MANAGEMENT MANUAL VOLUME 8<br />

RHD Specific Job Description – Foreign Aided Project Operations<br />

SJD/FAP/1.3 – Project Manager – PCU Roads or Bridges or PMP<br />

Foreign Aided Project Management Manual – PCU<br />

Approved:<br />

OFFICERS UNDER PROJECT MANAGER – PCU<br />

• Sub-Divisional Engineer (SDE)<br />

• Assistant Engineers (AE)<br />

• Sub-Assistant Engineers (SAE)<br />

PERSONNEL SPECIFICAT IONS:<br />

The post holder shall meet the general requirements of an Executive Engineer as specified in<br />

the RHD Management Manual Volume 1 as per recruitment rules. He should have worked as<br />

sub-divisional engineer for at least four years and preferably have experience in construction<br />

and maintenance <strong>management</strong> of roads or bridges.<br />

The post holder shall carryout other development functions and the duties and responsibilities<br />

under the revenue post where applicable.<br />

DUTIES AND RESPONSIBILITIES:<br />

In addition to the general responsibilities of the post of Executive Engineer as specified in the<br />

RHD Management Manual <strong>volume</strong> 1, the specific duties relating to this position are detailed<br />

below:<br />

1. Prepare RFP for appointing consultants (both <strong>foreign</strong> and local) for different stages of the<br />

<strong>project</strong>s;<br />

2. Interact with consultants and monitor tasks performed by the consultants on the study<br />

component;<br />

3. Prepare monthly accounts and statements of expenditures for the Project and submit to<br />

the Desk Officer and Chief Accounts Officer, Director-Audit and Accounts, RHD;<br />

4. Check consultants' interim and final payment certificate and submit to desk officer for<br />

approval;<br />

5. Disburse local currency components and submit copies of payment certificates to<br />

Superintending Engineer (Desk Officer) and Consultants;<br />

6. Submit final accounts and withdrawal applications of reimbursable <strong>project</strong> aid;<br />

7. Submit monthly progress reports of physical works of the <strong>project</strong>;<br />

Issue 1 April 2005 Page 1 of 2