11.06.2014 Views

volume 8 foreign aided project management manual contents

volume 8 foreign aided project management manual contents

volume 8 foreign aided project management manual contents

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MANAGEMENT MANUAL VOLUME 8<br />

RHD Specific Job Description – Foreign Aided Project Operations<br />

SJD/FAP/3.1 – Engineer’s Representative – PIU Roads or Bridges or PMP<br />

Foreign Aided Project Management Manual – PIU<br />

Approved:<br />

31. Oversee daily contract diary and records of plant, labour and equipment provided by the<br />

contractor;<br />

32. Review and approve 'as-built' drawings of completed structures prepared by the<br />

contractor;<br />

33. Report to the 'Engineer' for any other duties as per agreement between the ‘Employee’<br />

and ‘Engineer’s Representative’ from time to time.<br />

Issue 1 April 2005 Page 4 of 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!