MANAGEMENT MANUAL VOLUME 8<br />

RHD Specific Job Description – Foreign Aided Project Operations<br />

SJD/FAP/3.1 – Engineer’s Representative – PIU Roads or Bridges or PMP<br />

Foreign Aided Project Management Manual – PIU<br />

Approved:<br />

18. Ensure that all laboratory and field tests undertaken by the contractor are carried out in<br />

accordance with the RHD Standard Test Procedures and the required frequency as in the<br />

contract specifications;<br />

19. Ensure that the properties of pavement and embankment materials after placement are in<br />

accordance with the quality standards required by the contract through supervision of<br />

laboratory testing and in-situ testing programmes;<br />

20. Inspect records of material delivered and test results at site and off site laboratory;<br />

21. Examine and maintain monthly summary of the quality control tests and issue instructions<br />

to comply specification in respect of tests that failed;<br />

Design and Supervision<br />

22. Prepare and submit land acquisition, environmental and resettlement action plan and<br />

plans for relocation of utilities;<br />

23. Review and recommend for approval proposal for changes in designs and layouts for<br />

bridges and culverts and contractor’s proposal for boreholes for ground investigation at<br />

site of new bridges;<br />

24. Co-operate with the contractor to finalise the detailed design of bridges;<br />

25. Review and approve contractor's shop drawings, proposal for concrete mix design and pile<br />

testing;<br />

26. Ensure timely checking of contractor’s setting out for structures, reinforcing arrangement,<br />

placing of concrete, taking of samples etc.;<br />

27. Advise in the supervision of construction of works and any changes or departure from the<br />

contractual requir ement by the contractor;<br />

28. Undertake monthly measurement of the value of the works completed by the contractor<br />

and process interim and final payment certificates generated on CMS;<br />

29. Ensure checking and approval of the setting out of the works by the contractor, including<br />

survey stations, bench marks etc;<br />

30. Supervise and monitor the performance of the staff appointed for supervision and quality<br />

control works carried out by the contractor;<br />