MANAGEMENT MANUAL VOLUME 8<br />
RHD Specific Job Description – Foreign Aided Project Operations<br />
SJD/FAP/3.1 – Engineer’s Representative – PIU Roads or Bridges or PMP<br />
Foreign Aided Project Management Manual – PIU<br />
Approved:<br />
18. Ensure that all laboratory and field tests undertaken by the contractor are carried out in<br />
accordance with the RHD Standard Test Procedures and the required frequency as in the<br />
contract specifications;<br />
19. Ensure that the properties of pavement and embankment materials after placement are in<br />
accordance with the quality standards required by the contract through supervision of<br />
laboratory testing and in-situ testing programmes;<br />
20. Inspect records of material delivered and test results at site and off site laboratory;<br />
21. Examine and maintain monthly summary of the quality control tests and issue instructions<br />
to comply specification in respect of tests that failed;<br />
Design and Supervision<br />
22. Prepare and submit land acquisition, environmental and resettlement action plan and<br />
plans for relocation of utilities;<br />
23. Review and recommend for approval proposal for changes in designs and layouts for<br />
bridges and culverts and contractor’s proposal for boreholes for ground investigation at<br />
site of new bridges;<br />
24. Co-operate with the contractor to finalise the detailed design of bridges;<br />
25. Review and approve contractor's shop drawings, proposal for concrete mix design and pile<br />
testing;<br />
26. Ensure timely checking of contractor’s setting out for structures, reinforcing arrangement,<br />
placing of concrete, taking of samples etc.;<br />
27. Advise in the supervision of construction of works and any changes or departure from the<br />
contractual requir ement by the contractor;<br />
28. Undertake monthly measurement of the value of the works completed by the contractor<br />
and process interim and final payment certificates generated on CMS;<br />
29. Ensure checking and approval of the setting out of the works by the contractor, including<br />
survey stations, bench marks etc;<br />
30. Supervise and monitor the performance of the staff appointed for supervision and quality<br />
control works carried out by the contractor;<br />
Issue 1 April 2005 Page 3 of 4