BEING MOBILE - Rhomberg Bau
BEING MOBILE - Rhomberg Bau
BEING MOBILE - Rhomberg Bau
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
The new Seeschanze<br />
Located between the lake, city and the mountains in the border triangle<br />
Impression of the new housing, at one with nature<br />
The NEW SEESCHANZE is an extraordinary project. Just<br />
as extraordinary is the collaboration of two well-known<br />
Vorarlberg construction companies. To utilise the opportunities<br />
of this unique site to the best possible advantage,<br />
Schertler-Alge and <strong>Rhomberg</strong> <strong>Bau</strong> are contributing their<br />
competence and experience to this joint project. To optimally<br />
exploit synergies, the two organisations have founded<br />
a jointly-owned company, Wohnen am See <strong>Bau</strong>träger<br />
GmbH, in which this sub-project will be implemented<br />
cooperatively. Between Bregenz and Lochau, between<br />
Lake Constance and Pfaender, between mother nature and<br />
urban infrastructure, this extraordinary residential project<br />
has an unrivalled position.<br />
The NEW SEESCHANZE blocks A to F comprise six<br />
structures that fit harmoniously into the park landscape.<br />
The offset arrangement of the blocks on the gently sloping<br />
ground was developed very carefully so that as many flats<br />
as possible have a view to the lake and the residents have<br />
as much privacy as possible. The green zones link communal<br />
and private areas. Access is via a residential road with<br />
trees and visitor parking.<br />
The ensemble planned by architects baumschlager eberle<br />
impresses with the sensitive treatment of the exceptional<br />
position and contemporary aesthetics that give the location<br />
its own identity and a unique atmosphere. During the<br />
development of the project, special attention was given<br />
to a sustainable and ecological form of construction. Low<br />
energy and operating costs are as much a matter of course<br />
as optimal support before, during and after the construction<br />
phase. Here for the first time we are using heat pumps with<br />
ground sensors for the provision of heating, combined with<br />
a solar plant for the provision of hot water.<br />
Susanne Dünser<br />
Exterior view<br />
You can obtain further<br />
information on the<br />
project from:<br />
<strong>Rhomberg</strong> <strong>Bau</strong> GmbH,<br />
Tel. +43 5574 / 403-0<br />
www.seeschanze.at<br />
info@seeschanze.at<br />
14<br />
NEW DIMENSIONS | HOUSING