MANAGEMENT MANUAL VOLUME 8<br />

RHD Specific Job Description – Foreign Aided Project Operations<br />

SJD/FAP/1.3 – Project Manager – PCU Roads or Bridges or PMP<br />

Foreign Aided Project Management Manual – PCU<br />

Approved:<br />

8. Cooperate with consultants for supplying available data for survey, investigation, analysis<br />

and design;<br />

9. Oversee consultant’s study, analysis, investigation, design, preparation of drawings, plans<br />

etc.;<br />

10. Recommend feasibility study components of the <strong>project</strong>;<br />

11. Obtain relevant data and information to prepare DPP and submit to the SE-Planning &<br />

Programming Circle;<br />

12. Check and submit draft or final completion report of the <strong>project</strong> by the consultants;<br />

13. Provide <strong>project</strong> data, maps, drawing, information, reports etc. to MIS & Estates Circle for<br />

preparing and storing in the database;<br />

14. Assist Superintending Engineer (Desk Officer) or Project Director and cooperate with<br />

consultants in the following:<br />

a) Interacting with the circles of functional units in RHD headquarters for preparing<br />

plan, design, drawings, construction, reports etc.;<br />

b) Preparing replies of audit objections and queries;<br />

c) Matters related to training component of the <strong>project</strong>;<br />

15. Maintain records, files, correspondences, reports, accounts, plans, drawings and<br />

measurement books etc.;<br />

16. Prepare and check ToR for detailed design prepared by the consultant;<br />

17. Appraise PD PCU or SE PCU (Desk Officer) regularly about the on-going activities of the<br />

feasibility and other study, design etc. of the <strong>project</strong>.<br />

18. Report to SE PCU for any other duties as assigned to him from time to time.<br />

Issue 1 April 2005 Page 2 of 2