Roads and Highways Department<br />

Volume 8 – Foreign Aided Project Management Manual<br />

Section 5 – Guidelines for Preparation of Foreign Aided Projects<br />

All tender notices shall be recorded in the RHD Tender Notice Database on the RHD website,<br />

www.rhd.gov.bd.<br />

All contract details shall be entered into the RHD Central Monitoring System.<br />

Each contract shall be prepared using the RHD Standard Schedule of Rates (latest version is on<br />

the RHD intranet). The RHD Schedule of Rates shall be used to prepare the Engineer’s<br />

Estimate. Variations shall be indicated by adding contract specific special rates. This will allow<br />

the FAP to be monitored through the RHD central monitoring system.<br />

For every <strong>project</strong>, the environmental <strong>management</strong> plan and social action plan shall form part of<br />

the contract documents. Standard RHD social and environmental <strong>management</strong> claus es shall be<br />

included as part of either the general or particular specification.<br />

Internationally competitive tendering (ICT) shall be applied for all major contracts (currently<br />

<strong>foreign</strong> <strong>aided</strong> <strong>project</strong>s) in RHD. At the time <strong>foreign</strong> donors may require particular forms of<br />

contract to be adopted for <strong>project</strong>s for which they are providing financial assistance.<br />

For all locally competitive bidding (LCB) the CPTU contract documents shall be applied. This<br />

applies to both GoB <strong>project</strong>s and funding (e.g. for periodic mai ntenance) from development<br />

partners.<br />

5.3.7 Effective Construction and Maintenance of the Works<br />

Generally FAPs should lead to cost -effective construction and maintenance of works. All<br />

physical and financial progress shall be measured and recorded in the RHD Central Monitoring<br />

System, based on monthly measurements and on -line reporting.<br />

FAPs shall utilise and comply with the RHD technical, environmental and social requirements:<br />

standards, specifications, handbooks, <strong>manual</strong>s, guidelines and design advice notes etc (except<br />

where the consultant proposes higher standards for the FAP). These documents shall be<br />

updated and redistributed through FAP, using the RHD MIS (intranet) as appropriate.<br />

Each <strong>project</strong> shall produce a Quality Assurance Plan, and all major bridge <strong>project</strong>s shall produce<br />

a Site Safety Plan prior to commencement of the works. These requirements shall be stated in<br />

the tender documents.<br />

5.3.8 MIS, Monitoring and Evaluation, Audit and Accounts<br />

The RHD Central Management System (CMS) shall be used for all FAP. The flow and<br />

disbursement of funds will be defined, as agreed between donors, to streamline the recording<br />

and monitoring of disbursement between different donor <strong>project</strong>s. The way the CMS is used will<br />

vary from <strong>project</strong> to <strong>project</strong>: a separate pr oject monitoring system will not be required. The PCUs<br />