MANAGEMENT MANUAL VOLUME 8<br />

RHD Specific Job Description – Foreign Aided Project Operations<br />

SJD/FAP/2.1 – Project Director – PIU Roads or Bridges or PMP<br />

Foreign Aided Project Management Manual – PIU<br />

Approved:<br />

4. Monitor and review monthly progress of activities of consultant and contractor‘s<br />

programme;<br />

5. Ensure effective interaction and coordination of consultants with RHD officials of the<br />

functional wings at RHD headquarters;<br />

6. Approve or process variation orders (with financial implications or quantities) and obtain<br />

concurrence of development partners;<br />

7. Approve interim or final payment certificates of consultants and process for <strong>foreign</strong><br />

currency payment by the development partners;<br />

8. Approve or process proposal of time extension for consultants and contractors and obtain<br />

concurrence of the development partners;<br />

9. Review completion report of the <strong>project</strong> submitted by the consultant and contractor;<br />

10. Prepare and submit statement of direct payment applications to CE RHD, development<br />

partners and MoC showing payments received and those remaining outstanding;<br />

11. Prepare and submit withdrawal applications for RPA for the <strong>project</strong> regularly for<br />

reimbursement by the development partners;<br />

12. Ensure that the training programme in the <strong>project</strong> are consistent with RHD training need<br />

assessment and funds are utilized through or concurrence of RHDTC;<br />

13. Ensure keeping records of all reports, design, analysis, investigations, drawings, etc.;<br />

14. Ensure supplying data to MIS & Estates Circle for preservation or preparing database;<br />

15. Ensure interaction with all the RHD headquarters functional wings and zones of RHD and<br />

other government and private agencies for collection of required data by the consultants;<br />

16. Check detailed design of all components of the <strong>project</strong> including drawings, survey, plans,<br />

details of design considerations and calculations, land acquisition plan, resettlement and<br />

environmental action plan, cost estimates, contract packaging etc.;<br />

17. Oversee preliminary works of design, quantities, costs, alignment and cross sections and<br />

take appropriate measures in time for rectifying any deficiencies, errors or short falls;<br />

18. Check and approve Quality Assurance Plan submitted by the consultant;<br />

Issue 1 April 2005 Page 2 of 4