Track Australia commenced as a<br />
specialist in mechanised track maintenance<br />
and has now progressed to a rail<br />
track solution provider from concept to<br />
completion and maintenance. Core<br />
competencies include services such as<br />
alignment design of ballasted and slab<br />
track including turnouts as well as<br />
technical advice and project management.<br />
In addition the company delivers<br />
all track activities involved in constructing<br />
new track and rail structures and all<br />
maintenance activities of the rail<br />
infrastructure. Experience gained in<br />
track maintenance provides useful<br />
information for asset management,<br />
which completes the cycle of comprehensive<br />
rail infrastructure optimisation.<br />
The highly motivated team supported<br />
with high-performance machines,<br />
Maintenance<br />
Construction<br />
Project<br />
Management<br />
enables Track Australia to deliver<br />
tailor-made solutions to rail infrastructure<br />
owners, recognising their specific<br />
needs for metropolitan networks, freight<br />
lines, private sidings and loops.<br />
TRACK AUSTRALIA DATA<br />
1<br />
2<br />
LOCATIONS<br />
Headquarters (1)<br />
Sydney<br />
R3 / 391 Park Road, Regents Park<br />
NSW 2143, Sydney (top picture)<br />
Regional branch (2)<br />
Hunter Valley<br />
2 / 10 Huntingdale Drive, Thornton<br />
NSW 2322, Newcastle (lower picture)<br />
Hunter Valley Yard<br />
Cnr Pitnacree Road / Forsters Lane<br />
East Maitland, NSW 2323<br />
MANAGEMENT TEAM<br />
Garry Thuer Managing Director<br />
Richard Morgan Manager Projects<br />
Shane Whitehouse Manager Resources<br />
Michael Match<br />
Manager Business Development<br />
Sabrina Vonach Support Services<br />
COMPETENCIES<br />
Concept and design Feasibility studies, detailed<br />
design, design management, technical advice<br />
Track construction Ballasted track, track slab,<br />
turnouts, continuous welded rail<br />
Track Maintenance Asset management<br />
services, inspection and certification, major<br />
periodic maintenance (MPM), resurfacing plain<br />
line track and turnouts, ballast regulating, track<br />
stabilising and management of ballast cleaning<br />
Rail Structures Rail bridges (steel, concrete,<br />
timber), culverts, level crossings, drainage<br />
Project Delivery Outcome focused design<br />
and construct solutions, rail systems interface<br />
management, site mobilisation and logistics,<br />
project management<br />
Success Story Hunter Valley<br />
Construction and maintenance of heavy haul railways<br />
Australia is renowned for its high capacity<br />
freight trains and Track Australia<br />
has not only finished the heaviest haul<br />
railway in the world on behalf of Fortescue<br />
Metals Group in Western Australia<br />
(270 km, 40 t axle load), but has also<br />
established itself to upgrade the freight<br />
network of the Hunter Valley in New<br />
South Wales. Whilst the company has<br />
been able to continually strengthen its<br />
market positioning in mechanised track<br />
maintenance (tamping, lining, stabilizing,<br />
ballast regulating), Track Australia<br />
in partnership with Delkor Rail got<br />
awarded a major periodic maintenance<br />
contract by the Australian Rail Track<br />
Corporation (ARTC) in 2008. Scope of<br />
works include work planning, project<br />
management, safety management and<br />
delivery of track activities such as resleepering,<br />
re-railing, turnout renewals,<br />
track reconditioning, etc. Most activities<br />
must be carried out in between trains<br />
in very short track possessions.<br />
Moreover, Track Australia commenced<br />
the management of ballast cleaning<br />
activities in the Hunter Valley one year<br />
ago and has delivered five projects<br />
which included all track and turnout<br />
works for constructing new and<br />
extending existing passing loops as<br />
well as several rail bridges and level<br />
crossing renewals. All projects are part<br />
of the capacity increase and upgrade<br />
programme in the Hunter Valley.<br />
Garry Thuer<br />
WORKS IN THE HUNTER VALLEY<br />
October 2008 to October 2009<br />
400 km track resurfacing, ballast regulating<br />
and stabilising<br />
23 km ballast cleaning (management)<br />
20 km re-railing incl. continuously welded rail<br />
(CWR)<br />
7.5 km re-sleepering (concrete and timber)<br />
0.5 km track reconditioning<br />
48 turnouts replaced / renewed<br />
14 level crossings constructed / overhauled<br />
5 passing loops constructed / extended<br />
5 railway bridges replaced / overhauled<br />
The Hunter Valley commences approx. 2 car<br />
hours north of Sydney and comprises 700 km<br />
of plain line track and 610 turnouts which are<br />
designed for heavy haul railway.<br />
track australia | NEW DIMENSIONS 35