«byggnin» – Building Swedish style<br />

<strong>Rhomberg</strong> structural engineering teams in Sweden<br />

Since September<br />

2009, nine structural<br />

engineering workers<br />

have been living and working in<br />

Malmö , Sweden – far from their home<br />

base in Vorarlberg. The team members<br />

around foremen Jürgen Moosmann and<br />

Christoph Speckle faced challenges not<br />

just in their professional lives. All the<br />

employees spent the whole of the first<br />

month in Malmö. Then a shift system<br />

was devised which allowed the employees<br />

to take turns in spending a week<br />

with their families.<br />

Track slab FROM COPEN-<br />

HAGEN/DK TO MALMÖ/SE<br />

The professional challenge came in<br />

the form of a twelve kilometre long<br />

rail line, which must be constructed as<br />

track slab by April 2010. It will form<br />

part of the future rail link between<br />

the city centres of Copenhagen and<br />

Malmö. The teams were given a week<br />

of special training in <strong>Rhomberg</strong> Station<br />

to deal with the special demands of<br />

concreting the track slab.<br />

PERSONNEL SERVICE<br />

SUPPORTS THE STRUCTURAL<br />

ENGINEERING TEAMS IN<br />

SWEDEN<br />

Personnel Assistant Kim Grive prepared<br />

the “Swedes” with a refresher<br />

course in English sufficient for the<br />

linguistic challenge and stands by to<br />

provide help or advice to the team at<br />

any time.<br />

Reinhard Moosmann<br />

DATES & FACTS<br />

Client Banverket Produktion<br />

Quantities approx. 41 million euro<br />

Construction period September 2009 to March<br />

2010 (scheduled)<br />

Construction works 13.2 km track slab with<br />

6 turnouts (10,000 m 3 concrete), 5 km ballasted<br />

track, 6 expansion joints)<br />

Precision landing in high rise development<br />

Only 8 months for Blocks A and B in Sandgrubenweg Housing Development, Bregenz/AUT<br />

Right next door to <strong>Rhomberg</strong> headquarters<br />

in Bregenz/AUT, <strong>Rhomberg</strong><br />

specialists demonstrated to a circle of<br />

interested colleagues how to complete<br />

a construction project, perfectly and<br />

on-time. Karl Fussenegger and his<br />

team built Blocks A and B in record<br />

time. Work started in January 2009,<br />

the last touch was completed in<br />

August – and that happened despite<br />

the extraordinary challenges the architecture<br />

posed for the various tradesmen.<br />

Some interesting details: the surveying<br />

work was carried out by our<br />

new surveyor Christoph Pachoinig in<br />

agreement with the foreman to the<br />

great satisfaction of all the project<br />

participants. During the coldest part of<br />

the year, the team kept themselves fit<br />

with “healthy snacks”. Throughout the<br />

whole construction period, the hardhat<br />

policy was strictly observed by<br />

everyone present on site.<br />

Josef Boss<br />

DATES & FACTS<br />

Client <strong>Rhomberg</strong> <strong>Bau</strong> GmbH<br />

Construction period Blocks A and B<br />

January to August 2009<br />

Feature Pilot project for sustainability in multistorey<br />

residential buildings that have the qualities of detached<br />

houses<br />

Quantities 6,700 m 3 concrete, 500 tonnes steel,<br />

14,000 m 2 deck formwork, 5,000 m 2 wall formwork,<br />

2,500 m circular formwork, 25,000 manhours<br />

18 NEW DIMENSIONS | STRUCTURAL ENGINEERING