Operating Oil Drum Loader - Lionel
Operating Oil Drum Loader - Lionel
Operating Oil Drum Loader - Lionel
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
WIRING PROCEDURE<br />
If the wires are not already stripped, peel the insulation from the ends of the wires. (1/4” to 3/8” is sufficient, see Figure 4).<br />
Attach the ends of the wire to the spring clip, inserting the bare wire end, and releasing the tab (See Figure 5). Spring tension<br />
assures a tight wire contact.<br />
STRIPPING THE WIRE<br />
INSERTING WIRE INTO THE<br />
SPRING CLIP<br />
FIGURE 4 FIGURE 5<br />
Figure 6 and 7 demonstrate two methods of<br />
wiring the <strong>Oil</strong> <strong>Drum</strong> <strong>Loader</strong> to your layout. Use<br />
the one that best suits your needs.<br />
FOR LIGHTS AND MOTOR TO BE CONTROLLED BY THE SLIDE SWITCH<br />
Four wires and a slide switch are supplied with<br />
this set (although only three wires will be used<br />
in this operation) and should be attached as<br />
follows: First attach one wire to one of the<br />
clips on the lockon and attach the other end to<br />
one of the slide switch terminals. Attach a second<br />
wire to the other terminal on the slide<br />
switch and connect the other end of the wire to<br />
the No. 3 spring clip on the underside of the<br />
platform. Attach the third wire to the other clip<br />
on the lockon and attach the other end of the<br />
wire to the No. 2 spring clip on the underside<br />
of the platform. Now attach the two floodlight<br />
wires to the No. 2 and No. 3 spring clips as<br />
shown. Note: The two black wires on the<br />
underside of the platform have been factory<br />
assembled to terminals 2 and 3.<br />
UNDERSIDE OF THE OIL<br />
LOADER PLATFORM<br />
1<br />
2<br />
3<br />
OPEN<br />
Floodlight Tower<br />
Wires<br />
SLIDE SWITCH<br />
FIGURE 6<br />
FOR LIGHTS ON CONTINUOUSLY AND MOTOR ACTION CONTROLLED BY THE SLIDE SWITCH.<br />
Four wires will be used in this operation. First<br />
attach one wire to one of the clips on the lockon<br />
and attach the other end to one of the slide<br />
switch terminals. Attach a second wire to the<br />
other terminal on the slide switch and connect<br />
it to the No. 3 spring clip on the underside of<br />
the platform. Attach the third wire to the other<br />
clip on the lockon and connect the other end<br />
of the wire to the No. 2 spring clip on the<br />
underside of the platform. Attach the fourth<br />
wire to the lockon as shown and attach the<br />
other end of the wire to the No. one spring<br />
clip on the underside of the platform. Now<br />
attach the two floodlight wires to the No. 1 and<br />
No. 2 spring clips as shown. Note: The two<br />
black wires on the underside of the platform<br />
have been factory assembled to terminals 2<br />
and 3.<br />
3<br />
UNDERSIDE OF THE OIL<br />
LOADER PLATFORM<br />
1<br />
2<br />
3<br />
Floodlight Tower<br />
Wires<br />
SLIDE SWITCH<br />
FIGURE 7