11.06.2014 Views

BEING MOBILE - Rhomberg Bau

BEING MOBILE - Rhomberg Bau

BEING MOBILE - Rhomberg Bau

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

With 104 apartments and next door to the main railway station, this is one of the largest low-energy buildings in Salzburg.<br />

The Formula 1 of housebuilding<br />

The Passivhaus is also leading the field in housebuilding<br />

Years of experience and a solutionsorientated<br />

spirit of cooperation<br />

between all project participants are<br />

the tools we use today to shape the<br />

homes of tomorrow.<br />

That’s how we secure pole position<br />

in housebuilding: For more than three<br />

years now, our “racing team” has been<br />

successfully constructing multistorey<br />

residential projects to Passivhaus<br />

standards. The optimised building<br />

envelope, heat recovery from exhaust<br />

air and the passive use of solar energy<br />

reduce heating oil consumption and<br />

consequentially lower heating energy<br />

costs.<br />

This successful practical implementation<br />

has brought us expertise and<br />

experience in the field of heat-energyoptimised<br />

buildings. The low-energy<br />

residential units of the social housing<br />

organisation Salzburger Wohnbaugesellschaft<br />

right next to Salzburg<br />

main railway station have been occupied<br />

since the beginning of the year.<br />

With 104 apartments, each one with<br />

convenient dwelling ventilation, this is<br />

one of the largest low-energy buildings<br />

in Salzburg.<br />

The start of summer saw 50 Passivhaus<br />

dwellings handed over to tenants<br />

of Alpenländische Heimstätte in<br />

Bregenz. In this project, a semicentral<br />

ventilation system was used: air<br />

prewarming and heat recovery are<br />

centralised, while user-oriented air<br />

flow control is performed locally. This<br />

ensures a smooth “pit-stop” with<br />

optimised operating and maintenance<br />

costs.<br />

“Thanks to the excellent<br />

cooperation with<br />

<strong>Rhomberg</strong> <strong>Bau</strong> we<br />

were able to see our<br />

challenging projects<br />

smoothly and efficiently.”<br />

Prok. Ing. Willi Muzyczyn,<br />

Alpenländische Heimstätte<br />

On the finishing straight is Block A on<br />

the Sandgrubenweg housing estate<br />

in Bregenz, which has been built to<br />

Passiv haus standards in accordance<br />

with the Vorarlberg’s state building<br />

regulations. Here the innovative results<br />

of the research project “inkl.wohnen”<br />

were augmented with the comfort<br />

and convenience of Passivhaus living<br />

to offer an extraordinary indoor<br />

environment quality. The other blocks<br />

in Sandgrubenweg have been designed<br />

as low-energy buildings. Now<br />

the calculated energy savings can be<br />

compared to the actual consumption<br />

figures.<br />

In the Alpenländische Heimstätte<br />

project in Bregenz with its 74 housing<br />

units, we are building what is the largest<br />

residential development to Passivhaus<br />

standards currently under way<br />

in Vorarlberg. In addition to benefiting<br />

from the ventilation with heat recovery<br />

systems normally found in Passivhaus<br />

designs, residents in this development<br />

can also separately regulate the<br />

temperatures of each room through<br />

the underfloor heating using special<br />

convenience controllers.<br />

The latest technologies and continuous<br />

innovation within a strict set of<br />

rules – that does not just describe<br />

Formula 1, it also applies to building<br />

the homes of the future. And perhaps<br />

Formula 1 will accomplish something<br />

we have already achieved: dispensing<br />

with oil as a source of energy.<br />

Andreas Karg<br />

22 NEW DIMENSIONS | GENERAL CONTRACTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!