MANAGEMENT MANUAL VOLUME 8<br />
RHD Specific Job Description – Foreign Aided Project Operations<br />
SJD/FAP/2.2 – Project Manager – PIU Roads or Bridges or PMP<br />
Foreign Aided Project Management Manual – PIU<br />
Approved:<br />
9. Provide <strong>project</strong> data, maps, drawing, information, reports etc. to MIS & Estates Circle for<br />
preparing database and storing in the RHD database;<br />
10. Assist Consultants and Project Director in the following:<br />
(a)<br />
(b)<br />
(c)<br />
(d)<br />
Interacting with the Circles of functional units on the unresolved issues during<br />
implementation of plan, design, drawings, construction, etc.;<br />
Submitting withdrawal applications of reimbursable <strong>project</strong> aid and final accounts;<br />
Replying to audit objections and queries on the financial matters;<br />
Monitoring performance of the <strong>project</strong> by using Central Management System;<br />
Detailed Design<br />
11. Review design, quantities, alignment details, drainage, cross-section etc. prepared by the<br />
consultants and promptly bring to the notice of the Project Director and consultant;<br />
12. Ensure interaction of the consultant with the relevant circles of the RHD technical wings in<br />
the preparation of detailed design;<br />
13. Cooperate with consultants in supplying available data for survey, investigation, analysis<br />
and design;<br />
14. Advise consultants in preparing the land acquisition and resettlement and environmental<br />
action plan, utility relocation plan and cost estimates;<br />
15. Examine and submit draft completion report of detailed design of the <strong>project</strong> and ensure<br />
concurrence of the relevant circles of the RHD headquarters wings;<br />
Implementation<br />
16. Check and process the contractors' work programme to the Project Director;<br />
17. Take over possession of land acquired for right -of-way and arrange handing over to the<br />
contractor;<br />
18. Oversee payment of compensation according to the land acquisition and resettlement<br />
action plan;<br />
19. Ensure supervision of works and quality control functions by the consultants;<br />
20. Certify mobilization advance, interim and final payment certificates of contractors and<br />
consultants, and recommend payment of local currency component;<br />
Issue 1 April 2005 Page 2 of 3