CURRENT PROJECTS OF RHOMBERG<br />
RAILWAY TECHNOLOGY SWITZERLAND:<br />
SURBAUM-LANDERERSTRASSE,<br />
REINACH, SWITZERLAND<br />
Client Baselland Transport AG<br />
Constr. time From May to August 2009<br />
Contract value About 1.74 million Swiss<br />
Francs or 1.15 million Euro<br />
Packing tracks in Reinach: tracks are removed and then reconstructed over a distance<br />
of 750 m.<br />
Key facts 750 m length of track to be removed<br />
and reconstructed. A total of about 1,415 m 3<br />
of ballast is laid and foundations are laid for<br />
40 overhead line masts. One level crossing is<br />
completely changed and at a second crossing<br />
the track is moved along the stop.<br />
SEEFELDSTRASSE IN ZÜRICH,<br />
SWITZERLAND<br />
Client Consortium Seefeldstrasse<br />
Constr. time From July 2009 to Oct. 2010<br />
Contract value About 3 million SF or<br />
2 million Euro<br />
Key facts About 1,270 m of ballastless double<br />
track is overhauled. The contract involves<br />
the renewal of the base and top concrete,<br />
temporary track installations, reconstruction of<br />
the track drainage and the installation of about<br />
1,500 m of cable piping.<br />
Laying concrete in Zürich: the double track along Seefeldstrasse is overhauled over a<br />
distance of 1,270 m.<br />
FORCHSTRASSE IN ZÜRICH,<br />
SWITZERLAND<br />
Client Civil Engineering office of Zürich<br />
Contract value About 2.89 million SF<br />
or 1.91 million Euro<br />
Key facts Removal and reconstruction of a<br />
187 m long double track and 150 m long single<br />
track with turning loop (both ballastless track)<br />
as well as about 205 m traditional track with<br />
ballast.<br />
In addition, the installation of 4 track switches<br />
and construction of 10 foundation pads for<br />
overhead line masts.<br />
Installation of a total of about 730 m of cable<br />
pipe, construction of 30 inspection chambers<br />
and renewal of 460 m of overhead lines.<br />
Ballastless track in Zürich: in Forchstrasse the tracks were first removed and then<br />
reconstructed.<br />
TRACK CONSTRUCTION FROM AARAU VIA<br />
BUCHS TO SUHR, SWITZERLAND<br />
Client Canton Aargau and<br />
AAR bus+bahn<br />
Constr. time From July 2009 to June 2010<br />
Contract value About 2.3 million SF<br />
or 1.52 million Euro<br />
Key facts Installation of a total of 6,800 m of<br />
SBB I and SBB IV ballast track on concrete<br />
sleepers, and 288 m Ri 60N track on concrete<br />
sleepers. This involves the installation of about<br />
21,000 tonnes of ballast, the welding of 1,050<br />
rails, the laying of 10,075 concrete sleepers<br />
and installation of 17 track switches.<br />