> Values SIA Social Impact Assessment<br />
IPM Integrated Pest Management SOP Standard Operating Procedures<br />
IUCN<br />
Internati<strong>on</strong>al Uni<strong>on</strong> for C<strong>on</strong>servati<strong>on</strong> of<br />
Nature<br />
SOCSO<br />
Social Security Insurance<br />
KER Kernel Extracti<strong>on</strong> Rate TQEM Total Quality Envir<strong>on</strong>ment Management<br />
LTA Lost Time Accidents USECHH Use and Standards of Exposure of Chemicals<br />
Hazardous to Health<br />
MICM<br />
Moody Internati<strong>on</strong>al Certificati<strong>on</strong> (Malaysia)<br />
Sdn Bhd<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 7 of 46<br />
2.0 ASSESSMENT PROCESS<br />
2.1 Assessment Methodology, Programme and Site Visits<br />
Assessment methodology included physical site inspecti<strong>on</strong>s, observing relevant processes, including healthcare activities,<br />
interviewing the Mill Manager, Estate Managers, Executives, operati<strong>on</strong>al staff, foreign workers, female workers and their<br />
families, external stakeholders, including NGOs, review of documentati<strong>on</strong>, verificati<strong>on</strong> of records, communicati<strong>on</strong>s and<br />
m<strong>on</strong>itoring data. Checklist and questi<strong>on</strong>naires were widely used. Samples for assessment were taken <strong>on</strong> a random basis.<br />
Details of assessment programme are given in Appendix B.<br />
This report has been independently reviewed for c<strong>on</strong>formance with the RSPO certificati<strong>on</strong> system requirements and<br />
reviewed for its technical c<strong>on</strong>tent by the MICM Internal Review Panel.<br />
2.2 Date of next scheduled visit<br />
The next scheduled visit is the surveillance audit which will be carried out within 12 m<strong>on</strong>ths from the date of RSPO<br />
acceptance of this public summary report.<br />
2.3 Qualificati<strong>on</strong>s of the Lead Assessor and Assessment Team<br />
Competency details of the Lead Assessor and Assessment Team are given in Appendix A.<br />
2.4 Certificati<strong>on</strong> Body<br />
Intertek Moody is the trading name / brand name of Moody Internati<strong>on</strong>al Certificati<strong>on</strong> (Malaysia) Sdn Bhd. The Intertek<br />
Moody Group is a worldwide technical services organizati<strong>on</strong> dedicated to reducing clients' risks by providing technical<br />
inspecti<strong>on</strong> services, management system certificati<strong>on</strong> in quality, envir<strong>on</strong>mental, occupati<strong>on</strong>al safety & health and product<br />
certificati<strong>on</strong>, Marine Sustainability Chain-of-Custody, MTCS and PEFC Chain-of Custody certificati<strong>on</strong> in applicable<br />
industry sectors including the agricultural and forestry sectors. Intertek Moody operates globally providing clients with a<br />
wide-ranging technical inspecti<strong>on</strong> expertise and access to thousands of skilled specialists worldwide. Our Management<br />
Systems Certificati<strong>on</strong> business is ranked in the top 10 worldwide, and is available globally offering certificati<strong>on</strong> across a<br />
wide range of industries.<br />
2.5 Outline of how stakeholder c<strong>on</strong>sultati<strong>on</strong> was managed<br />
Stakeholder c<strong>on</strong>sultati<strong>on</strong>s began with notificati<strong>on</strong> of upcoming assessment through websites of RSPO, IOI and MICM. E-<br />
mails, facsimiles and letters of the same were sent to applicable stakeholders including government agencies and NGOs.<br />
Teleph<strong>on</strong>e enquiries were made and received prior to the actual assessment from a few stakeholders and were dealt with<br />
accordingly.<br />
During the assessment stakeholders were interviewed and their feedbacks were recorded. Am<strong>on</strong>g the stakeholders<br />
c<strong>on</strong>sulted were workers, employee c<strong>on</strong>sultative committee leaders and members, women representatives, government<br />
departments / agencies and NGOs.<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 8 of 46<br />
The list of stakeholders c<strong>on</strong>sulted was as follows:<br />
Government Agencies<br />
Department of Envir<strong>on</strong>ment<br />
Department of Forestry<br />
Department of Occupati<strong>on</strong>al Safety & Health<br />
Department of Wildlife & Nati<strong>on</strong>al Parks<br />
Department of Indigenous People Affairs<br />
Department of Immigrati<strong>on</strong><br />
Labour Department<br />
Land Office<br />
NGOs<br />
Envir<strong>on</strong>mental Protecti<strong>on</strong> Society Malaysia (EPSM)<br />
Malaysian Nature Society<br />
Proforest Sdn Bhd<br />
<strong>Sustainable</strong> Development Network Malaysia (SUSDEN)<br />
Tenaganita Sdn Bhd<br />
Wild Asia, Malaysia<br />
Wetlands Internati<strong>on</strong>al (Malaysia)<br />
World Wildlife Fund (WWF), Malaysia<br />
Others<br />
AMESU HQ, Petaling Jaya<br />
Gender Committee Members<br />
Malaysia Crop Care and Public Health Associati<strong>on</strong><br />
Malaysian <strong>Palm</strong> <strong>Oil</strong> Board<br />
NUPW Kluang Branch<br />
NUPW POM Committee Members<br />
The Malayan Estates Staff Cooperative Society Bhd<br />
Social Security for Employees (SOCSO)<br />
3.0 ASSESSMENT FINDINGS<br />
3.1 Summary of findings<br />
Principle 1: Commitment to transparency<br />
Criteri<strong>on</strong> 1.1<br />
<strong>Oil</strong> palm growers and millers provide adequate informati<strong>on</strong> to other stakeholders <strong>on</strong><br />
envir<strong>on</strong>mental, social and legal issues relevant to RSPO Criteria, in appropriate languages & forms<br />
to allow for effective participati<strong>on</strong> in decisi<strong>on</strong> making.<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
The procedure for providing informati<strong>on</strong> and handling resp<strong>on</strong>ses and requests was<br />
available at the IOI- PUKIN GROUPING-PMU and records of corresp<strong>on</strong>dences<br />
made were maintained.<br />
The mill and estate management have resp<strong>on</strong>ded c<strong>on</strong>structively and promptly to<br />
requests for informati<strong>on</strong> from other stakeholders. This was evident from records<br />
sighted am<strong>on</strong>g which were letters, corresp<strong>on</strong>dences and minutes of meetings held<br />
with the local authorities, employee c<strong>on</strong>sultative committees and local community<br />
leaders.<br />
Complied<br />
Criteri<strong>on</strong> 1.2<br />
Management documents are publicly available, except where this is prevented by commercial<br />
c<strong>on</strong>fidentiality or where disclosure of informati<strong>on</strong> would result in negative envir<strong>on</strong>mental or social<br />
outcomes.<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
In line with the organizati<strong>on</strong>‟s policies IOI, PUKIN GROUPING-PMU has hard copies<br />
of the 7 types of documents that are required to be made available to the public.<br />
Similar documents were available in the IOI website.<br />
The statement that these documents can be made available to the public up<strong>on</strong><br />
request is also stipulated in the estates management plans.<br />
Complied<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 9 of 46<br />
Principle 2: Compliance with applicable laws and regulati<strong>on</strong>s<br />
Criteri<strong>on</strong> 2.1<br />
There is compliance with all applicable local, nati<strong>on</strong>al and ratified internati<strong>on</strong>al laws and<br />
regulati<strong>on</strong>s.<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
The PUKIN GROUPING-PMU has established a documented system explaining the<br />
mechanism for identifying, determining, reviewing and updating applicable legal and<br />
other requirements that the PMU has subscribed to.<br />
The legal register covering applicable local and internati<strong>on</strong>al laws and regulati<strong>on</strong>s<br />
were available at the mill with the Mill Manager and at each estate with the Estate<br />
Managers. The Mill and Estate Managers maintain the tracking for any changes in<br />
legal requirements. These were reviewed <strong>on</strong> yearly basis and updated (when<br />
necessary) with the compliance status indicated. The relevant legislati<strong>on</strong>s identified<br />
and listed were am<strong>on</strong>g others regarding safety and health, envir<strong>on</strong>mental<br />
management, polluti<strong>on</strong> management, chemical handling, usage and storage,<br />
schedule waste management. The Social Impact Assessments and Management<br />
Plans were made available at all the estates.<br />
During the site observati<strong>on</strong>s, interviews and records checking at the field and mill,<br />
there was sufficient evidence of compliance with the relevant laws, regulati<strong>on</strong>s, local<br />
and internati<strong>on</strong>al laws at that the POM and estates.<br />
However, the medical surveillance performed in the estates were not adequate<br />
as it did not cover all the workers involved in handling of chemicals as<br />
required by Regulati<strong>on</strong> 27 of OSH (USECHH) Regulati<strong>on</strong> 2000 and the<br />
recommendati<strong>on</strong> of the Chemical Hazards Risk Assessment (CHRA) report. In<br />
year 2009 till current in December 2010, the estates within the grouping did not<br />
send all workers who were exposed to chemicals for the annual medical<br />
surveillance by the Occupati<strong>on</strong>al & Health Dept. e.g. at the Segamat estate, in<br />
2009 - <strong>on</strong>ly 2 employees and in 2010 – <strong>on</strong>ly 6 employees out of a total of 43<br />
workers were medically examined.<br />
Criteri<strong>on</strong> 2.2<br />
The right to use the land can be dem<strong>on</strong>strated, and is not legitimately c<strong>on</strong>tested by local<br />
communities with dem<strong>on</strong>strable rights.<br />
See NCR #<br />
1<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
Copies of the land titles of all estates were sighted. The original copies are<br />
maintained by the Corporate Head office.<br />
The palm oil mill (POM) is located at the Pukin Estate. The estate lands were<br />
planted with oil palm trees since 1988 and the 1990‟s.<br />
There has been no recorded dispute over the ownership of the land. Legal boundary<br />
markers were sighted and maintained al<strong>on</strong>g the perimeters of estate lands which<br />
were mapped with a 1 - meter differential Global Positi<strong>on</strong>ing System (GPS).<br />
Complied<br />
Criteri<strong>on</strong> 2.3<br />
Use of the land for oil palm does not diminish the legal rights, or customary rights, of other users,<br />
without their free, prior and informed c<strong>on</strong>sent.<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
The estate lands at the PMU are legally owned by IOI and no other users were<br />
identified in the land area.<br />
There has been no dispute <strong>on</strong> the land rights at all the estate areas assessed as<br />
there were relatively no villages except for the Segamat estate. At the Segamat,<br />
there was no dispute from the local villages. Letters of c<strong>on</strong>sent to use the access<br />
roads at the estates, as right of way has been produced during the assessment.<br />
Complied<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 10 of 46<br />
Principle 3: Commitment to l<strong>on</strong>g-term ec<strong>on</strong>omic and financial viability<br />
Criteri<strong>on</strong> 3.1<br />
There is an implemented management plan that aims to achieve l<strong>on</strong>g term ec<strong>on</strong>omic and financial<br />
viability.<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
Each estate and mill within the PMU has documented management plans with the<br />
annual budget for FFB, CPO, PKO, OER and KER with projecti<strong>on</strong>s for the next 5<br />
years.<br />
A financial management system was sighted to m<strong>on</strong>itor the actual performance<br />
results <strong>on</strong> a daily, m<strong>on</strong>thly and annual basis. Reports by PUKIN GROUPING - PMU<br />
to the IOI management <strong>on</strong> the producti<strong>on</strong> performance and the OER as a measure<br />
of producti<strong>on</strong> efficiency were evidenced.<br />
Replanting programs had been implemented at the Pukin estate in year 2007 for<br />
about 629 ha. For the other estates, replanting was planned around year 2014<br />
<strong>on</strong>wards, over a 10 year period. The annual replanting percentages ranged from 5%<br />
to 10% of the total oil palm areas.<br />
Complied<br />
Principle 4: Use of appropriate best practices by growers and millers<br />
Criteri<strong>on</strong> 4.1<br />
Operating procedures are appropriately documented and c<strong>on</strong>sistently implemented and<br />
m<strong>on</strong>itored.<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
Standard Operating Procedures (SOP) for the estates and the mill were<br />
documented. M<strong>on</strong>itoring records were available such as store requisiti<strong>on</strong>s, store<br />
issuances of agro-chemicals, daily and weekly task completi<strong>on</strong> were properly<br />
maintained and their implementati<strong>on</strong> was noted to be c<strong>on</strong>sistent.<br />
It was noted that rat baiting would <strong>on</strong>ly be carried out when rat attacks are more that<br />
5% based <strong>on</strong> quality checks <strong>on</strong> the FFB crop.<br />
Complied<br />
Criteri<strong>on</strong> 4.2<br />
Practices maintain soil fertility at, or where possible improve soil fertility to, a level that ensures<br />
optimal and sustained yield.<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
Annual fertilizer applicati<strong>on</strong> program was m<strong>on</strong>itored and implemented according to<br />
the fertilizer recommendati<strong>on</strong>s as provided by the Agr<strong>on</strong>omist.<br />
Sampling of palm leaves for nutrient analysis was also carried out annually. Soil<br />
sampling was carried out as <strong>on</strong> 20% of the total fields each year and thus a single<br />
round of sampling were c<strong>on</strong>ducted <strong>on</strong> every field <strong>on</strong>ce in every 5 years.<br />
During field inspecti<strong>on</strong>s, mulching with EFB noted at planted areas. There was no<br />
evidence of any open burning.<br />
The dosages of dry POME applied was noted to be in accordance with the<br />
recommendati<strong>on</strong>s of the research centre of IOI, which was based <strong>on</strong> their analytical<br />
findings <strong>on</strong> POME utilizati<strong>on</strong>, to maintain the nutrient status and microbiological<br />
health of the soil.<br />
Complied<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 11 of 46<br />
Criteri<strong>on</strong> 4.3<br />
Practices minimise and c<strong>on</strong>trol erosi<strong>on</strong> and degradati<strong>on</strong> of soils.<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
There was no peat soil area or fragile soils within the estates.<br />
Inspecti<strong>on</strong> at sites provided evidence that soil erosi<strong>on</strong> counter-measures were taken<br />
which included:<br />
Fr<strong>on</strong>d stacking was carried out at alternate inter-rows of oil palm planting. After each<br />
harvesting, the fr<strong>on</strong>ds were cut into two pieces and stacked at the alternate interrows<br />
without hindering the future harvesting and evacuati<strong>on</strong> of the crop. Inter-row<br />
maintenance was d<strong>on</strong>e through selective weeding to ensure that the „woodies‟ are<br />
removed and that <strong>on</strong>ly soft weeds are growing. Fr<strong>on</strong>ds were also stacked al<strong>on</strong>g lips<br />
of terraced areas and parallel to streams to minimize soil runoff. At the Pukin Estate,<br />
there were some hilly areas and based <strong>on</strong> the slope maps provided, about 26% of<br />
the slopes there were in excess of 8 degrees. Terrace planting was adopted at<br />
slopes which are more than 8 degrees. At slopes which were less than 8 degrees,<br />
the fr<strong>on</strong>ds were stacked al<strong>on</strong>g the c<strong>on</strong>tours of the slopes as part of preventi<strong>on</strong> of soil<br />
erosi<strong>on</strong> programme. Stop bunds were c<strong>on</strong>structed within the planting terraces<br />
Regular road and culvert maintenance was performed. Planting of „vetiver‟ grass and<br />
natural riverine plants was observed to minimize stream and river bank erosi<strong>on</strong> and<br />
to restore riparian areas and buffer z<strong>on</strong>es demarcated.<br />
However, it was noted at the Pukin estate (i.e. at PR10A), that leguminous<br />
cover has not been established at certain secti<strong>on</strong>s of the immature area, which<br />
should be established when the ground c<strong>on</strong>diti<strong>on</strong> was ready.<br />
Criteri<strong>on</strong> 4.4<br />
Practices maintain the quality and availability of surface and ground water.<br />
See OBS #<br />
5<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
IOI‟s policy <strong>on</strong> slope protecti<strong>on</strong> and river buffer-z<strong>on</strong>ing was available for inspecti<strong>on</strong><br />
and for public viewing.<br />
The PMU has identified appropriate buffer z<strong>on</strong>es al<strong>on</strong>g all natural waterways i.e.<br />
rivers and streams passing through the estates. Buffer z<strong>on</strong>e demarcati<strong>on</strong> was d<strong>on</strong>e<br />
in accordance with the Department of Irrigati<strong>on</strong> & Drainage (DID) directives and no<br />
spraying or manuring activities were performed within the demarcati<strong>on</strong> z<strong>on</strong>es.<br />
Appropriate markings and signages were found to be placed. The estates have<br />
Envir<strong>on</strong>mental management plans to maintain the buffer z<strong>on</strong>es. The workers were<br />
trained and informed to avoid spraying of agro-chemicals at the buffer z<strong>on</strong>es.<br />
The POM had m<strong>on</strong>itored and c<strong>on</strong>trolled discharges to waterways with installati<strong>on</strong> of<br />
silt traps to reduce suspended solids and c<strong>on</strong>taminants to meet the DOE limits. Daily<br />
checks for leakages were observed <strong>on</strong> the POME which was channeled to the<br />
Effluent Treatment P<strong>on</strong>ds (ETP) for dislodging. Water and treated POME samples<br />
were taken weekly and sent to external laboratories for analysis.<br />
Estate river water analysis was carried out at every 6 m<strong>on</strong>ths interval. For the<br />
adjacent river that supplies to the mill, it was d<strong>on</strong>e <strong>on</strong> a 3 m<strong>on</strong>ths interval. Rainfall<br />
data was maintained daily and annual rainfall recorded range from 3500mm to<br />
5000mm. Water Management Plans were available and m<strong>on</strong>itoring d<strong>on</strong>e <strong>on</strong> the<br />
water usage at the mills. On average, the water usage at the mill was about 1.3<br />
t<strong>on</strong>ne / t<strong>on</strong>ne FFB processed and efforts being made to gradually reduce the usage.<br />
The m<strong>on</strong>itoring of the effluent quality at the POM was noted to be d<strong>on</strong>e with m<strong>on</strong>thly<br />
analysis results submitted by an independent laboratory. The results were noted to<br />
be within the specificati<strong>on</strong>s and limits permitted.<br />
The water management plan d<strong>on</strong>e in October 2010 was approved and authorized by<br />
the senior management pers<strong>on</strong>nel of the grouping. The raw water intake(s) points<br />
used for treating water for human c<strong>on</strong>sumpti<strong>on</strong> in the estates, except Segamat<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 12 of 46<br />
Estate (which was using the state government water), had not been adequately<br />
secured and not adequately tested, based <strong>on</strong> the Ministry of Health (MOH),<br />
Malaysia‟s requirements or any other equivalent requirements. The n<strong>on</strong>compliance<br />
issued were as follows:<br />
Raw water intake points at Pukin POM’s pump house noted to be<br />
unsecured and lack of SOP <strong>on</strong> the safety and health precauti<strong>on</strong>s including<br />
appropriate signage(s).<br />
Tube well’s water used for human c<strong>on</strong>sumpti<strong>on</strong> located at Shahzan 1<br />
estate noted to be potentially exposed to pesticide spraying and raw water<br />
samples from the tube well must be tested periodically for pesticide based<br />
<strong>on</strong> MOH or equivalent requirements. The tube well area not secured and<br />
warning signage(s) / safety & health precauti<strong>on</strong>s were not available /<br />
displayed during audit time.<br />
Criteri<strong>on</strong> 4.5<br />
Pests, diseases, weeds and invasive introduced species are effectively managed using appropriate<br />
Integrated Pest Management (IPM) techniques.<br />
See NCR #<br />
3<br />
See NCR #<br />
4<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
PUKIN GROUPING-PMU had adopted the IOI group policy and Internal<br />
Envir<strong>on</strong>mental Management & M<strong>on</strong>itoring Plan <strong>on</strong> IPM system which was made<br />
available.<br />
Inspecti<strong>on</strong> at site observed the following:<br />
Parasitoid host and beneficial predator plants such as Tunera subulata, Cassia<br />
cobanensis and Antig<strong>on</strong><strong>on</strong> leptopus had been planted at some stretches al<strong>on</strong>g the<br />
access roads within the estates. M<strong>on</strong>itoring and records of areas where pesticides<br />
were being used and the usage per hectare basis were maintained. There was<br />
evidence of studies and m<strong>on</strong>itoring d<strong>on</strong>e by the IOI-operating units <strong>on</strong> the IPM<br />
system adopted by them such as the detecti<strong>on</strong> of pest infestati<strong>on</strong> as per the FAO<br />
guidelines and census taking.<br />
Barn owls were used as part of natural c<strong>on</strong>trol for rats and barn owl boxes<br />
were erected. However, it was observed that the number of barn owl boxes in<br />
the estates was below the target set by the company (i.e. 1 box to 15 hectare).<br />
The level required should be reviewed and be set in accordance with the<br />
m<strong>on</strong>itoring d<strong>on</strong>e <strong>on</strong> the rat bait dosages at the estates and severity of the<br />
situati<strong>on</strong>.<br />
Criteri<strong>on</strong> 4.6<br />
Agrochemicals are used in a way that does not endanger health or the envir<strong>on</strong>ment. There is no<br />
prophylactic use of pesticides, except in specific situati<strong>on</strong>s identified in nati<strong>on</strong>al Best Practice<br />
guidelines. Where agrochemicals are used that are categorised as World Health Organizati<strong>on</strong> Type<br />
1A or 1B, or are listed by the Stockholm or Rotterdam C<strong>on</strong>venti<strong>on</strong>s, growers are actively seeking<br />
to identify alternatives, and this is documented.<br />
See OBS #<br />
1<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
The estates have procedures for the use of agrochemicals for pest c<strong>on</strong>trol which<br />
stipulated the use of <strong>on</strong>ly pesticides officially registered under Secti<strong>on</strong> 53A of the<br />
Pesticide Act (1974); and in accordance with OSH (USECHH) Regulati<strong>on</strong>s (2000).<br />
Pesticides storage was noted to be in accordance with the Occupati<strong>on</strong>al Safety and<br />
Health Act 1994 (Act 514) and Chemical Health and Risk Assessment (CHRA)<br />
recommendati<strong>on</strong>s.<br />
Inspecti<strong>on</strong> at sites observed that pesticides were kept under lock and key. Empty<br />
c<strong>on</strong>tainers disposed off in accordance with the DOE requirements. Informati<strong>on</strong><br />
regarding the chemicals and their usage, hazard and general names were displayed<br />
in the Nati<strong>on</strong>al Language (i.e. Bahasa Malaysia) and translated for the<br />
understanding of the foreign workers.<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 13 of 46<br />
The annual medical checkup carried out for pesticides operators were not<br />
adequate at the estates.(see NCR # 1)<br />
No pregnant or breastfeeding women were assigned to work with pesticides.<br />
Paraquat usage is minimum and restricted to use as a catalyst with other approved<br />
herbicides as part of weed management e.g. every two spray round of paraquat is<br />
followed by <strong>on</strong>e of Glyphosate. The paraquat was used to clear weeds around young<br />
palms as it <strong>on</strong>ly desiccates weed shoots and has no residual effect in the soil. This<br />
program was used to keep a c<strong>on</strong>trolled presence of soft weeds and the removal of<br />
noxious weeds. IOI‟s management had issued a directive in September 2010 for all<br />
its estates to phase out the use of paraquat by 31 st December 2011.<br />
However, as there was no ‘Fuller’s earth’ available in all the clinics at the<br />
estates and no alternative was prepared in case of an emergency, an<br />
observati<strong>on</strong> was issued. We were given to understand that that all the medical<br />
assistants‟ in-charge of the clinics was knowledgeable <strong>on</strong> how to prepare instant<br />
antidotes from the clays available from the surroundings of the estates.<br />
No aerial applicati<strong>on</strong> of agrochemicals had been carried out. There was no testing of<br />
chemical residues in CPO as there were no requests made from the buyers. Daily<br />
records of pesticides usage were maintained.<br />
Criteri<strong>on</strong> 4.7<br />
An occupati<strong>on</strong>al health and safety plan is documented effectively communicated and<br />
implemented.<br />
See OBS #<br />
2<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
The Occupati<strong>on</strong>al Safety and Health (OSH) Policy were displayed at the POM and<br />
all the estates. The Occupati<strong>on</strong>al Safety and Health (OSH) Plan established have<br />
included the establishment of escape routes and locati<strong>on</strong>s of the firefighting<br />
equipment at the sites covered. Each estate and mill had identified and assessed<br />
their respective hazards and risks as per established procedures. Acti<strong>on</strong>s and<br />
precauti<strong>on</strong>s established to address the identified risks.<br />
All operati<strong>on</strong>s where health and safety is an issue have been assessed and<br />
procedures and acti<strong>on</strong>s are documented and implemented to address the identified<br />
issues. Each procedure was supported with documented tasks and task elements<br />
and all possible risks assessed. All precauti<strong>on</strong>s attached to products are observed<br />
and applied to the workers.<br />
The training records had indicated that workers involved in the operati<strong>on</strong>s have been<br />
trained in the OSH policy, programs and in safe working practices. Pesticide<br />
sprayers and fruit cutters selected at random at the estates were interviewed and<br />
they were able to dem<strong>on</strong>strate the correct safety precauti<strong>on</strong>s required. Adequate<br />
and appropriate PPE were available to labourers at the place of work to cover all<br />
potentially hazardous operati<strong>on</strong>s, such as pesticide applicati<strong>on</strong>, chemical storage /<br />
handling, land preparati<strong>on</strong> and harvesting.<br />
The resp<strong>on</strong>sible pers<strong>on</strong>s (i.e. mandores / field supervisors), c<strong>on</strong>ductors and store<br />
supervisor) were identified.<br />
There were records of regular meetings between the resp<strong>on</strong>sible pers<strong>on</strong> and<br />
workers where c<strong>on</strong>cerns of all parties about health, safety and welfare were briefed<br />
and discussed.<br />
Records detailing the occurrence and issues raised were properly maintained.<br />
Meeting minutes were available.<br />
Accident and Emergency procedures and First Aid procedures are present and<br />
instructi<strong>on</strong>s are clearly understood by all workers. Accident procedures are also<br />
available in Bahasa Malaysia, which is understood by the workers. Assigned<br />
Complied<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 14 of 46<br />
operatives trained in First Aid are present in both field and other operati<strong>on</strong>s and first<br />
aid equipment are available at worksites. Sighted a list of sites where all First Aids<br />
boxes are placed.<br />
Records of accidents are kept and reviewed m<strong>on</strong>thly. Fire Drills had been c<strong>on</strong>ducted<br />
at each site (Mill and Estates) with records observed in resp<strong>on</strong>se to potential<br />
emergency.<br />
All workers (including the Ind<strong>on</strong>esian foreign workers) were covered by the worker‟s<br />
compensati<strong>on</strong> scheme. Calculati<strong>on</strong> <strong>on</strong> Lost Time Accident was maintained.<br />
Workplaces, machinery, equipment, transportati<strong>on</strong> vehicles were maintained to<br />
ensure safety and without undue risk to health. Chemical, physical and biological<br />
substances and agents were stored under c<strong>on</strong>trolled c<strong>on</strong>diti<strong>on</strong>s. A safe and healthy<br />
working envir<strong>on</strong>ment was provided for the workers regardless of whether they are<br />
estate full time employees or c<strong>on</strong>tract workers.<br />
Good Agriculture Practice (GAP) and Chemical Health Risk Assessment (CHRA)<br />
were am<strong>on</strong>g the references used in maintaining the safe working envir<strong>on</strong>ment for<br />
the employees.<br />
Field inspecti<strong>on</strong> at Pukin estate (i.e. PM 06A) observed circle spraying with<br />
Supreshade 41 (Glyphosate) + 2.4-D Amine (herbicide) and workers wearing<br />
appropriate PPE. Signboards indicated spraying of herbicides in progress and the<br />
harvesting supervisor (mandore) also carried the First Aid Box during supervisi<strong>on</strong> at<br />
the field.<br />
Criteri<strong>on</strong> 4.8<br />
All staff, workers, smallholders and c<strong>on</strong>tractors are appropriately trained.<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
The training schedule for the year 2009/2010 for POM and respective estates was<br />
available. Relevant topics are identified and training classes were c<strong>on</strong>ducted for the<br />
staff and workers and evidenced in the training records. There are no smallholders<br />
or c<strong>on</strong>tractors at the PMU.<br />
Safety matters are briefed at the morning muster and „<strong>on</strong>-the job‟ training is given.<br />
Records of training for the employees including the Estate Hospital Assistant (EHA)<br />
were maintained. Workers are given specific and relevant training before fieldwork.<br />
C<strong>on</strong>tinuous assessment and reactive training are also given in accordance with<br />
documented procedures and in compliance with the requirement of RSPO principles<br />
and criteria.<br />
Complied<br />
Principle 5: Envir<strong>on</strong>mental resp<strong>on</strong>sibility and c<strong>on</strong>servati<strong>on</strong> of natural resources and biodiversity<br />
Criteri<strong>on</strong> 5.1 Aspects of plantati<strong>on</strong> and mill management, including replanting, that have<br />
envir<strong>on</strong>mental impacts are identified, and plans to mitigate the negative impacts and promote the<br />
positive <strong>on</strong>es are made, implemented and m<strong>on</strong>itored, to dem<strong>on</strong>strate c<strong>on</strong>tinuous improvement.<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
Documented Envir<strong>on</strong>mental Impact Assessment, Management Acti<strong>on</strong>s Plans and<br />
C<strong>on</strong>tinuous Improvement Plans dated October 2010 were prepared for the<br />
respective estates under PUKIN GROUPING-PMU by the IOI Sustainability Team<br />
which is from IOI Research Centre at Batang Melaka, Negeri Sembilan, Malaysia.<br />
The findings of the assessment had included the identificati<strong>on</strong> of impacts that<br />
requires changes in current practices. The report also includes acti<strong>on</strong> plans and<br />
recommendati<strong>on</strong>s in order to mitigate negative effects and promote positive <strong>on</strong>es. A<br />
generic timetable / m<strong>on</strong>itoring frequency were developed and noted.<br />
Complied<br />
Envir<strong>on</strong>mental impact assessment covered activities such as POM, oil palm fields,<br />
open areas, patches of hill forest and forest edges / boundary to forest land areas<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 15 of 46<br />
were targeted by the assessment team in this study. Management acti<strong>on</strong> plans<br />
addressing issues raised which was m<strong>on</strong>itored and projected to be reviewed<br />
annually. During the assessment, it was noted that internal EIA report had included<br />
the stakeholder c<strong>on</strong>sultati<strong>on</strong> with external stakeholders i.e. the Land Department /<br />
Office, DOE etc. Interviews signed by respective officers were also available as part<br />
of document evidence of internal EIA.<br />
Criteri<strong>on</strong> 5.2<br />
The status of rare, threatened or endangered species and high c<strong>on</strong>servati<strong>on</strong> value habitats, if any,<br />
that exist in the plantati<strong>on</strong> or that could be affected by plantati<strong>on</strong> or mill management, shall be<br />
identified and their c<strong>on</strong>servati<strong>on</strong> taken into account in management plans and operati<strong>on</strong>s.<br />
Initial-R2020/10-1 The HCV assessment report(s) have indicated that there were no ERT / protected<br />
species at the external HCVs (forest land) at the areas covered by PUKIN<br />
GROUPING-PMU estates. The collated informati<strong>on</strong> has included the planted area<br />
itself and relevant forest land boundary c<strong>on</strong>siderati<strong>on</strong>s such as the boundary of the<br />
Forest Land adjacent to the Pukin estate, Shahzan 1 & 2 estates.<br />
However a minor CAR issued at the Shahzan 1&2 Estates for not identifying<br />
and c<strong>on</strong>sidering the three p<strong>on</strong>ds and a Chinese (Taoist) shrine for their<br />
potential HCV status in their assessment report prepared <strong>on</strong> 1 st October 2010.<br />
The HCV assessment reports can be enhanced by having more photographs<br />
of species identified during the assessments performed. The HCV report dated<br />
1 st October 2010 should also identify as many comm<strong>on</strong> species i.e. mammals,<br />
birds and fishes found in the estate(s) envir<strong>on</strong>ment e.g. egrets, her<strong>on</strong>s and<br />
l<strong>on</strong>g tail macaque. Cooperati<strong>on</strong> with the forestry/Land department to gather<br />
informati<strong>on</strong> <strong>on</strong> the animal species near the forest land boundaries. Knowledge<br />
of species i.e. ERT at the boundaries with Forest Land could significantly<br />
affect c<strong>on</strong>servati<strong>on</strong> status (e.g. IUCN status) then that was noted in the report.<br />
HCV biodiversity areas / forests type 6 e.g. church, temples, shrines, surau /<br />
mosques, cemetery etc has been appropriately identified for PUKIN<br />
GROUPING-PMU estates and mill based <strong>on</strong> the assessment report dated 1 st<br />
October 2010. However, the HCV(s) actual boundaries, dimensi<strong>on</strong>s / hectarage<br />
and the latitude & l<strong>on</strong>gitude (where not determined yet) could be further<br />
defined for future reference.<br />
Compliance<br />
Outcome<br />
See NCR #<br />
5<br />
See OBS #<br />
6<br />
See OBS #<br />
7<br />
and also<br />
NCR # 5<br />
Generally the HCV assessment team has indicated more clearly the informati<strong>on</strong><br />
gathering process <strong>on</strong> HCV habitats (including ERT(s) or otherwise ) and the<br />
stakeholder(s) c<strong>on</strong>sultati<strong>on</strong>s d<strong>on</strong>e with relevant government departments, research<br />
institutes, interested NGOs and any additi<strong>on</strong>al field survey work to be d<strong>on</strong>e in the<br />
future will be based <strong>on</strong> the current findings dated 1 st October 2010.<br />
There were isolated reported case(s) of incursi<strong>on</strong> by wild boars. However no major<br />
damage to property and plantati<strong>on</strong> was reported. No other incursi<strong>on</strong>s i.e. elephants<br />
reported ever since the implementati<strong>on</strong> of RSPO for the PUKIN GROUPING-PMU<br />
estates.<br />
Legal requirements relating to the protecti<strong>on</strong> of the species or habitat were met such<br />
as reporting the matter to the authorities such as reports made to the local Land<br />
Department.<br />
The relevant estate(s) management has undertaken appropriate measures to c<strong>on</strong>trol<br />
any illegal or inappropriate hunting, fishing or collecting activities within PUKIN<br />
GROUPING-PMU. IOI has “no hunting” policy and appropriate signage were<br />
prominently displayed to c<strong>on</strong>vey this policy especially at the forest land boundary<br />
areas.<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 16 of 46<br />
Criteri<strong>on</strong> 5.3<br />
Waste is reduced, recycled, re-used and disposed of in an envir<strong>on</strong>mentally and socially<br />
resp<strong>on</strong>sible manner.<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
The documented identificati<strong>on</strong> of all the waste products such as scheduled waste<br />
and sources of polluti<strong>on</strong> such as from POME were appropriately implemented at<br />
PUKIN GROUPING-PMU. The PMU has segregated its wastes as general wastes<br />
and scheduled wastes. Proper areas were identified for the storage of the respective<br />
wastes.<br />
Scheduled Waste such as „spent hydraulic oil‟ (SW 305) were properly stored and<br />
labeled with sec<strong>on</strong>dary c<strong>on</strong>tainment noted at the major scheduled waste storage<br />
areas. The schedule waste storage area had restricted access to authorized<br />
pers<strong>on</strong>nel <strong>on</strong>ly. Seventh Schedule informati<strong>on</strong> generally available and adhered to at<br />
PUKIN GROUPING-PMU.<br />
Recycling bins of three different color codes were available in the POM, workers<br />
quarters/ line site(s) and estates and were used for solid waste segregati<strong>on</strong> and<br />
recycling.<br />
The solid waste management at the dumpsite / „landfill‟ has signage i.e. <strong>on</strong> Health,<br />
Safety and Envir<strong>on</strong>ment rules that are required at the current designated<br />
landfill/dumpsite(s).<br />
Complied<br />
Criteri<strong>on</strong> 5.4<br />
Efficiency of energy use and use of renewable energy is maximised.<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
The use of energy in palm oil mill and line site was m<strong>on</strong>itored m<strong>on</strong>thly to compare<br />
the energy usage against the producti<strong>on</strong> of CPO. Electricity generati<strong>on</strong> was through<br />
steam turbine and boiler where palm fiber and shell were used as fuel. Diesel<br />
generators were <strong>on</strong> standby basis to support the operati<strong>on</strong> in the event of boiler /<br />
steam turbine system breakdown. M<strong>on</strong>thly records of KW usage of n<strong>on</strong>-renewable<br />
and renewable fuel per metric t<strong>on</strong>ne of palm product were available.<br />
Complied<br />
Criteri<strong>on</strong> 5.5<br />
Use of fire for waste disposal and for preparing land for replanting is avoided except in specific<br />
situati<strong>on</strong>s, as identified in the ASEAN guidelines or other regi<strong>on</strong>al best practice.<br />
Initial-R2020/10-1 PUKIN GROUPING-PMU had observed the IOI group policy of „Zero open burning‟<br />
in the estates. Inspecti<strong>on</strong>s at site c<strong>on</strong>firmed no evidence of open burning. No burning<br />
of waste including domestic waste was noted.<br />
Criteri<strong>on</strong> 5.6<br />
Plans to reduce polluti<strong>on</strong> and emissi<strong>on</strong>s, including greenhouse gases, are developed,<br />
implemented and m<strong>on</strong>itored.<br />
Compliance<br />
Outcome<br />
Complied<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
Envir<strong>on</strong>mental impact assessment performed to identify potential polluti<strong>on</strong> to water,<br />
gaseous emissi<strong>on</strong>s to air and c<strong>on</strong>taminati<strong>on</strong> <strong>on</strong> land.<br />
Management Acti<strong>on</strong> Plans and C<strong>on</strong>tinuous Improvement Plans were developed to<br />
mitigate significant impacts identified. These exercises were reviewed periodically<br />
(annually) such as next review scheduled in April 2011.<br />
Complied<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 17 of 46<br />
Principle 6: Resp<strong>on</strong>sible c<strong>on</strong>siderati<strong>on</strong> of employees and of individuals and communities affected by growers<br />
and mills<br />
Criteri<strong>on</strong> 6.1<br />
Aspects of plantati<strong>on</strong> and mill management, including replanting, that have social impacts are<br />
identified in a participatory way, and plans to mitigate the negative impacts and promote the<br />
positive <strong>on</strong>es are made, implemented and m<strong>on</strong>itored, to dem<strong>on</strong>strate c<strong>on</strong>tinuous improvement.<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
Under the PUKIN GROUPING-PMU, the respective Social Impact Assessment<br />
reports and Management plans at all the estates and mill was specific and<br />
individually documented by the Sustainability Team of IOI e.g. Social Impact<br />
Assessment and Management Acti<strong>on</strong> Plans, Pukin Estate dated 30 July 2010 for<br />
July 2010 – June 2015, was evidenced.<br />
Complied<br />
Stakeholder c<strong>on</strong>sultati<strong>on</strong> meetings with the local communities and employees <strong>on</strong> the<br />
assessment were performed by the Estate managers with their Social Liais<strong>on</strong><br />
Officers. Employee representati<strong>on</strong> was through the Employees C<strong>on</strong>sultative Council<br />
(ECC) which has representati<strong>on</strong> from the different levels of workers who are elected<br />
by the workers. In all estates in IOI Pukin POM grouping an Employees C<strong>on</strong>sultative<br />
Committee (ECC) was formed. Members in the ECC include representatives from<br />
manures‟ group, sprayers‟ group, harvesters‟ group, FFB checkers‟ group, general<br />
workers‟ group, loaders‟ group. In Segamat Estate, the Nati<strong>on</strong>al Uni<strong>on</strong> of Plantati<strong>on</strong><br />
Workers (NUPW) representative was also involved.<br />
In all estates a dedicated Gender Committee was formed to deal with gender related<br />
issues. Members in the committees c<strong>on</strong>sist of all women staff and workers in the<br />
estates. Participati<strong>on</strong> from their official representatives expressed their views freely<br />
with records of meeting attendance and minutes of meeting being available.<br />
Stakeholder c<strong>on</strong>sultati<strong>on</strong>s were c<strong>on</strong>ducted in all estates and the results of the<br />
c<strong>on</strong>sultati<strong>on</strong> are incorporated into the SIA. Acti<strong>on</strong>s had been taken to address the<br />
issues raised during the c<strong>on</strong>sultati<strong>on</strong>s e.g. plans have been developed to install a<br />
water tank <strong>on</strong> higher ground to tackle the low water pressure at Pukin Estate. In the<br />
interim water is supplied to workers‟ quarters using the portable water tanks.<br />
External stakeholder c<strong>on</strong>sultati<strong>on</strong>s were c<strong>on</strong>ducted in all estates in the IOI - Pukin<br />
PMU grouping, i.e. held between July and October 2010.<br />
The c<strong>on</strong>sultati<strong>on</strong>s were attended by a wide range of stakeholders including<br />
government agencies such as the Forestry Dept., local businesses and neighboring<br />
estates. At the Segamat Estate, representatives from the villages surrounding the<br />
estate were also noted to be in attendance. Records of meeting with stakeholders<br />
indicated discussi<strong>on</strong>s held were generally <strong>on</strong> matters pertaining to access roads and<br />
use rights, working c<strong>on</strong>diti<strong>on</strong>s, cultural/festival activities, health facilities and other<br />
community c<strong>on</strong>cerns. Generally the issues raised during the c<strong>on</strong>sultati<strong>on</strong>s were<br />
acted up<strong>on</strong> such as the maintenance of the football field located within the boundary<br />
of Segamat Estate, for the recreati<strong>on</strong>al use of the neighboring villagers‟. A time table<br />
of activities identified was sighted with time frame <strong>on</strong> implementati<strong>on</strong> plans. Site<br />
inspecti<strong>on</strong> carried out c<strong>on</strong>firmed that the implementati<strong>on</strong>s were in progress.<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 18 of 46<br />
Criteri<strong>on</strong> 6.2<br />
There are open and transparent methods for communicati<strong>on</strong> and c<strong>on</strong>sultati<strong>on</strong> between growers<br />
and/or millers, local communities and other affected or interested parties.<br />
Initial-R2020/10-1<br />
IOI Pukin POM grouping has adopted open and transparent methods of<br />
communicati<strong>on</strong> and c<strong>on</strong>sultati<strong>on</strong> when dealing with relevant parties, e.g. its workers,<br />
government agencies, c<strong>on</strong>tractors, neighboring plantati<strong>on</strong>s by pers<strong>on</strong>al invitati<strong>on</strong> to<br />
attend the internal and external stakeholder‟s c<strong>on</strong>sultati<strong>on</strong> meetings such as the<br />
issue of disc<strong>on</strong>tentment am<strong>on</strong>g workers in August 2010 <strong>on</strong> payment rates for FFB in<br />
the Shahzan 1 estate was discussed between the estate management and workers<br />
representatives which were resolved with a revisi<strong>on</strong> made to payment rates. List of<br />
stakeholders are updated and records of meeting were maintained.<br />
Criteri<strong>on</strong> 6.3<br />
There is a mutually agreed and documented system for dealing with complaints and grievances,<br />
which is implemented and accepted by all parties.<br />
Initial-R2020/10-1<br />
All estates in IOI Pukin POM grouping have established complaints and grievances<br />
procedures which were adequately implemented. Complaints and Grievances<br />
logbook were sighted in all estates in the grouping. Alternatively complaints and<br />
grievances were also filed through their respective ECC representatives. The<br />
resp<strong>on</strong>se time the complaints and grievances which were filed were found to be<br />
prompt i.e. within 5 days depending <strong>on</strong> the nature of the complaints.<br />
Criteri<strong>on</strong> 6.4<br />
Any negotiati<strong>on</strong>s c<strong>on</strong>cerning compensati<strong>on</strong> for loss of legal or customary rights are dealt with<br />
through a documented system that enables indigenous peoples, local communities and other<br />
stakeholders to express their views through their own representative instituti<strong>on</strong>s.<br />
Compliance<br />
Outcome<br />
Complied<br />
Compliance<br />
Outcome<br />
Complied<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
There were no borders at estates in Pukin grouping which were adjacent to any<br />
villages or native land.<br />
Complied<br />
Therefore there have been no records of any negotiati<strong>on</strong> or compensati<strong>on</strong> pertaining<br />
to this criteri<strong>on</strong>.<br />
Criteri<strong>on</strong> 6.5<br />
Pay and c<strong>on</strong>diti<strong>on</strong>s for employees and for employees of c<strong>on</strong>tractors always meet at least legal or<br />
industry minimum standards and are sufficient to provide decent living wages.<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
Basic daily rate for all employees in IOI Pukin POM grouping estates has met the<br />
industry minimum standards with an extra pay for statutory fringe benefits for their<br />
employees and the employees of sub-c<strong>on</strong>tractors. The estate managements also<br />
provide free housing and treated water supply, fix electricity rate per m<strong>on</strong>th, medical<br />
facilities, community halls, mosques and welfare amenities which help in providing<br />
sufficient and decent living for the staff and workers.<br />
However the workers’ c<strong>on</strong>tract / job offer letter i.e. ‘Surat Tawaran Bekerja<br />
Sebagai Pekerja Ladang’, used in all the estates in the grouping did not reflect<br />
the current practice adopted by the grouping. Some paragraphs required<br />
revisi<strong>on</strong>s in the c<strong>on</strong>tract such as the ‘removal of levy deducti<strong>on</strong> from foreign<br />
workers’ pay, ‘basic daily wage rate’ and the ‘authorized pers<strong>on</strong>nel’ signing<br />
the c<strong>on</strong>tract. There was a revised standard workers’ c<strong>on</strong>tract in 2008 at the<br />
Pukin POM which had not been c<strong>on</strong>sistently used.<br />
See NCR #<br />
2<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 19 of 46<br />
Criteri<strong>on</strong> 6.6<br />
The employer respects the right of all pers<strong>on</strong>nel to form and join trade uni<strong>on</strong>s of their choice and<br />
to bargain collectively. Where the right to freedom of associati<strong>on</strong> and collective bargaining are<br />
restricted under law, the employer facilitates parallel means of independent and free associati<strong>on</strong><br />
and bargaining for all such pers<strong>on</strong>nel.<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
The published statements of policy which recognizes the employee‟s freedom of<br />
associati<strong>on</strong>, was noted to be available in a few native languages including Bahasa<br />
Malaysia, English and some local native languages.<br />
Due to the restricti<strong>on</strong>s stated in Immigrati<strong>on</strong> Act 1959/63, in which foreign employees<br />
are not allowed to form or be affiliated to any society or associati<strong>on</strong>, the estate<br />
management had formed the ECC as an alternative mechanism to cater to the<br />
collective bargaining needs of the workers.<br />
Results of ECC meetings were minute and available.<br />
Complied<br />
Criteri<strong>on</strong> 6.7<br />
Children are not employed or exploited.<br />
Work by children is acceptable <strong>on</strong> family farms, under adult supervisi<strong>on</strong>, and when not<br />
interfering with educati<strong>on</strong> programmes.<br />
Children are not exposed to hazardous working c<strong>on</strong>diti<strong>on</strong>s.<br />
Initial-R2020/10-1 There was no evidence of any child labor being used at the estates of IOI Pukin<br />
POM grouping.<br />
Child Labour policy adopted by estate managements <strong>on</strong> 20 th August 2008 stated that<br />
the minimum age of workers is 19 years and site inspecti<strong>on</strong> of the employment<br />
records in all estates c<strong>on</strong>firmed that this has been complied.<br />
Criteri<strong>on</strong> 6.8<br />
Any form of discriminati<strong>on</strong> based <strong>on</strong> race, caste, nati<strong>on</strong>al origin, religi<strong>on</strong>, disability, gender, sexual<br />
orientati<strong>on</strong>, uni<strong>on</strong> membership, political affiliati<strong>on</strong>, or age, is prohibited.<br />
Compliance<br />
Outcome<br />
Complied<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
An Equal Job Opportunity Policy was adopted by the estate management was<br />
displayed in the places where workers usually gather such as the estate<br />
administrati<strong>on</strong> offices, community halls, crèche, health clinics and housing blocks.<br />
Payment slips were also inspected in all estates in order to ensure no discriminati<strong>on</strong><br />
in daily rate between workers, unfair deducti<strong>on</strong> of wages and proper wage payment<br />
for work d<strong>on</strong>e during the rest days as reflected in the payment slips issued.<br />
There was no negative feedback <strong>on</strong> any form of discriminati<strong>on</strong> from the private<br />
interviews c<strong>on</strong>ducted with the interviewees or from the payment slips inspected.<br />
Complied<br />
Criteri<strong>on</strong> 6.9<br />
A policy to prevent sexual harassment and all other forms of violence against women and to<br />
protect their reproductive rights is developed and applied.<br />
Initial-R2020/10-1<br />
Estate managements of IOI Pukin POM grouping have adopted a Sexual<br />
Harassment Policy and sexual harassment reporting procedures for protecti<strong>on</strong> of<br />
their workers. In all estates gender representatives were appointed to record reports<br />
from complainants appropriate to their gender. Training <strong>on</strong> sexual harassment has<br />
been held for the female staff and workers. The women workers interviewed were<br />
able to give explanati<strong>on</strong>s and examples <strong>on</strong> sexual harassment.<br />
However, there was no record of training provided for the male workers <strong>on</strong><br />
sexual harassment at all the estates.<br />
It was also noted that sexual harassment reports may not have been treated<br />
with proper c<strong>on</strong>fidentiality e.g. at Shahzan 2 estate, a sexual harassment<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012<br />
Compliance<br />
Outcome<br />
See OBS #<br />
4
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 20 of 46<br />
report recorded in the Complaints and Grievances logbook dated 28 April 2009<br />
was accessible for viewing by all staff.<br />
A procedure is in place to c<strong>on</strong>duct medical check-up by the Health Assistant <strong>on</strong><br />
women workers, depending <strong>on</strong> the type of job they are assigned to, e.g. for sprayers<br />
<strong>on</strong>ce a m<strong>on</strong>th, and manures / store keepers <strong>on</strong>ce in three m<strong>on</strong>ths. Once a year the<br />
women workers were to be sent for thorough health surveillance as part of the<br />
CHRA requirements.<br />
Pregnant and breastfeeding women were exempted from work associated with<br />
potentially hazardous chemicals and were given light duties such as work in and<br />
around the office.<br />
Criteri<strong>on</strong> 6.10<br />
Growers and mills deal fairly and transparently with smallholders and other local businesses.<br />
Initial-R2020/10-1<br />
The FFB supplied at Pukin Grouping-PMU were mainly from IOI directly managed<br />
land or owned estates. Supplies from smallholders / outgrower such as Manna<br />
Estate and Ladang Haji Jarun had agreements/c<strong>on</strong>tracts. The FOB pricing<br />
mechanisms were documented and displayed including past prices. Other services<br />
with local business were mainly for the supply of chemicals, fertilizers, equipment<br />
spare-parts, equipment maintenance services and manpower. Interviews d<strong>on</strong>e with<br />
the smallholders and suppliers/c<strong>on</strong>tractors provided generally positive feedback and<br />
general satisfacti<strong>on</strong> with regards to fair prices and payments being prompt.<br />
Criteri<strong>on</strong> 6.11<br />
Growers and millers c<strong>on</strong>tribute to local sustainable development wherever appropriate.<br />
See OBS #<br />
3<br />
(Refer also<br />
to NCR # 1)<br />
Compliance<br />
Outcome<br />
Complied<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
The Pukin POM and the estates within the grouping were found to have c<strong>on</strong>tributed<br />
to the development of local communities in several ways such as organizing local<br />
sporting tournaments, d<strong>on</strong>ati<strong>on</strong>s made to local communities to c<strong>on</strong>duct religious<br />
festivities, hiring local workers where available, permissi<strong>on</strong> for local communities to<br />
use estate facilities for religious and sports activities, free transportati<strong>on</strong> for the local<br />
children to go to school, free crèche for children of local staff/workers, and providing<br />
free services to local people who require immediate medical attenti<strong>on</strong> at their clinics.<br />
Complied<br />
Principle 7: Resp<strong>on</strong>sible development of new plantings<br />
PUKIN GROUPING-PMU has a procedure for this development but has not carried out any new plantings since<br />
November 2005. Therefore no details of implementati<strong>on</strong> were available for Principle 7.<br />
Principle 8: Commitment to c<strong>on</strong>tinuous improvement in key areas of activity<br />
Criteri<strong>on</strong> 8.1<br />
Growers and millers regularly m<strong>on</strong>itor and review their activities and develop and implement<br />
acti<strong>on</strong> plans that allow dem<strong>on</strong>strable c<strong>on</strong>tinuous improvement in key operati<strong>on</strong>s.<br />
Compliance<br />
Outcome<br />
Initial-R2020/10-1<br />
C<strong>on</strong>tinuous improvements in key operati<strong>on</strong>s have been developed at the Pukin<br />
Grouping-PMU which were regularly m<strong>on</strong>itored and reviewed as follows:<br />
1) Under the Integrated Pest Management (IPM) program, for pest c<strong>on</strong>trol and<br />
reducti<strong>on</strong> in the c<strong>on</strong>sumpti<strong>on</strong> of chemical pesticides. There were increasing<br />
efforts made through the use of direct bio-c<strong>on</strong>trol methods such as the<br />
cultivati<strong>on</strong> of beneficial plants.<br />
2) Through the introducti<strong>on</strong> of waste polluti<strong>on</strong> and reducti<strong>on</strong> programs‟ including<br />
the recycling of all agricultural wastes from the mill, workshops and fields.<br />
Nutrient recycling programs were improved through the use of the treated POME<br />
and EFB at the field which has resulted in the reducti<strong>on</strong> of envir<strong>on</strong>mental<br />
Complied<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 21 of 46<br />
impacts and polluti<strong>on</strong>.<br />
3) The promoti<strong>on</strong> of recycling programs by providing appropriate awareness and<br />
training and availability of recycling bins with the l<strong>on</strong>g term plan to reduce solid<br />
wastes.<br />
4) Each estate has improvement programs to further restore the riparian buffer<br />
z<strong>on</strong>es and n<strong>on</strong>-spraying of agro-chemicals in the buffer z<strong>on</strong>es.<br />
5) Review of social impact assessment programs and social engagements with the<br />
workers and local communities and visits to the villages (at Segamat).<br />
6) Annual review of performance indicators linked to the progressive<br />
implementati<strong>on</strong> of both social and envir<strong>on</strong>mental programs and expenditure via<br />
the financial accounting system.<br />
3.2 Details of Identified N<strong>on</strong>compliance and Corrective Acti<strong>on</strong>s, Observati<strong>on</strong>s and Positive Elements.<br />
The status of N<strong>on</strong>compliance (NCR) and Observati<strong>on</strong>s (OBS) identified against the MYNI Compliance Indicators is as per<br />
details below:<br />
Year 2010: Compliance assessment, A total of 5 N<strong>on</strong>compliances (1 Major and 4 Minor) were identified as below:<br />
NCR #<br />
01 / 5<br />
Major<br />
NCR #<br />
02 / 5<br />
Minor<br />
MYNI<br />
Indicator<br />
2.1.1 &<br />
4.6.5<br />
MYNI<br />
Indicator<br />
2.1.1 &<br />
6.5.2<br />
Details of NCR (in year 2010)<br />
Date issued:<br />
12 December 2010<br />
N<strong>on</strong>c<strong>on</strong>formance:<br />
Date due:<br />
11 February 2011<br />
Date closed:<br />
26 January 2011<br />
In year 2009 till current in December 2010, the estates within the grouping did not send all<br />
workers who were exposed to chemicals for the annual medical surveillance by the<br />
Occupati<strong>on</strong>al & Health Dept. e.g. at the Segamat estate, in 2009 - <strong>on</strong>ly 2 employees and in<br />
2010 – <strong>on</strong>ly 6 employees out of a total of 43 workers were medically examined.<br />
Corrective Acti<strong>on</strong> (replied):<br />
All workers needing the annual medical surveillance as per CHRA findings have been<br />
examined as per List attached.<br />
Verificati<strong>on</strong>:<br />
Documented evidence submitted was acceptable after review and was verified. Effectiveness<br />
of implementati<strong>on</strong> will be followed up during the next scheduled audit.<br />
Details of NCR (in year 2010)<br />
Date issued:<br />
12 December 2010<br />
N<strong>on</strong>c<strong>on</strong>formance:<br />
Date due:<br />
11 January 2011<br />
Date closed:<br />
5 January 2011<br />
The „Surat Tawaran Bekerja Sebagai Pekerja Ladang‟ did not reflect the current and actual<br />
practices of the estates within the grouping e.g. the wage rate, levy and current signatory.<br />
Corrective Acti<strong>on</strong> (replied):<br />
Memo was issued by Human Resource Manager (Plantati<strong>on</strong> Divisi<strong>on</strong>) to all operati<strong>on</strong> centres.<br />
Samples of updated c<strong>on</strong>tract and copies were attached.<br />
Verificati<strong>on</strong>:<br />
Documented evidence submitted was acceptable after review and verificati<strong>on</strong>.<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 22 of 46<br />
NCR #<br />
03 / 5<br />
Minor<br />
NCR #<br />
04 / 5<br />
Minor<br />
NCR #<br />
MYNI<br />
Indicator<br />
Details of NCR (in year 2010)<br />
4.4.7 Date issued:<br />
MYNI<br />
Indicator<br />
11 December 2010<br />
N<strong>on</strong>c<strong>on</strong>formance:<br />
Date due:<br />
11 January 2011<br />
Date closed:<br />
5 January 2011<br />
The Pukin <strong>Oil</strong> Mill‟s pump house (raw water intake point) used for human c<strong>on</strong>sumpti<strong>on</strong> /<br />
domestic purposes was not secured and was lacking in warning and safety precauti<strong>on</strong><br />
signages.<br />
Corrective Acti<strong>on</strong> (replied):<br />
Raw water Pump House was secured and SOPs including appropriate signage(s) (photograph<br />
attached).<br />
Verificati<strong>on</strong>:<br />
Documented evidence submitted was acceptable after review and verificati<strong>on</strong>.<br />
Details of NCR (in year 2010)<br />
4.4.7 Date issued:<br />
MYNI<br />
Indicator<br />
12 December 2010<br />
N<strong>on</strong>c<strong>on</strong>formance:<br />
Date due:<br />
11 January 2011<br />
Date closed:<br />
5 January 2011<br />
1) The tube well located at 031I at Shahzan 1 estate was noted to be exposed to pesticide<br />
spraying, hence the raw water samples should be tested for Group 4 (pesticides) under<br />
Ministry of Health‟s (MOH) Drinking water standard 2009.<br />
2) The tube well area is not secured. Warning and safety precauti<strong>on</strong> signages should be<br />
prominently displayed.<br />
Corrective Acti<strong>on</strong> (replied):<br />
The tube well was secured, appropriate warning signage(s) and acti<strong>on</strong>s taken (photograph<br />
was attached) testing of pesticide residual from the tube well‟s raw water sample c<strong>on</strong>ducted<br />
and certificate of analysis provided.<br />
Verificati<strong>on</strong>:<br />
Documented evidence submitted was acceptable after review and verificati<strong>on</strong>.<br />
Details of NCR (in year 2010)<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 23 of 46<br />
05 / 5<br />
Minor<br />
5.2.1 Date issued:<br />
12 December 2010<br />
N<strong>on</strong>c<strong>on</strong>formance:<br />
Date due:<br />
11 January 2011<br />
Date closed:<br />
5 January 2011<br />
1) The HCV assessment dated 1 st October 2010 for the Pukin PMU estates and <strong>Oil</strong> Mill has<br />
not included the „Chinese Shrine‟ located near the Assistant Estate Manager‟s bungalow<br />
at block 031I, Shahzan 1 & 2 estates.<br />
2) The aforesaid HCV assessment report has not c<strong>on</strong>sidered the three p<strong>on</strong>ds at the Shahzan<br />
1 & 2 estates for HCV status.<br />
Corrective Acti<strong>on</strong> (replied):<br />
The HCV assessment dated 1 st October 2010 for the Pukin PMU estates and <strong>Oil</strong> Mill revised in<br />
December 2010 have included the Chinese Shrine (Taoist Shrine) which has been assessed.<br />
Additi<strong>on</strong>ally, reported in the HCV status findings were the three p<strong>on</strong>ds identified.<br />
Verificati<strong>on</strong>:<br />
Documented evidence submitted was acceptable after review and verificati<strong>on</strong>.<br />
Observati<strong>on</strong>s / Opportunities for Improvement:<br />
A total of 7 Observati<strong>on</strong>s (OBS) were identified. The progress to be made <strong>on</strong> the observati<strong>on</strong>s as listed below will be<br />
checked during the surveillance assessment.<br />
OBS<br />
MYNI<br />
Indicator<br />
01 4.5.2 Date issued:<br />
Details of NCR (in year 2010)<br />
11 December 2010<br />
Observati<strong>on</strong>:<br />
Date due: 1 st Surveillance Date closed: -<br />
The number of barn owl boxes in the estates is found to be below the target set by the<br />
company (i.e. 1 box to 15 hectare). The level required be reviewed and be set in accordance<br />
with the m<strong>on</strong>itoring d<strong>on</strong>e <strong>on</strong> the rat bait dosages at the estates and severity of the situati<strong>on</strong>.<br />
Follow up Verificati<strong>on</strong>:<br />
02 4.6.7 Date issued:<br />
(During next surveillance)<br />
11 December 2010<br />
Observati<strong>on</strong>:<br />
Date due: 1 st Surveillance<br />
Date closed:-<br />
There was no „Fuller‟s earth‟ available in all the clinics at the estates and no alternative was<br />
prepared in case of an emergency.<br />
Follow up Verificati<strong>on</strong>:<br />
(During next surveillance)<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 24 of 46<br />
03 6.9 Date issued:<br />
12 December 2010<br />
Observati<strong>on</strong>:<br />
Date due: 1 st Surveillance Date closed: -<br />
A report <strong>on</strong> a sexual harassment case was not treated with proper c<strong>on</strong>fidentiality at the<br />
estates.<br />
Follow up Verificati<strong>on</strong>:<br />
04 6.9 Date issued:<br />
(During next surveillance)<br />
12 December 2010<br />
Observati<strong>on</strong>:<br />
Date due: 1 st Surveillance Date closed: -<br />
There was no training provided for the male workers <strong>on</strong> sexual harassment at all the estates<br />
within the PMU.<br />
Follow up Verificati<strong>on</strong>:<br />
05 4.3.5 Date issued:<br />
(During next surveillance)<br />
12 December 2010<br />
Observati<strong>on</strong>:<br />
Date due: 1 st Surveillance Date closed: -<br />
It was noted at the Pukin estate (i.e. at PR10A), that leguminous cover has not been<br />
established at certain secti<strong>on</strong>s of the immature area, which should be established when the<br />
ground c<strong>on</strong>diti<strong>on</strong> was ready.<br />
Follow up Verificati<strong>on</strong>:<br />
06 5.2 Date issued:<br />
(During next surveillance)<br />
12 December 2010<br />
Observati<strong>on</strong>:<br />
Date due: 1 st Surveillance Date closed: -<br />
The HCV assessment reports can be enhanced by having more photographs of species<br />
identified during the assessments performed. The HCV report dated 1 st October 2010 should<br />
also identify as many comm<strong>on</strong> species i.e. mammals, birds and fishes found in the estate(s)<br />
envir<strong>on</strong>ment e.g. egrets, her<strong>on</strong>s and l<strong>on</strong>g tail macaque. Cooperati<strong>on</strong> with the forestry/land<br />
department can be further enhanced to gather informati<strong>on</strong> <strong>on</strong> the wildlife near the land<br />
boundaries. The knowledge of species particularly ERT species at the boundaries could<br />
significantly affect c<strong>on</strong>servati<strong>on</strong> status (e.g. IUCN status) which can be covered more in depth<br />
in the HCV reports.<br />
Follow up Verificati<strong>on</strong>:<br />
(During next surveillance)<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 25 of 46<br />
07 5.2 Date issued:<br />
12 December 2010<br />
Observati<strong>on</strong>:<br />
Date due: 1 st Surveillance Date closed: -<br />
HCV biodiversity areas / forests type 6 e.g. church, temples, shrines, surau/mosques,<br />
cemetery etc has been appropriately identified for PUKIN GROUPING-PMU estates and mill<br />
based <strong>on</strong> the assessment report dated 1 st October 2010. However, the HCV(s) actual<br />
boundaries, dimensi<strong>on</strong>s / hectarage and the latitude & l<strong>on</strong>gitude (where not fully determined<br />
yet) could be further defined for future reference.<br />
Follow up Verificati<strong>on</strong>:<br />
(During next surveillance)<br />
Identified Positive Elements<br />
1. Support provided to schools for the foreign estate workers children.<br />
2. Proper Housing, Crèche and Medical facilities.<br />
3. Priority given <strong>on</strong> the training and awareness <strong>on</strong> the health and safety aspects related to work for the workers.<br />
4. Establishment of the Employees C<strong>on</strong>sultative Committee (ECC) which has included gender and workers<br />
representati<strong>on</strong> for solving internal disputes and making improvements.<br />
3.3 Issues Raised by Stakeholders and Findings related to each issue<br />
In the course of the assessment for the PUKIN GROUPING-PMU, written comments received by MICM from stakeholders<br />
such as the NGOs and Local Authorities c<strong>on</strong>cerning IOI had been followed up during the assessment accordingly.<br />
The issues raised by the stakeholders were resp<strong>on</strong>ded by IOI in a suitable manner.<br />
Details are under Appendix E: Stakeholders comments and IOI / PUKIN GROUPING-PMU resp<strong>on</strong>se.<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 26 of 46<br />
4.0 Assessment C<strong>on</strong>clusi<strong>on</strong> and Recommendati<strong>on</strong><br />
Moody Internati<strong>on</strong>al Certificati<strong>on</strong> (Malaysia) Sdn Bhd (MICM) has successfully c<strong>on</strong>ducted an assessment <strong>on</strong> PUKIN<br />
GROUPING-PMU operati<strong>on</strong>s of 1 palm oil mill and 4 oil palm estates. PUKIN GROUPING-PMU has been able to<br />
dem<strong>on</strong>strate its compliance with the RSPO Principles and Criteria (October 2007); Malaysian Nati<strong>on</strong>al Interpretati<strong>on</strong> (MY-<br />
NI, November 2010) and RSPO Supply Chain Certificati<strong>on</strong> (November 2009) for POM<br />
The MICM assessment team recommends that PUKIN GROUPING-PMU be approved as a producer of RSPO Certified<br />
<strong>Sustainable</strong> <strong>Palm</strong> <strong>Oil</strong>.<br />
Signed for and <strong>on</strong> behalf of<br />
MOODY INTERNATIONAL CERTIFICATION<br />
(MALAYSIA) SDN BHD<br />
Mr. Sivabalan Thavarajah<br />
Lead Assessor<br />
Date: 12 June 2012<br />
4.1 Acknowledgement of Internal Resp<strong>on</strong>sibility and C<strong>on</strong>firmati<strong>on</strong> of Assessment Findings<br />
This is to acknowledge and c<strong>on</strong>firm the assessment visits described in this report and the acceptance of the c<strong>on</strong>tents and<br />
findings in this assessment report.<br />
Signed for and <strong>on</strong> behalf of<br />
IOI CORPORATION BERHAD<br />
Mr. Too Heng Liew<br />
Head of Sustainability<br />
Date: 12 June 2012<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 27 of 46<br />
Appendix A: Qualificati<strong>on</strong>s of Lead Assessor and Assessment Team<br />
Mr. T Sivabalan (SV) – Lead Assessor – Envir<strong>on</strong>mental & Legal, HCV, OSH, Social Resp<strong>on</strong>sibility.<br />
–BSc (Envir<strong>on</strong>mental Science) (H<strong>on</strong>s), MSc (Quality Improvement & Productivity)<br />
Mr. Augustine Loh (AL) – Assessor – Envir<strong>on</strong>mental & Legal, OSH.<br />
– MBA, Dip.NS (Maritime Studies)<br />
Mr. Jumat Majid – Assessor – Social Resp<strong>on</strong>sibility and Workers Welfare<br />
– BSc (Social Science)<br />
Mr. Chen Fai Kok (CFK) – Assessor / Technical Expert – Good Agricultural Practices and IPM<br />
– Dip (Agriculture)<br />
Mr. N. Retnasabapathy (NR) – Assessor / Technical Expert – Good Agricultural Practices and IPM<br />
– BSc (Agriculture)<br />
Mr. T Sivabalan (SV) is a Third Party Assessment (TPA) Lead auditor for ISO 9001, ISO 14001, OHSAS 18001, WRAP<br />
and RCOC. He has over 8 year‟s fieldwork experience in various ecosystems including plantati<strong>on</strong>s. He has successfully<br />
completed the IRCA accredited LAC in ISO 9001:2008, ISO 14001:2004, OHSAS 18001:2007, Requirement for Chain-of-<br />
Custody Certificati<strong>on</strong> (RCOC) by MTCC/ PEFC, WRAP Accredited M<strong>on</strong>itor Training and RSPO P&C MY-NI Lead<br />
Assessor course. He has performed over 500 auditing days in quality, envir<strong>on</strong>mental, safety & health, WRAP<br />
(accountability and social resp<strong>on</strong>sibility audit), product certificati<strong>on</strong> and RCOC assessments in various sectors including<br />
forestry authorities and forestry research centers. He was part of the RSPO Assessment team which audited several<br />
RSPO certified Plantati<strong>on</strong> Management Units in 2009 -2011.<br />
Mr. Augustine Loh (AL) is an IRCA Third Party Assessment (TPA) Lead Auditor and IRCA Lead Tutor for IRCA ISO 9001<br />
and OHSAS 18001 Lead Auditor Courses as well as Tutor for RSPO Programs and Integrated Management System. He<br />
has over 10 years of fieldwork and experience in <strong>Palm</strong> based product survey, supply chain m<strong>on</strong>itoring, inspecti<strong>on</strong> and<br />
testing. He has successfully completed the IRCA accredited Lead Auditor course in ISO 9001:2008, ISO 14001:2004,<br />
OHSAS 18001:2007, ISO 22000, RSPO Lead Assessor Course and Internati<strong>on</strong>al <strong>Sustainable</strong> Carb<strong>on</strong> Certificati<strong>on</strong> (ISCC)<br />
Lead Auditor course. He is currently the Intertek-Moody RSPO Program Manager and has performed over 500 auditing<br />
days <strong>on</strong> quality, envir<strong>on</strong>mental and safety & health assessments in various sectors including oil palm plantati<strong>on</strong>s. He was<br />
part of the RSPO Assessment team which audited several RSPO certified Plantati<strong>on</strong> Management Units in 2009 - 2011.<br />
Mr Jumat Majid (JM) has over 13 years work experience in the agriculture sector. He has successfully completed the<br />
IRCA accredited Lead Auditor course in ISO 9001:2008 and RSPO P&C MY-NI Lead Assessor course. He has also<br />
successfully completed training programs in Organic Agriculture Development and had performed organic agriculture<br />
inspecti<strong>on</strong>s and assessments for more than 6 years. He has been involved in NGO work in the areas of social impact<br />
assessments within the South East Asia regi<strong>on</strong>. He was part of the RSPO Assessment team which audited a RSPO<br />
certified Plantati<strong>on</strong> Management Unit in 2010.<br />
Mr. Chen Fai Kok (CFK) has over 30 years work experience in the plantati<strong>on</strong> sector. He has held a Senior Management<br />
role in the estate field operati<strong>on</strong>s including GAP and IPM. He had also served as the branch Chairman of the Incorporated<br />
Society of Planters (ISP) in several branches for over 20 years. He has successfully completed training in Estate<br />
Management and the RSPO P&C MY-NI Lead Assessor course. He was part of the RSPO Assessment team which<br />
audited several RSPO certified Plantati<strong>on</strong> Management Units in 2009 - 2011.<br />
Mr. N. Retnasabapathy (NR) has over 25 years work experience in the plantati<strong>on</strong> sector. He has held a Senior<br />
Management role in the estate field operati<strong>on</strong>s. He was a member of the Incorporated Society of Planters (ISP) and had<br />
implemented GAP, IPM and workers management system at various estates in Malaysia. He has successfully completed<br />
the IRCA accredited Lead Auditor course in ISO 9001:2008 and RSPO P&C MY-NI Lead Assessor course. He was part of<br />
the RSPO Assessment team which audited several RSPO certified Plantati<strong>on</strong> Management Units in 2009 - 2011.<br />
.<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 28 of 46<br />
Appendix B: Certificati<strong>on</strong> Assessment Programme (Actual)<br />
Date Time Assessors and Assessment Activity<br />
Augustine Loh (AUG) &<br />
T. Sivabalan (SV)<br />
Chen Fai Kok (CFK) &<br />
N. Retnasabapathy (NR)<br />
Jumat Majid (JM)<br />
08 /12/10<br />
Day 1<br />
10.00 –<br />
10.30 am<br />
10.30 –<br />
6.00 pm<br />
Lunch<br />
break at<br />
12.30 –<br />
1.30 pm<br />
Locati<strong>on</strong>: Pukin <strong>Palm</strong> <strong>Oil</strong> Mill, Rompin, Pahang - Opening meeting<br />
Site assessment<br />
at Pukin <strong>Oil</strong> Mill (POM)<br />
Documentati<strong>on</strong> Review<br />
HR – Workers Training<br />
Mill Operati<strong>on</strong>s – Effluent<br />
Treatment & Disposal<br />
(waste management)<br />
Interviews with Staff &<br />
Workers<br />
Interviews with FFB<br />
Suppliers, C<strong>on</strong>tractors<br />
Assessment <strong>on</strong> P1 to P8<br />
at Mill<br />
Mill inspecti<strong>on</strong>s &<br />
verificati<strong>on</strong>s<br />
receiving FFB to PO<br />
storage<br />
boiler, workshop, etc<br />
chemical store,<br />
handling, labeling<br />
Site assessment<br />
at Pukin Estate<br />
Documentati<strong>on</strong> Review<br />
Field Inspecti<strong>on</strong>s &<br />
verificati<strong>on</strong>s<br />
Interviews with Staff &<br />
Workers<br />
Interviews with<br />
C<strong>on</strong>tractors, Government<br />
agencies, NGOs etc<br />
Housing, Clinics and<br />
Community facilities<br />
Assessment <strong>on</strong> P1 to P8<br />
including GAP<br />
including IPM<br />
chemical store, handling,<br />
labeling<br />
Site assessment<br />
at Pukin Estate<br />
Documentati<strong>on</strong> Review<br />
HR – Review of Pay &<br />
C<strong>on</strong>diti<strong>on</strong>s, Worker<br />
C<strong>on</strong>tracts, Training<br />
Interviews with Staff &<br />
Workers<br />
Interviews with<br />
C<strong>on</strong>tractors,<br />
Government agencies,<br />
NGOs etc<br />
Housing, Clinics and<br />
Community facilities<br />
Assessment <strong>on</strong> P6<br />
including GAP<br />
chemical store,<br />
handling, labeling<br />
09 /12/10<br />
Day 2<br />
6 – 7 pm Break<br />
7 – 10 pm Team meeting and discussi<strong>on</strong><br />
8.am - 12<br />
no<strong>on</strong><br />
Assessment <strong>on</strong> P1 to P8<br />
at Pukin Mill & Estate<br />
Mill inspecti<strong>on</strong>s &<br />
verificati<strong>on</strong>s<br />
including receiving FFB to<br />
PO storage<br />
including boiler, workshop,<br />
etc<br />
including chemical store,<br />
handling, labelling<br />
Site assessment<br />
at Shahzan 1 & 2 Estates<br />
Documentati<strong>on</strong> Review<br />
Field Inspecti<strong>on</strong>s &<br />
verificati<strong>on</strong>s<br />
Interviews with Staff &<br />
Workers<br />
Interviews with<br />
C<strong>on</strong>tractors, Government<br />
agencies, NGOs etc<br />
Housing, Clinics and<br />
Community facilities<br />
12 – 1 pm Break<br />
Site assessment<br />
at Shahzan 1 & 2 Estates<br />
Documentati<strong>on</strong> Review<br />
Field Inspecti<strong>on</strong>s &<br />
verificati<strong>on</strong>s<br />
Interviews with Staff &<br />
Workers<br />
Interviews with<br />
C<strong>on</strong>tractors,<br />
Government agencies,<br />
NGOs etc<br />
Housing, Clinics and<br />
Community facilities<br />
1 – 6 pm Assessment <strong>on</strong> P1 to P8<br />
Mill & Field inspecti<strong>on</strong>s &<br />
verificati<strong>on</strong>s<br />
GAP<br />
HCV (if any) – special<br />
focus<br />
chemical store, handling,<br />
labeling<br />
Assessment <strong>on</strong> P1 to P8<br />
Field inspecti<strong>on</strong>s &<br />
verificati<strong>on</strong>s<br />
GAP<br />
IPM<br />
chemical store, handling,<br />
labeling<br />
Assessment <strong>on</strong> P1 to P8<br />
Field inspecti<strong>on</strong>s &<br />
verificati<strong>on</strong>s<br />
GAP<br />
chemical store,<br />
handling, labeling<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 29 of 46<br />
10 /12/10<br />
Day 3<br />
11 /12/10<br />
Day 4<br />
6 – 7 pm Break<br />
7 – 10 pm Team discussi<strong>on</strong><br />
8.am - 12 Site assessment at Segamat Site assessment at<br />
no<strong>on</strong> Estate<br />
Segamat Estate<br />
Documentati<strong>on</strong> Review Documentati<strong>on</strong> Review<br />
HR – Review of Pay & Field Inspecti<strong>on</strong>s &<br />
C<strong>on</strong>diti<strong>on</strong>s, Worker<br />
verificati<strong>on</strong>s<br />
C<strong>on</strong>tracts, Training Interviews with Staff &<br />
Interviews with Staff &<br />
Workers<br />
Workers<br />
Interviews with<br />
C<strong>on</strong>tractors, Government<br />
agencies, NGOs etc<br />
12 – 1 pm Break<br />
1 – 6 pm Assessment <strong>on</strong> P1 to P8 Assessment <strong>on</strong> P1 to P8<br />
Field inspecti<strong>on</strong>s &<br />
verificati<strong>on</strong>s<br />
Field inspecti<strong>on</strong>s &<br />
verificati<strong>on</strong>s<br />
including HCV (if any) – including GAP<br />
special focus<br />
including IPM<br />
including chemical store,<br />
handling, labeling<br />
including chemical store,<br />
handling, labeling<br />
6 – 7 pm Break<br />
7 – 10 pm Team meeting and discussi<strong>on</strong><br />
8.am - 12<br />
no<strong>on</strong><br />
At Pukin Estate<br />
– meeting for review of<br />
assessment findings <strong>on</strong><br />
P1 to P8<br />
<br />
Follow up activities and<br />
verificati<strong>on</strong>s and interviews<br />
At Pukin Estate<br />
– meeting for review of<br />
assessment findings <strong>on</strong><br />
P1 to P8<br />
12 – 1 pm Break<br />
<br />
Follow up activities and<br />
verificati<strong>on</strong>s and interviews<br />
1 – 4 pm Preparati<strong>on</strong> for closing meeting<br />
Site assessment at<br />
Segamat Estate<br />
Documentati<strong>on</strong> Review<br />
Field Inspecti<strong>on</strong>s &<br />
verificati<strong>on</strong>s<br />
Interviews with Staff &<br />
Workers<br />
Interviews with<br />
C<strong>on</strong>tractors,<br />
Government agencies,<br />
NGOs etc<br />
Assessment <strong>on</strong> P1 to P8<br />
Housing<br />
Clinics and Community<br />
facilities<br />
Other Social matters<br />
At Pukin Estate<br />
– meeting for review of<br />
assessment findings <strong>on</strong><br />
P1 to P8<br />
Follow up activities and<br />
verificati<strong>on</strong>s and<br />
interviews<br />
4 – 5 pm Team Meeting and Discussi<strong>on</strong> with IOI - PMU representatives<br />
5 pm Closing meeting<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 30 of 46<br />
Appendix C1: Locati<strong>on</strong> Map 1 of PUKIN GROUPING-PMU<br />
PUKIN GROUPING-PMU<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 31 of 46<br />
Appendix C2: Locati<strong>on</strong> Map 2 of PUKIN GROUPING-PMU<br />
PUKIN<br />
POM<br />
Legend:<br />
C - Pukin <strong>Oil</strong> Mill<br />
1 – Shahzan 1 & Shahzan 2 Estates<br />
2 – Pukin Estate<br />
3 – Segamat Estate<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 32 of 46<br />
Appendix C3: Field Map Pukin POM and Estate<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 33 of 46<br />
Appendix C4: Field Map Shahzan (1) estate<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 34 of 46<br />
Appendix C5: Field Map Shahzan (2) estate<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 35 of 46<br />
Appendix C6: Field Map Segamat estate<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 36 of 46<br />
Appendix C7: Slope Map Pukin estate<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 37 of 46<br />
Appendix C8: Slope Map Pukin estate<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 38 of 46<br />
Appendix C8: Topography Map Pukin estate<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 39 of 46<br />
Appendix D: Photographs of Assessment findings at PUKIN GROUPING-PMU<br />
Signboards at the Pukin Grouping PMU i.e. Pukin estate<br />
Signboards at the Pukin Grouping PMU i.e. Pukin estate<br />
Signboards at the Pukin Grouping i.e. Shahzan estate.<br />
Signboards at the Pukin Grouping i.e. Segamat estate.<br />
Signboards at the buffer z<strong>on</strong>es at the Pukin estate.<br />
Barn owl box at the Segamat estate<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 40 of 46<br />
Pesticide spraying worker equipped with protective wear.<br />
Storage areas for the chemicals at the Segamat estate<br />
Segregati<strong>on</strong> bins for the different general wastes.<br />
Fencing was erected and simplified operating procedures<br />
were displayed at the entrance of water pump house after<br />
the RSPO audit.<br />
Appendix E1: Stakeholders comment, PUKIN GROUPING - PMU resp<strong>on</strong>se and MICM verificati<strong>on</strong> / comments<br />
Note 1:<br />
There was no negative issue / feedback from the Local Government Agencies which were invited for comment <strong>on</strong> the<br />
assessment <strong>on</strong> the PMU. Comments reported in the earlier RSPO Summary reports including those performed by other<br />
CBs <strong>on</strong> the other estates within the Pahang and Johor regi<strong>on</strong> were reviewed with no adverse issues needing our further<br />
verificati<strong>on</strong>.<br />
Note 2:<br />
There was no negative issue / feedback received from the N<strong>on</strong> Governmental Organisati<strong>on</strong>s <strong>on</strong> the said PMU.<br />
Note 3:<br />
There was no negative issue / feedback received from the local communities or any other interested party <strong>on</strong> the said<br />
PMU.<br />
However in the course of certificati<strong>on</strong> for this PMU, some case disputes which were unresolved for IOI Group plantati<strong>on</strong>s<br />
located at Sarawak, Malaysia and Kalimantan, Ind<strong>on</strong>esia were brought to attenti<strong>on</strong> and were subsequently followed up.<br />
Details are as per Appendix E2 below:<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 41 of 46<br />
Appendix E2: Feedback and resp<strong>on</strong>se to Stakeholders comments <strong>on</strong> the other Management units of the IOI<br />
Group of Plantati<strong>on</strong>s and MICM verificati<strong>on</strong>. (Refer to RSPO Certificati<strong>on</strong> Systems document, para. 4.2.4)<br />
In the course of finalizing the report for IOI Pukin, there was feedback received through the RSPO Secretariate via the<br />
public announcement uploaded at the RSPO website <strong>on</strong> 26 th September 2011 in which RSPO had decided to suspend<br />
the new RSPO certificati<strong>on</strong>s for the IOI Group under the following circumstances as extracted:<br />
Breach of RSPO Code of C<strong>on</strong>duct 2.3 & Certificati<strong>on</strong> Systems 4.2.4 (c)<br />
Historical: On March 30th, 2011, a formal letter was sent to IOI Research Centre and IOI Corporati<strong>on</strong> Berhad (IOI) <strong>on</strong><br />
complaints raised by several N<strong>on</strong> Governmental Organizati<strong>on</strong>s namely Migros, Friends of the Earth and Grassroots as<br />
well as the local community of L<strong>on</strong>g Teran Kanan in Sarawak.<br />
The statement indicated that the RSPO Grievance Panel has taken several measures against IOI for breaching two core<br />
membership mandates and obligati<strong>on</strong>s:<br />
1. RSPO‟s Code of C<strong>on</strong>duct 2.3: members will commit to open and transparent engagement with interested parties<br />
and actively seek resoluti<strong>on</strong> of c<strong>on</strong>flict<br />
2. RSPO‟s Certificati<strong>on</strong> Systems 4.2.4 (c): Organizati<strong>on</strong>s with more than <strong>on</strong>e management unit and/or that have a<br />
c<strong>on</strong>trolling holding in more than <strong>on</strong>e aut<strong>on</strong>omous company will be permitted to certify individual management<br />
units and/or subsidiary companies <strong>on</strong>ly if there are no significant land c<strong>on</strong>flicts, no replacement of primary forest<br />
or any area c<strong>on</strong>taining HCVs since November 2005, no labour disputes that are not being resolved through an<br />
agreed process and no evidence of n<strong>on</strong>-compliance with law in any of the n<strong>on</strong>-certified holdings.<br />
The measures announced in the public announcement <strong>on</strong> March 31th 2011 included:<br />
1. The suspensi<strong>on</strong> of the current and <strong>on</strong>going certificati<strong>on</strong> process of all IOI group‟s activities with effect from date<br />
of announcement.<br />
2. The provisi<strong>on</strong> of 28 days to the IOI group to revert with an acceptable soluti<strong>on</strong> to these matters, which preferably<br />
should be mutually agreed by parties involved.<br />
3. The stipulati<strong>on</strong> to IOI to publish a statement <strong>on</strong> this matter <strong>on</strong> their corporate website.<br />
The suspensi<strong>on</strong> was related to the cases of dispute as follows:<br />
Case 1 - Dispute With The L<strong>on</strong>g Teran Community In Sarawak, Malaysia:<br />
Up<strong>on</strong> review of reports including discussi<strong>on</strong>s and deliberati<strong>on</strong>, the RSPO is pleased to announce that both IOI<br />
Corporati<strong>on</strong> Berhad (IOI) and the complainants are now committed to the process of mediati<strong>on</strong> as a means to resolve the<br />
dispute. Despite having taken some time due to the complexity of the matter, the RSPO views this as a positive progress<br />
in the right directi<strong>on</strong>. The lifting of the current suspensi<strong>on</strong> of new certificati<strong>on</strong> for IOI will be dependent <strong>on</strong> the progress<br />
attained by both parties c<strong>on</strong>cerned as a result of the mediati<strong>on</strong> process.<br />
Case 2 - Dispute In Ketapang District, Kalimantan, Ind<strong>on</strong>esia:<br />
Up<strong>on</strong> diligent review of the documents submitted to the RSPO, it is c<strong>on</strong>cluded that the c<strong>on</strong>cerns with regards to drained<br />
peat land <strong>on</strong> wildlife habitat and clearing of HCV of primary forests have not been proven.<br />
However, IOI has accepted that some of the procedural requirements by the RSPO with regards to the permits for new<br />
plantings were not adequately complied with. In line with this, IOI has arrived at an agreement with RSPO in committing to<br />
improvements in operati<strong>on</strong>al procedures, as well as to comply with all RSPO requirements moving forward.<br />
Lifting of Suspensi<strong>on</strong> for New Certificati<strong>on</strong>s for IOI Group:<br />
On 8 May 2012, following an announcement made by RSPO, an interim lifting suspensi<strong>on</strong> for the new certificati<strong>on</strong>s for IOI<br />
Group (except for IOI estates in the state of Sarawak) valid for a period of 6 m<strong>on</strong>ths. See links below for details and<br />
c<strong>on</strong>diti<strong>on</strong>s in the communicati<strong>on</strong> from RSPO to IOI and related parties dated 3 May 2012:<br />
http://www.rspo.org/file/RSPO%20letter%20to%20IOI%20LTK%20sNGO%2020120503.pdf<br />
Therefore, the IOI-Pukin Grouping PMU report which had been held in abeyance after clearing the RSPO peer review<br />
since January 2011 due to the above stated issues has now been revised and updated to include the latest development<br />
for IOI Group new certificati<strong>on</strong>s for RSPO acceptance.<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 42 of 46<br />
Appendix F: Time Bound Plan for the Other Management units (updated for 2011/ 2012)<br />
Financial PMU<br />
Year<br />
PLANTATIONS -<br />
MALAYSIA<br />
2011 / Pamol<br />
2012 Sabah POM<br />
Sakilan<br />
POM<br />
Pamol<br />
Kluang<br />
POM<br />
Gomali<br />
POM<br />
Main<br />
Assessment<br />
D<strong>on</strong>e in May<br />
2008<br />
D<strong>on</strong>e in Nov<br />
2008<br />
D<strong>on</strong>e in March<br />
2009<br />
D<strong>on</strong>e in August<br />
2009<br />
Certificati<strong>on</strong><br />
Status<br />
Certified in Feb<br />
2009<br />
Certified in<br />
March 2010<br />
Certified in<br />
March 2010<br />
Certified in<br />
August 2010<br />
Surveillance<br />
Assessment<br />
ASA-01 d<strong>on</strong>e in<br />
Nov 2009<br />
ASA-02 d<strong>on</strong>e in<br />
Jan 2011<br />
ASA-03 d<strong>on</strong>e in<br />
Feb 2012<br />
ASA-01 d<strong>on</strong>e in<br />
Jan 2011<br />
ASA-02 d<strong>on</strong>e in<br />
Feb 2012<br />
ASA-01 d<strong>on</strong>e in<br />
March 2011<br />
ASA-02 d<strong>on</strong>e in<br />
Feb 2012<br />
ASA-01 d<strong>on</strong>e in<br />
August 2011<br />
Current Status<br />
ASA-04 planned in Jan 2013<br />
ASA-03 planned in Feb 2013<br />
ASA-03 planned in March 2013<br />
ASA-02 planned in August 2012<br />
Batur<strong>on</strong>g<br />
POM<br />
D<strong>on</strong>e in Sept<br />
2009<br />
Certified in<br />
October 2010<br />
ASA-01 d<strong>on</strong>e in<br />
October 2011<br />
ASA-02 planned in October 2012<br />
Bukit Leelau<br />
POM<br />
D<strong>on</strong>e in April<br />
2010<br />
Certified in<br />
Nov 2010<br />
ASA-01 d<strong>on</strong>e in<br />
Nov 2011<br />
ASA-02 planned in Nov 2012<br />
Mayvin<br />
POM<br />
D<strong>on</strong>e in August<br />
2010<br />
Certified in<br />
Dec 2010<br />
ASA-01 d<strong>on</strong>e in<br />
July 2011<br />
ASA-02 planned in July 2012<br />
Pukin POM<br />
Syarimo<br />
POM<br />
Ladang<br />
Sabah POM<br />
Leepang<br />
POM<br />
Morisem<br />
POM<br />
D<strong>on</strong>e in Dec<br />
2010<br />
Planned –<br />
September<br />
2012<br />
Planned –<br />
October 2012<br />
Planned –<br />
August 2012<br />
Planned –<br />
Nov‟ 2012<br />
Pending<br />
approval<br />
ASA-01 planned<br />
in Nov 2012<br />
Expected certificati<strong>on</strong> in June<br />
2012<br />
- - -<br />
- - -<br />
- - -<br />
- - -<br />
Financial PMU<br />
Year<br />
PLANTATIONS -<br />
INDONESIA<br />
2011 / PT SKS<br />
2012<br />
PT BNS<br />
IOI-Pelita Planned –<br />
June 2014<br />
Main<br />
Assessment<br />
Planned – Dec<br />
2016<br />
Planned – Dec<br />
2016<br />
- - Mediati<strong>on</strong> process is <strong>on</strong>-going<br />
between IOI and local community<br />
<strong>on</strong> land dispute issue.<br />
Certificati<strong>on</strong><br />
Status<br />
Surveillance<br />
Assessment<br />
- - -<br />
- - -<br />
Current Status<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 43 of 46<br />
Appendix G: Supply Chain Requirements which are applicable to CPO Mills<br />
1. Documented procedures<br />
Requirements<br />
1.1 The facility shall have written procedures and/or work instructi<strong>on</strong>s to ensure the<br />
implementati<strong>on</strong> of all the elements specified. This shall include at minimum the<br />
following:<br />
SG<br />
(Segregati<strong>on</strong>)<br />
MB<br />
(Mass Balance)<br />
- See below<br />
a) Complete and up to date procedures covering the implementati<strong>on</strong> of all the<br />
elements in these requirements<br />
b) Complete and up to date records and reports that dem<strong>on</strong>strate compliance with<br />
these requirements.<br />
c) The name of the pers<strong>on</strong> having overall resp<strong>on</strong>sibility for and authority over the<br />
implementati<strong>on</strong> of these requirements and compliance with all applicable<br />
requirements. This pers<strong>on</strong> shall be able to dem<strong>on</strong>strate awareness of the facility‟s<br />
procedures for the implementati<strong>on</strong> of this standard.<br />
2. Purchasing and goods in<br />
2.1 The facility shall ensure that purchases of RSPO certified palm oil and palm oil<br />
products are in compliance with the following:<br />
a)The facility shall have documentati<strong>on</strong> that dem<strong>on</strong>strates that purchases are made<br />
to the material category agreed with their supplier (IP, SG, MB) (e.g. specified in<br />
purchase orders, c<strong>on</strong>tracts, material specificati<strong>on</strong>s)The facility receiving RSPO<br />
certified oil palm products shall ensure that the products are verified as being RSPO<br />
certified. For facilities that are required to announce and c<strong>on</strong>firm trades in the RSPO<br />
IT System (all facilities up the final refinery) this shall include making Shipping<br />
Announcements and Shipping C<strong>on</strong>firmati<strong>on</strong>s in the RSPO IT System <strong>on</strong> the level of<br />
each shipment.<br />
b) A check of the validity of the Supply Chain Certificati<strong>on</strong> of suppliers is required for<br />
all facilities that are SCCS certified. This shall be checked via the list of RSPO<br />
Supply Chain Certified facilities <strong>on</strong> the RSPO website www.rspo.org or the RSPO IT<br />
System within a reas<strong>on</strong>able timeframe.<br />
2.2 The facility shall have a mechanism in place for handling n<strong>on</strong>-c<strong>on</strong>forming<br />
material/documents. This mechanism should also be used to take appropriate steps<br />
when the Supply Chain certificati<strong>on</strong> of a supplier is found to be invalid.<br />
3. Outsourcing activities<br />
3.1. In cases where an operati<strong>on</strong> seeking or holding certificati<strong>on</strong> outsources activities<br />
to independent third parties (e.g. subc<strong>on</strong>tractors for storage, transport or other<br />
outsourced activities), the operati<strong>on</strong> seeking or holding certificati<strong>on</strong> shall ensure that<br />
the independent third party complies with the intent and requirements of the RSPO<br />
Supply Chain Standard (This requirement should not apply to outsourced storage<br />
facilities where the management of the mass balance and instructi<strong>on</strong>s for tank<br />
movements are c<strong>on</strong>trolled by the organizati<strong>on</strong> (not the tank farm manager).<br />
3.2. Facilities which wish to include outsourcing within the scope of their RSPO<br />
Supply Chain certificate shall ensure the following:<br />
a) The facility has legal ownership of all input material to be included in outsourced<br />
processes;<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 44 of 46<br />
b) The facility does not relinquish legal ownership of the materials during outsourced<br />
processing;<br />
c) The facility has an agreement or c<strong>on</strong>tract covering the outsourced process with<br />
each c<strong>on</strong>tractor through either a signed and enforceable agreement with the<br />
subc<strong>on</strong>tractor. The <strong>on</strong>us is <strong>on</strong> the facility to ensure that certificati<strong>on</strong> bodies have<br />
access to the outsourcing c<strong>on</strong>tractor or operati<strong>on</strong> if an audit is deemed necessary.<br />
d) The facility has a documented c<strong>on</strong>trol system with explicit procedures for the<br />
outsourced process which are shared with the relevant c<strong>on</strong>tractor.<br />
e) The facility seeking or holding certificati<strong>on</strong> shall furthermore ensure (e.g. through<br />
c<strong>on</strong>tractual arrangements) that independent third parties engaged, provide<br />
unrestricted access to their respective operati<strong>on</strong>s, systems, and any and all<br />
informati<strong>on</strong> to certificati<strong>on</strong> bodies that are duly approved by the RSPO when this is<br />
announced in advance.<br />
3.3. The facility shall record the names and c<strong>on</strong>tact details of all c<strong>on</strong>tractors used for<br />
the processing or producti<strong>on</strong> of RSPO certified materials.<br />
3.4. The facility shall inform its certificati<strong>on</strong> body about the names and c<strong>on</strong>tact details<br />
of any new c<strong>on</strong>tractor used for the processing or producti<strong>on</strong> of RSPO certified<br />
materials.<br />
4. Sales and goods out<br />
4.1. The facility shall ensure that all sales invoices or relevant documents, e.g.<br />
delivery notes, shipping documents and specificati<strong>on</strong> documentati<strong>on</strong>, issued for<br />
RSPO certified oil palm products delivered include sufficient informati<strong>on</strong>, this may<br />
include the following:<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
a) The name and address of the buyer; Yes / No / N.A Yes / No / N.A<br />
b) The name and address of the seller; Yes / No / N.A Yes / No / N.A<br />
c) The loading or delivery date; Yes / No / N.A Yes / No / N.A<br />
d) The date <strong>on</strong> which the documents were issued; Yes / No / N.A Yes / No / N.A<br />
e) A descripti<strong>on</strong> of the product, including the applicable supply chain model (Identity<br />
Preserved, Segregated or Mass Balance<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
f) The quantity of the products delivered; Yes / No / N.A Yes / No / N.A<br />
e) Any related transport documentati<strong>on</strong> Yes / No / N.A Yes / No / N.A<br />
g) Supply chain certificati<strong>on</strong> reference number Yes / No / N.A Yes / No / N.A<br />
5. Registrati<strong>on</strong><br />
5.1. Supply chain actors who take legal ownership and physically handle RSPO<br />
Certified <strong>Sustainable</strong> oil palm products and who are part of the supply chain of<br />
RSPO Certified <strong>Sustainable</strong> oil palm products before and up to the (final) refinery<br />
need to register their transacti<strong>on</strong> in the RSPO IT System up<strong>on</strong> the moment of<br />
physical shipment (At present, it is not yet possible to enter palm kernel product<br />
transacti<strong>on</strong>s into the RSPO IT System. Therefore, until further notice, the reporting of<br />
trades into a central database will not be required. Trade will be m<strong>on</strong>itored by RSPO<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012<br />
Yes / No / N.A<br />
Yes / No / N.A
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 45 of 46<br />
accredited certificati<strong>on</strong> bodies as part of supply chain certificati<strong>on</strong> audits that also<br />
cover the palm kernel product supply chain)<br />
Actors who must register include:<br />
a) <strong>Palm</strong> oil mills producing RSPO certified palm oil and palm kernel oil<br />
b) Refineries (The final refinery – the refinery that does not further deliver to other<br />
refineries directly or indirectly via traders - <strong>on</strong>ly needs to c<strong>on</strong>firm the receipt of<br />
shipments; it does not need to do sales announcements)<br />
Actors that do NOT need to register include:<br />
a) Traders that are part of a string and therefore legal owners, but do not physically<br />
handle the material (the Traceability number will accompany shipping documents)<br />
b) All operators after the final refinery, e.g. end product manufacturers and retailers<br />
For definiti<strong>on</strong>s of legal owner, refinery, end product manufacturer and string, please<br />
see definiti<strong>on</strong>s in secti<strong>on</strong> 4. For more details <strong>on</strong> the registrati<strong>on</strong> please see the<br />
Guidelines <strong>on</strong> the RSPO IT System.<br />
6. Training<br />
6.1. The facility shall have a defined training plan, which is subject to <strong>on</strong>-going<br />
review and supported by training records.<br />
6.2. The facility shall provide the training for all staff as required to implement the<br />
requirements of the Supply Chain Certificati<strong>on</strong> Systems.<br />
6.3. The facility shall keep records of the training provided to staff in relati<strong>on</strong> to<br />
implementati<strong>on</strong> of these requirements.<br />
7. Claims<br />
7.1. The facility shall <strong>on</strong>ly make claims regarding the use of or support of RSPO<br />
certified oil palm products that are in compliance with the RSPO Rules for<br />
Communicati<strong>on</strong>s and Claims.<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
Yes / No / N.A<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012
MOODY INTERNATIONAL CERTIFICATION (MALAYSIA) SDN BHD<br />
(188296-W)<br />
Report No.: R2020/10-1 IOI Corporati<strong>on</strong> Berhad - Pukin Page 46 of 46<br />
Appendix H: MICM - RSPO Certificate details for IOI-PUKIN GROUPING-PMU<br />
Certificate No: RSPO 927888<br />
Issue date: 13 June 2012 (RSPO approval date)<br />
Expiry date: 12 June 2017 (5 years from approval date)<br />
IOI CORPORATION BERHAD<br />
RSPO Membership No: 2-0002-04-000-00<br />
Plantati<strong>on</strong> Management Unit (PMU) – Pukin Grouping<br />
Address: 30km, Lebuhraya Tun Abdul Razak, Kerat<strong>on</strong>g, Rompin, Pahang, Malaysia.<br />
Standards:<br />
RSPO Principles and Criteria (October 2007); Malaysian Nati<strong>on</strong>al Interpretati<strong>on</strong> (MY-NI, November 2010) and RSPO<br />
Supply Chain Certificati<strong>on</strong> (November 2009) for POM<br />
Certificati<strong>on</strong> scope: Producti<strong>on</strong> of Crude <strong>Palm</strong> <strong>Oil</strong> and <strong>Palm</strong> Kernels<br />
Supply Chain model for CPO & PK: Mass Balance (MB)<br />
Details of the Mill and Supply bases covered by this certificate and the t<strong>on</strong>nage approved are:<br />
Name<br />
Pukin <strong>Palm</strong> <strong>Oil</strong> Mill<br />
Pukin Estate<br />
Shahzan 1 Estate<br />
Shahzan 2 Estate<br />
Segamat Estate<br />
Address<br />
30km, Lebuhraya Tun Abdul Razak,<br />
Kerat<strong>on</strong>g, Rompin, Pahang<br />
30km, Lebuhraya Tun Abdul Razak,<br />
Kerat<strong>on</strong>g, Rompin, Pahang<br />
30km, Lebuhraya Tun Abdul Razak,<br />
Kerat<strong>on</strong>g, Rompin, Pahang<br />
36km, Lebuhraya Tun Abdul Razak,<br />
Kerat<strong>on</strong>g, Rompin, Pahang<br />
Km 5, Jalan Segamat Muar, 85009<br />
Segamat, Johor<br />
GPS Reference<br />
Latitude<br />
L<strong>on</strong>gitude<br />
02° 43‟07.9” N 102° 54‟28.7” E<br />
02° 43‟07.9” N 102° 54‟28.7” E<br />
02° 47‟58.5” N 102° 50‟56.3” E<br />
02° 48‟59.6” N 102° 52‟26.5” E<br />
02° 29‟22.0” N 102° 52‟58.5” E<br />
Approximate annual certifiable t<strong>on</strong>nages of CPO and PK producti<strong>on</strong> claimed for certificati<strong>on</strong> (2009/2010):<br />
FFB Processed (MT) from RSPO<br />
assessed / certified sources<br />
CPO Producti<strong>on</strong> claimed for<br />
certificati<strong>on</strong> (MT)<br />
PK Producti<strong>on</strong> claimed for<br />
certificati<strong>on</strong> (MT)<br />
138,286.93 31,139.91 6,562.70<br />
-End of report-<br />
MICM RSPO Report: IOI – Pukin Grouping, Johor, Malaysia, R1, Final - June 2012