PRINCIPAL BRIDGE INSPECTION REPORT
PRINCIPAL BRIDGE INSPECTION REPORT
PRINCIPAL BRIDGE INSPECTION REPORT
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>PRINCIPAL</strong> <strong>BRIDGE</strong> <strong>INSPECTION</strong> <strong>REPORT</strong><br />
LRP name: LRP 60B<br />
Zone: Chittagong; Circle: Chittagong; Division: Chittagong.<br />
Road No.: R-161.<br />
Road Name: Rangamati-Bandarbon Road<br />
1. Summary<br />
1.1 The principal bridge inspection of this Bandarbon Bridge was carried out by<br />
SARM – DUL Consortium on the 14 th December 2004.<br />
1.2 This was constructed in 1987.<br />
1.3 The structure is in fair condition but there is some rehabilitation work for<br />
sidewalk.<br />
2. General Information<br />
2.1 The bridge is located at chainage 60.543 Km of Rangamati-Bandarbon (R-161).<br />
This is a 166.6m long pre-stressed concrete girder bridge having 5 spans. Length<br />
of individual spans are 18.0m, 3nos. @ 42.6m and 18.0m. The width and carriage<br />
way of the bridge is respectively 9.9m and 7.4m.<br />
3. Results of inspection<br />
3.1 Foundation<br />
The foundations are supported on RCC piles. Foundation of abutments are buried<br />
and could not be visually inspected. The well foundation for the piers is also<br />
buried, so it was not possible to comment on their condition. However, there is no<br />
sign of tilting or settlement of piers.<br />
3.2 Abutment<br />
Both abutments are RCC solid type and condition is good.<br />
3.3 Pier<br />
Piers are RCC column type and in good condition.<br />
R161/LRP 060b 2004 87
3.4 Wing Walls<br />
All the wing walls are of RCC solid. These are fixed with abutments and have<br />
weep holes. They are in good condition.<br />
3.5 Bearings<br />
Bearings are neoprene bearing pads and are in good condition.<br />
3.6 Pre-stressed Concrete Girder<br />
Each Span of this bridge contains 5 nos. P.C. girders. All are in good condition.<br />
3.7 Railing<br />
The Railing is the combination of RCC Post and Rail.<br />
The overall condition of the railing is good. It has 1.0m. wide foot path at both<br />
sides.<br />
3.8 Deck Slab<br />
The condition of RCC deck slab is good.<br />
3.9 Wearing Course<br />
The wearing course is of bituminous type and is in good condition.<br />
3.10 Expansion Joint<br />
The expansion joints are in good condition<br />
3.11 Approach Protection and Drainage<br />
The bridge has no abutment approach protection and drainage facility. The bridge<br />
has drainage facility. There is minor settlement in road approach.<br />
3.12 Navigability<br />
It is navigable all the time. Most of the river traffics are different types of boats.<br />
Their heights are mostly 1.0 to 3.0m.<br />
3.13 Recommendation<br />
The following recommendations need to be followed.<br />
8.0sqm road approaches need to repair. 10.0m side walk need to repair.<br />
R161/LRP 060b 2004 88
Top View of the Bridge<br />
Side View of the Bridge<br />
R161/LRP 060b 2004 89
Approach of Bridge<br />
Another Top View of the Bridge<br />
R161/LRP 060b 2004 90