11.06.2014 Views

BEING MOBILE - Rhomberg Bau

BEING MOBILE - Rhomberg Bau

BEING MOBILE - Rhomberg Bau

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The commercial and residential property ‘Mühlehof’ will enhance the centre of the village of Uzwil and have an impact on the entire region.<br />

Revitalising the core of the village<br />

New commercial and residential property ‘Mühlehof’ in Uzwil, Canton St. Gallen, CH<br />

As the population grows, so do the requirements<br />

for infrastructure and services in a<br />

village. The population of Uzwil had to wait<br />

a long time for the revitalisation of its village<br />

centre. Having been commissioned as design and build<br />

contractor by the SIAT Fund, a Credit Suisse property fund,<br />

<strong>Rhomberg</strong> is undertaking the construction of the commercial<br />

and residential Mühlehof property in the centre of<br />

Uzwil. The new building will enhance the village centre and<br />

have a positive impact on the whole region. The Mühlehof<br />

has been designed to meet a number of needs. It includes<br />

areas for shops, restaurants, offices and apartments. Adequate<br />

parking has been provided in the underground car<br />

park.<br />

The building has been designed to be in keeping with the<br />

surrounding area. To achieve this, the building has been<br />

partly sunk into the slope of the terrain. The heart of the<br />

building complex is formed by an atrium which connects<br />

the different parts of the property and thereby unifies it.<br />

An attractive glass roof covers the shopping mall.<br />

Laying the foundation stone for the Mühlehof project as part of the<br />

revitalisation of the village centre.<br />

The first lease contracts have already been signed. Leases<br />

have been taken up by a Swiss discount supermarket, a fitness<br />

centre and two doctors surgeries. The opening of the<br />

Mühlehof has been scheduled for the end of August 2010.<br />

Philip Riklin<br />

40 NEW DIMENSIONS | RHOMBERG CONSTRUCTION SWITZERLAND

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!