13.06.2014 Views

Download - R&M Materials Handling equipment

Download - R&M Materials Handling equipment

Download - R&M Materials Handling equipment

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

R&M <strong>Materials</strong> <strong>Handling</strong>, Inc.<br />

4501 Gateway Boulevard<br />

Springfield, Ohio 45502<br />

P.: (937) 328-5100<br />

FAX: (937) 325-5319<br />

After a time delay (normally 0.3s), the delayed contact of the brake contactor opens, which disconnects the<br />

supply from terminal 3 and the rectifier changes to a half wave type. Half wave operation prevents heating of<br />

the brake coil and is enough to keep the brake open.<br />

To close the brake, the brake contactor disconnects the supply to terminals 1 and 2. The released brake<br />

contactor also opens the brake coil DC-circuit, which speeds closing of the brake. The purpose of the varistor<br />

there is overvoltage protection for K7 contacts and the brake coil.<br />

26/79<br />

This document and the information contained herein, is the exclusive property of R&M <strong>Materials</strong> <strong>Handling</strong> Inc. and represents a non-public, confidential and proprietary<br />

trade secret that may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M<br />

<strong>Materials</strong> <strong>Handling</strong> Inc. Copyright © (2005) R&M <strong>Materials</strong> <strong>Handling</strong> Inc. All rights reserved.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!