zon is further subdivided into yearly<br />

increments. Table 6A summarizes<br />

the key milestones for each <strong>of</strong> the<br />

three planning horizons.<br />

TABLE 6A<br />

<strong>Plan</strong>ning Horizon Milestone Summary<br />

<strong>Riverside</strong> <strong>Airport</strong><br />

Short Term<br />

(2012)<br />

Intermediate<br />

Term (2017)<br />

Long Term<br />

(2027)<br />

2006<br />

ANNUAL OPERATIONS<br />

Total Itinerant 42,582 51,050 57,250 73,550<br />

Total Local 41,399 48,050 52,050 61,050<br />

Subtotal Operations 83,981 99,100 109,300 134,600<br />

3% Nighttime Increase to Itinerant<br />

GA and Air Taxi Operations 1,275 1,500 1,700 2,200<br />

Total Operations 85,256 100,600 111,000 136,800<br />

BASED AIRCRAFT<br />

Single Engine 170 252 307 399<br />

Multi-Engine 22 27 33 39<br />

Turboprop 2 5 7 10<br />

Jet 1 4 8 12<br />

Helicopter/Other 7 12 15 20<br />

Total Based Aircraft 202 300 370 480<br />

Instrument Approaches (AIAs) 1,279 1,509 1,665 2,052<br />

Source: C<strong>of</strong>fman Associates Analysis<br />

A key aspect <strong>of</strong> this planning document<br />

is the use <strong>of</strong> demand-based<br />

planning milestones. The short term<br />

planning horizon contains items <strong>of</strong><br />

highest priority. These items should<br />

be considered for development based<br />

on actual demand levels within the<br />

next five years. As short term horizon<br />

activity levels are reached, it will then<br />

be time to program for the intermediate<br />

term based upon the next activity<br />

milestones. Similarly, when the intermediate<br />

term milestones are<br />

reached, it will be time to program for<br />

the long term activity milestones.<br />

Many development items included in<br />

the recommended concept will need to<br />

follow demand indicators. For example,<br />

the plan includes construction <strong>of</strong><br />

new hangar aprons and taxilanes.<br />

Based aircraft will be the indicator for<br />

additional hangar needs. If based aircraft<br />

growth occurs as projected, additional<br />

hangars should be constructed<br />

to meet the demand. Often this potential<br />

growth is tracked with a hangar<br />

waiting list.<br />

If growth slows or does not occur as<br />

forecast, some projects may be delayed.<br />

As a result, capital expenditures<br />

will be undertaken as needed,<br />

which leads to a responsible use <strong>of</strong><br />

capital assets.<br />

Some development items do not depend<br />

on demand, such as meeting design<br />

standards for various safety<br />

areas. These items should be pro-<br />

6-2