PART II: DEVELOPMENT STRATEGY FOR <strong>2012</strong> – <strong>2018</strong> & BEYOND Chapter 8: Urban Development<br />

also been considered and the An Post Geodirectory was<br />

used to give an indicative number of vacant units in the<br />

Plan <strong>area</strong> (See appended Map 13). It should be noted<br />

that we cannot assume that every vacant house is for<br />

sale or even available, or that all permitted residential<br />

development will be built. However, the Planning<br />

Authority does encourage the principle of using vacant<br />

residential buildings or those under construction to<br />

satisfy its population growth estimates over the Plan<br />

period, and existing <strong>plan</strong>ning permissions have also<br />

been taken into consideration in the various phases, as<br />

appropriate.<br />

Table 8: Residential Phasing within the Boyle LAP<br />

Type Term Area<br />

Phase 1<br />

(Years 1-9)<br />

Short Term 8.73 Hectares<br />

(21.57 Acres)<br />

Phase 2<br />

(Years 6-15)<br />

Medium<br />

Term<br />

9.24 Hectares<br />

(22.83 Acres)<br />

Phase 3<br />

(Years 12-21)<br />

Long Term 9.53 Hectares<br />

(23.55 Acres)<br />

In terms of the physical suitability of the subject lands it<br />

is considered that all of the lands within the phasing<br />

programme can be serviced by existing water, sewerage<br />

and road infrastructure and are not subject to flooding.<br />

With regard to environmental & heritage policy, the<br />

development of all land within the phasing programme<br />

will be sensitive to the natural and built heritage of the<br />

<strong>area</strong> and will not have a significant negative impact.<br />

The proposed phasing programme is in line with all<br />

policies outlined in this Plan.<br />

Justification of Phase 1, 2 & 3 lands<br />

Determining Factors for Phase 1<br />

1. Location & Need<br />

Phase 1 lands include four land parcels; (A, B, C) east<br />

of the town centre and (D) south of the town centre (See<br />

Figure 11 below and Maps 14a & 14b). These lands<br />

provide an opportunity to consolidate residential<br />

development and to enhance the viability and diversity<br />

of the <strong>area</strong>. These lands do not directly follow the<br />

sequential approach but there are existing permissions<br />

for residential development on two of the land parcels;<br />

A (PD/10/3025) and D (PD/10/3075). The remainder of<br />

the Phase 1 lands (B & C) provides opportunity for<br />

appropriate infill development adjacent to existing<br />

residential development. Appropriate infill development<br />

on such sites will assist in rationalising residential<br />

development in the <strong>area</strong>.<br />

In addition, additional lands have been added for Phase<br />

1 NR lands on the northern boundary of the<br />

development envelope (J) (see Figure 11 and appended<br />

Maps 14a and 14b).<br />

As outlined above, the population increase between<br />

2011 and 2017, based on minimum population targets,<br />

is 299 persons. This translates to a requirement of 180<br />

units/ households (incorporating 50% overzoning). The<br />

land requirement calculated at a density of 20 units<br />

(which is the average for the Boyle LAP <strong>area</strong>) per Ha is<br />

9 Ha.<br />

The population increase between 2017 and 2023, based<br />

on minimum population targets, is 308 persons. This<br />

translates to the requirement of 185 units / households<br />

(incorporating 50% overzoning). The land requirement<br />

calculated at a density of 20 units (which is the average<br />

for the Boyle LAP <strong>area</strong>) per Ha is 9.25 Ha.<br />

2. Capacity of Water, Drainage & Roads<br />

Infrastructure<br />

Water: The current water supply is considered adequate<br />

but the water quality needs attention. The contract<br />

documents for the provision of a Design/Build/Operate<br />

Water Treatment <strong>plan</strong>t at Rockingham Springs have<br />

been submitted to the DEHLG. The works have been<br />

included in the 2010-<strong>2012</strong> <strong>Roscommon</strong> Water Services<br />

Investment Programme (WSIP), which is currently on<br />

hold but expected to commence during the lifetime of<br />

this LAP. This will ensure that sufficient potable water<br />

is supplied to meet the commercial, industrial,<br />

residential and agricultural water needs during the LAP<br />

period.<br />

Sewerage: Of adequate capacity. The Waste Water<br />

Treatment Plant in Boyle is designed for a population<br />

equivalent (PE) of 6,000. The <strong>plan</strong>t can be increased to<br />

an ultimate design population equivalent of<br />

approximately 9,000 within the current site. Therefore,<br />

it is considered that the wastewater treatment and<br />

disposal network has sufficient capacity for the LAP<br />

period.<br />

Lands indicated at J will need to get access to the public<br />

wastewater treatment network for any development<br />

proposed on the lands.<br />

Roads: Roads infrastructure within developments will<br />

be required, possibly extensions from neighbouring<br />

estates. The provision of footpaths, street lighting and<br />

other road accommodation works will need to be<br />

provided, where necessary.<br />

Lands indicated at J will need to ensure the setting back<br />

of the boundary and possible widening of the public<br />

road in order to facilitate development.<br />

3. Supporting Infrastructure & Facilities<br />

Education: Taking into account the growth of the<br />

existing population in Boyle, and the development of<br />

approximately 172 additional households over the Plan<br />

period (21.57 acres x 8 houses per acre) it may be<br />

Boyle Local Area Plan <strong>2012</strong> – <strong>2018</strong> Page 99