11.06.2014 Views

BEING MOBILE - Rhomberg Bau

BEING MOBILE - Rhomberg Bau

BEING MOBILE - Rhomberg Bau

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Variety on minor works sites<br />

The common denominator is craftsmanship, perfection in every detail<br />

This year, 24 skilled hands have once again shown how impressively<br />

a well-trained team can perform. The number and diversity of the<br />

projects undertaken by Herbert Zitz and his minor works team<br />

provides them plenty of variety. The flexibility and professionalism<br />

of the Dornbirn/AUT-based team is demonstrated by the numerous<br />

projects they have completed rapidly and smoothly for both private<br />

and commercial clients.<br />

Herbert Zitz<br />

GATEKEEPER’S LODGE,<br />

BREGENZ/AUT<br />

The Gatekeeper’s Lodge at Marienberg<br />

Monastery is a listed building. The<br />

chimney and cornice in the area of the<br />

roof were renovated with appropriate<br />

care and attention.<br />

BLUM BESCHLÄGE,<br />

FACTORY 7, DORNBIRN/AUT<br />

This furniture fittings manufacturer<br />

required a box culvert for flood protection<br />

at its new Factory 7 development<br />

in Satzbach. The 150 m long box section<br />

culvert formed the base for the rail<br />

connection to the Blum container store<br />

and the <strong>Rhomberg</strong> resource centre.<br />

Even intensive downpours of rain<br />

and the resultant flooding of the site<br />

could not put a brake on the team’s<br />

progress.<br />

20 NEW DIMENSIONS | MINOR WORKS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!