Chapter 9: Urban Development<br />
or have permitted development commenced before contemplating significant development in a succeeding<br />
<strong>area</strong>.<br />
Type Term Years Area Comments<br />
Phase<br />
1<br />
Short<br />
Term<br />
1-9<br />
7.8<br />
hectares<br />
/ 19.3<br />
acres<br />
Phase 1 lands include <strong>area</strong>s north and south of Main<br />
Street (R368), which are suitable for residential<br />
development. These lands have access to the water,<br />
sewerage and the road network (see Map 8). These<br />
lands provide an opportunity to consolidate<br />
residential development and to enhance the viability<br />
and diversity of the town.<br />
Phase<br />
2<br />
Medium<br />
Term<br />
6-15<br />
9.6<br />
hectares<br />
/ 23.7<br />
acres<br />
Phase 2 lands consist of an <strong>area</strong> of land north of<br />
Main Street (R368) and east of the Carrick-on-<br />
Shannon Road (R368), which would require<br />
additional water, sewerage and roads infrastructure<br />
(see Map 8). In depth development of these lands<br />
will be considered appropriate after 70% of Phase 1<br />
lands are developed, or have development consent.<br />
Phase<br />
3<br />
Long<br />
Term<br />
12-21<br />
12.1<br />
hectares<br />
/ 30<br />
acres<br />
Table 8: Phasing within the Elphin Local Area Plan<br />
Justification of Phase 1 lands<br />
Phase 3 lands consist of three <strong>area</strong>s of land east of<br />
(see Map 8) and lands to the west of the Town Core<br />
and Phase 1 and Phase 2 zoned lands. These lands<br />
would require additional water, sewerage and roads<br />
infrastructure (see Map 8). Development of these<br />
lands will be considered appropriate after 70% of<br />
Phase 2 lands are developed or have development<br />
consent.<br />
1. Need<br />
2.<br />
Determining<br />
Factor<br />
Policy<br />
Context<br />
Assessment<br />
Population projections were calculated for the RCDP and these were utilised<br />
in the preparation of the information for the Housing Strategy. The Housing<br />
Strategy for <strong>County</strong> <strong>Roscommon</strong> provides an indicative distribution of new<br />
household formations of 100 for Elphin over the period of the Plan.<br />
In line with all policies outlined in this document.<br />
3.<br />
Capacity of<br />
Water,<br />
Drainage and<br />
Roads<br />
Infrastructure<br />
Water: Of adequate capacity (See Chapter 4)<br />
Sewerage: Existing treatment works is currently operating at near capacity<br />
and is sub-standard. The current population equivalent of the Elphin<br />
Wastewater Treatment Plant is 400 and the future Upgraded Plant design<br />
population equivalent will be 1820. Construction will commence in 2010.<br />
The expected completion date is early 2012. It is unlikely that any new<br />
large scale development will be permitted until the required Wastewater<br />
Treatment Plant upgrade is operational. The existing wastewater network<br />
has recently been rehabilitated.<br />
Elphin Local Area Plan <strong>2009</strong>-<strong>2015</strong> Page 95