MANAGEMENT MANUAL VOLUME 8<br />

RHD Specific Job Description – Foreign Aided Project Operations<br />

SJD/FAP/3.1 – Engineer’s Representative – PIU Roads or Bridges or PMP<br />

Foreign Aided Project Management Manual – PIU<br />

Approved:<br />

7. Issue site instructions, directions and orders to the contractor as authorized on behalf of<br />

the ‘Engineer’;<br />

8. Prepare and process variation orders to the contract for issue by the ‘Engineer’ or the<br />

‘Employer’;<br />

9. Advise the ‘Engineer’ on all issues affecting the contractor's approved programme, rate of<br />

progress and performance;<br />

10. Prepare evaluations and recommendations to the ‘Engineer’ on any claims or requests for<br />

extension of time submitted by the consultant or the contractor;<br />

11. Ensure that the contractor complies with the requirements of the contract in relation to the<br />

health and safety of his work force and the public, together with mitigation of social and<br />

environmental impacts;<br />

12. Overview maintaining records including its checklist, filing system for correspondence,<br />

instructions, drawings, measurements, variation orders, claims, test procedures and<br />

reports etc.;<br />

13. Provide training to RHD staff as per provisions in the <strong>project</strong> and RHD training policy;<br />

Quality Control<br />

14. Ensure that the contractor provides site laboratory in accordance with the specifications as<br />

set out in the contract, and equipped with adequate and correctly calibrated materials<br />

testing equipment;<br />

15. Ensure that the contractor has appropriate test forms for each test procedure and<br />

introduces appropriate record keeping practice that complies with the document control<br />

procedures in accordance with the Quality Assurance Plan;<br />

16. Issue order for rejection of any material or workmanship by the contractor that does not<br />

meet the requirements of the contract;<br />

17. Ensure that all materials delivered, or manufactured on site, comply with the quality<br />

standards required by the contract, through inspection of manufacturers certificates<br />

supported by supervision of on-site testing or organisation of specialist testing in an<br />

approved laboratory;<br />

Issue 1 April 2005 Page 2 of 4