MANAGEMENT MANUAL VOLUME 8<br />

RHD Specific Job Description – Foreign Aided Project Operations<br />

SJD/FAP/2.2 – Project Manager – PIU Roads or Bridges or PMP<br />

Foreign Aided Project Management Manual – PIU<br />

Approved:<br />

9. Provide <strong>project</strong> data, maps, drawing, information, reports etc. to MIS & Estates Circle for<br />

preparing database and storing in the RHD database;<br />

10. Assist Consultants and Project Director in the following:<br />

(a)<br />

(b)<br />

(c)<br />

(d)<br />

Interacting with the Circles of functional units on the unresolved issues during<br />

implementation of plan, design, drawings, construction, etc.;<br />

Submitting withdrawal applications of reimbursable <strong>project</strong> aid and final accounts;<br />

Replying to audit objections and queries on the financial matters;<br />

Monitoring performance of the <strong>project</strong> by using Central Management System;<br />

Detailed Design<br />

11. Review design, quantities, alignment details, drainage, cross-section etc. prepared by the<br />

consultants and promptly bring to the notice of the Project Director and consultant;<br />

12. Ensure interaction of the consultant with the relevant circles of the RHD technical wings in<br />

the preparation of detailed design;<br />

13. Cooperate with consultants in supplying available data for survey, investigation, analysis<br />

and design;<br />

14. Advise consultants in preparing the land acquisition and resettlement and environmental<br />

action plan, utility relocation plan and cost estimates;<br />

15. Examine and submit draft completion report of detailed design of the <strong>project</strong> and ensure<br />

concurrence of the relevant circles of the RHD headquarters wings;<br />

Implementation<br />

16. Check and process the contractors' work programme to the Project Director;<br />

17. Take over possession of land acquired for right -of-way and arrange handing over to the<br />

contractor;<br />

18. Oversee payment of compensation according to the land acquisition and resettlement<br />

action plan;<br />

19. Ensure supervision of works and quality control functions by the consultants;<br />

20. Certify mobilization advance, interim and final payment certificates of contractors and<br />

consultants, and recommend payment of local currency component;<br />

Issue 1 April 2005 Page 2 of 3