Operating Oil Drum Loader - Lionel
Operating Oil Drum Loader - Lionel
Operating Oil Drum Loader - Lionel
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
71-2862-250<br />
Rev. A<br />
©1994 <strong>Lionel</strong> Trains, Inc., Chesterfield, MI 48051-2493<br />
WIRING & LAMP REPLACEMENT INSTRUCTIONS<br />
OPERATING OIL DRUM LOADER<br />
Push the button and the fork lift moves below the waiting row of barrels to pick up one barrel. The fork lift then backs<br />
around the building to dump the barrel into a waiting gondola. The barrels can be loaded into any <strong>Lionel</strong> gondola. An elevated<br />
floodlight provides nighttime illumination.<br />
PARTS LIST<br />
1- <strong>Oil</strong> <strong>Drum</strong> <strong>Loader</strong> Station : 1- Forklift : 1- Forklift driver : 6 - Barrels :<br />
1- Floodlight Assembly : 1- Slide Switch : 1 - Lockon : 4- Wires<br />
FIGURE 1<br />
1
Place the platform assembly adjacent to the track as close to the train as possible without causing interference. Note: for “0”<br />
gauge layouts it may be necessary to raise the oil barrel loader approximately 1/2 “. Set the forklift loader on the platform<br />
over the outermost pin on the drive arm so that the hole on the front underside of the forklift loader engages with the pin.<br />
(See Figure 8). Figure 9 shows the position that the forklift loader should be in when the drive arm is at the edge of the platform<br />
farthest away from the barrels.<br />
FIGURE 8<br />
FORKLIFT LOADER PLACEMENT<br />
FIGURE 9<br />
Gondola<br />
OIL DRUM LOADER OPERATION<br />
Load oil drums into chute next to house. Place the forklift driver onto the forklift loader. Position the empty gondola car in<br />
front of the loading platform and sequence reversing unit in locomotive to neutral position. Adjust track voltage to approximately<br />
8 volts, usually at the lower end of most transformer voltage ranges. WARNING: Doing this for an extended period of<br />
time could damage a locomotive equipped with a smoke unit. Turn power switch on and watch the drums load into the gondola<br />
car. Turn switch off after the last barrel has been loaded. The train is now ready to deliver oil drums to their destination.<br />
MAINTENANCE PROCEDURE<br />
This unit should be maintenance free under normal operating conditions.<br />
Frequent or continuous operation may call for lubrication should the unit<br />
begin slowing down or operating erratically. Turn the unit upside down and<br />
apply one drop of machine oil to each of the 4 pivot points as shown.<br />
4 3<br />
2<br />
FIGURE 10<br />
1<br />
SERVICE<br />
This product is proudly offered by <strong>Lionel</strong> Trains, Inc. and it carries a warranty to support its continued reliable operation. You may choose to have<br />
the <strong>Lionel</strong> Service Department service your item even after its warranty expires.If so, a reasonable service fee will be charged. In either event,<br />
please follow the directions below.<br />
If service is required within the warranty period, bring the item to the nearest authorized <strong>Lionel</strong> Trains-Service Center along with the warranty<br />
card. If you prefer to send it back to the factory, you must first write to Customer Service, P.O. Box 748 New Baltimore, MI 48047-0748 stating<br />
what the item is, when it was purchased and what seems to be the problem. You will be sent a return authorization and a label to assure your<br />
merchandise will be properly handled upon receipt.<br />
CAUTION: Make sure the item is packed so as to prevent damage to the merchandise. The shipment must be prepaid and we recommend that it<br />
be insured.<br />
Please make sure you have followed the instructions carefully before returning any merchandise for service. This warranty gives you specific<br />
legal rights and you may have others that vary from state to state.<br />
4
FLOODLIGHT TOWER INSTALLATION & BULB REPLACEMENT<br />
To install the floodlight, first feed the two wires from the base of the floodlight into the middle hole on the top of the platform<br />
near the steps. (See figure 2). Next, snap the two pegs on the base of the floodlight tower into the corresponding<br />
holes on the platform. NOTE: The lights should be pointed toward the building as shown.<br />
Bulb No.<br />
00-2313-300<br />
Lamp Housing<br />
FIGURE 3<br />
To replace the floodlight bulb, first remove the<br />
lamp housing and pull the bulb straight out.<br />
Replace it with bulb No. 00-2313-300 available at<br />
your local <strong>Lionel</strong> Authorized Service Station or the<br />
<strong>Lionel</strong> Consumer Service Department.<br />
FIGURE 2<br />
After the wires are fed through the hole in the platform they must be connected to the spring clips on the underside of the<br />
platform as per one of the two methods shown in Figures 6 and 7.<br />
2
WIRING PROCEDURE<br />
If the wires are not already stripped, peel the insulation from the ends of the wires. (1/4” to 3/8” is sufficient, see Figure 4).<br />
Attach the ends of the wire to the spring clip, inserting the bare wire end, and releasing the tab (See Figure 5). Spring tension<br />
assures a tight wire contact.<br />
STRIPPING THE WIRE<br />
INSERTING WIRE INTO THE<br />
SPRING CLIP<br />
FIGURE 4 FIGURE 5<br />
Figure 6 and 7 demonstrate two methods of<br />
wiring the <strong>Oil</strong> <strong>Drum</strong> <strong>Loader</strong> to your layout. Use<br />
the one that best suits your needs.<br />
FOR LIGHTS AND MOTOR TO BE CONTROLLED BY THE SLIDE SWITCH<br />
Four wires and a slide switch are supplied with<br />
this set (although only three wires will be used<br />
in this operation) and should be attached as<br />
follows: First attach one wire to one of the<br />
clips on the lockon and attach the other end to<br />
one of the slide switch terminals. Attach a second<br />
wire to the other terminal on the slide<br />
switch and connect the other end of the wire to<br />
the No. 3 spring clip on the underside of the<br />
platform. Attach the third wire to the other clip<br />
on the lockon and attach the other end of the<br />
wire to the No. 2 spring clip on the underside<br />
of the platform. Now attach the two floodlight<br />
wires to the No. 2 and No. 3 spring clips as<br />
shown. Note: The two black wires on the<br />
underside of the platform have been factory<br />
assembled to terminals 2 and 3.<br />
UNDERSIDE OF THE OIL<br />
LOADER PLATFORM<br />
1<br />
2<br />
3<br />
OPEN<br />
Floodlight Tower<br />
Wires<br />
SLIDE SWITCH<br />
FIGURE 6<br />
FOR LIGHTS ON CONTINUOUSLY AND MOTOR ACTION CONTROLLED BY THE SLIDE SWITCH.<br />
Four wires will be used in this operation. First<br />
attach one wire to one of the clips on the lockon<br />
and attach the other end to one of the slide<br />
switch terminals. Attach a second wire to the<br />
other terminal on the slide switch and connect<br />
it to the No. 3 spring clip on the underside of<br />
the platform. Attach the third wire to the other<br />
clip on the lockon and connect the other end<br />
of the wire to the No. 2 spring clip on the<br />
underside of the platform. Attach the fourth<br />
wire to the lockon as shown and attach the<br />
other end of the wire to the No. one spring<br />
clip on the underside of the platform. Now<br />
attach the two floodlight wires to the No. 1 and<br />
No. 2 spring clips as shown. Note: The two<br />
black wires on the underside of the platform<br />
have been factory assembled to terminals 2<br />
and 3.<br />
3<br />
UNDERSIDE OF THE OIL<br />
LOADER PLATFORM<br />
1<br />
2<br />
3<br />
Floodlight Tower<br />
Wires<br />
SLIDE SWITCH<br />
FIGURE 7