boyle local area plan 2012 - 2018 - Roscommon County Council
boyle local area plan 2012 - 2018 - Roscommon County Council
boyle local area plan 2012 - 2018 - Roscommon County Council
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table of Contents<br />
TABLE OF CONTENTS<br />
3.2.4 Roads & Transportation Strategy 26<br />
4.2.9 Community Development Forum 41<br />
PART I:<br />
INTRODUCTION & CONTEXT<br />
CHAPTER 1: INTRODUCTION<br />
1.1 INTRODUCTION AND PURPOSE 1<br />
1.2 CONTENT OF THE REPORT 2<br />
1.3 LEGISLATIVE & POLICY CONTEXT 2<br />
1.4 PUBLIC CONSULTATION 2<br />
1.5 STRATEGIC ENVIRONMENTAL<br />
ASSESSMENT 2<br />
1.6 APPROPRIATE ASSESSMENT 3<br />
1.7 FLOOD RISK ASSESSMENT 3<br />
CHAPTER 2:<br />
HISTORIC CONTEXT, SETTLEMENT<br />
POLICY & VISION<br />
2.4 SETTLEMENT POLICY 8<br />
2.4.1 Settlement Policy & Population Growth 9<br />
2.5 VISION AND STRATEGIC AIMS 11<br />
2.6 DEVELOPMENT STRATEGY FOR BOYLE 12<br />
PART II:<br />
CHAPTER 3:<br />
DEVELOPMENT STRATEGY FOR<br />
<strong>2012</strong>-<strong>2018</strong> & BEYOND<br />
INFRASTRUCTURE & SERVICES<br />
3.1 INTRODUCTION 23<br />
3.2 ROADS & TRANSPORTATION 23<br />
3.2.1 Existing Context 23<br />
3.2.2 Future Development 25<br />
3.2.3 Pedestrian & Cycle Routes 26<br />
3.3 WATER SERVICES 27<br />
3.3.1 Existing Context 27<br />
3.3.2 Water Services Strategy 27<br />
3.4 FLOOD RISK & PROTECTION 29<br />
3.4.1 Existing Context 29<br />
3.4.2 Flood Risk & Protection Strategy 30<br />
3.5 WASTEWATER SERVICES 30<br />
3.5.1 Existing Context 30<br />
3.5.2 Wastewater Services Strategy 31<br />
3.6 WASTE MANAGEMENT 32<br />
3.6.1 Existing Context 32<br />
3.6.2 Waste Management Strategy 33<br />
2.1 LOCATION OF BOYLE 5 3.7 ENERGY 33<br />
2.2 BRIEF HISTORY OF BOYLE TOWN 6 3.7.1 Renewal Energy 33<br />
3.7.2 Electricity 34<br />
2.3 POPULATION CONTEXT 7 3.7.3 Ireland’s Gas Network 34<br />
2.3.1 Population Calculations 7 3.7.4 Energy 7 Strategy 34<br />
2.3.2 An Post Geo-Directory 8<br />
3.8 TELECOMMUNICATIONS 35<br />
3.8.1 Existing Context 35<br />
3.8.2 Telecommunications Strategy 36<br />
CHAPTER 4:<br />
SOCIAL & COMMUNITY<br />
FACILITIES<br />
4.1 INTRODUCTION 37<br />
4.2 EXISTING CONTEXT 37<br />
4.2.1 Community Facilities 37<br />
4.2.2 Schools & Educational Facilities 38<br />
4.2.3 Boyle Town Library 39<br />
4.2.4 Social Inclusion & Disability 40<br />
4.2.5 Childcare Provision 40<br />
4.2.6 Health 40<br />
4.2.7 Fire Service 40<br />
4.2.8 Burial Grounds 41<br />
4.3 SOCIAL & COMMUNITY FACILITIES<br />
STRATEGY 41<br />
CHAPTER 5: RECREATION, LEISURE &<br />
TOURISM<br />
5.1 INTRODUCTION 43<br />
5.2 EXISTING CONTEXT 43<br />
5.2.1 Open Space & Sporting Provision 43<br />
5.2.2 Integrated Tourism & Recreation<br />
Development 45<br />
5.2.3 Tourism 49<br />
5.3 RECREATION, LEISURE & TOURISM<br />
STRATEGY 56<br />
CHAPTER 6: BUILT & NATURAL HERITAGE<br />
6.1 BUILT HERITAGE 57<br />
6.1.1 Architectural Heritage 57<br />
6.1.2 Archaeological Heritage 81<br />
6.1.3 Built Heritage Strategy 81<br />
6.2 NATURAL HERITAGE 83<br />
6.2.1 Designated Sites 84<br />
6.2.2 Nature Conservation, the Wider<br />
Countryside & Biodiversity 85<br />
6.2.3 Alien Species 86<br />
6.2.4 Landscape Character Assessment 86<br />
6.2.5 Habitat Mapping 88<br />
6.2.6 Natural Heritage Strategy 88<br />
CHAPTER 7:<br />
ECONOMIC DEVELOPMENT<br />
& EMPLOYMENT<br />
7.1 INTRODUCTION 91<br />
7.2 EXISTING CONTEXT 91<br />
7.2.1 Environmental Quality/Amenity 93<br />
Boyle Local Area Plan <strong>2012</strong> – <strong>2018</strong> Page i