4-Laning of Dhaka-Chittagong - Roads and Highways Department
4-Laning of Dhaka-Chittagong - Roads and Highways Department 4-Laning of Dhaka-Chittagong - Roads and Highways Department
2nd Dhaka-Chittagong National Highway (Expressway) Request for Qualification Document Similar Contract No. __[insert number] of [number of similar contracts] ___ Information Description of the similarity in accordance with the above: 1. Amount __[insert amount in US$ in words and in figures]__ 2. Physical size __[insert physical size of activities]__ 3. Complexity __[insert description of complexity]__ 4. Methods/Technology __[insert specific aspects of the methods/technology involved in the contract]__ 5. Other Characteristics __[insert other characteristics as described in Section 5, Scope of Works]__ Roads and Highways Department 47
2nd Dhaka-Chittagong National Highway (Expressway) Request for Qualification Document 10.10 FORM X: HISTORICAL CONTRACT NON-PERFORMANCE [The following table shall be filled in for the Investor and for each member of a joint venture] Investor’s legal name: [insert full name] Date: [insert day, month, year] Joint venture member legal name:[insert full name] Page [insert page number] of [insert total number] pages Non-Performing Contracts Year [insert year] Non performed portion of contract [insert amount and percentage] Contract Identification Contract identification: [indicate complete contract name / number, and any other identification] Name of Employer: [insert full name] Address of Employer: [insert street / city / country] Reason(s) for non-performance: [indicate main reason(s)] Total contract amount (current value, US$ equivalent) [insert amount] Pending Litigation No pending litigation Litigation pending are specified below: Year Outcome as percent of Contract Identification total assets Total contract amount (current value, US$ equivalent) Roads and Highways Department 48
- Page 1 and 2: CONSTRUCTION OF 2ND DHAKA-CHITTAGON
- Page 3 and 4: 2nd Dhaka-Chittagong National Highw
- Page 5 and 6: 2nd Dhaka-Chittagong National Highw
- Page 7 and 8: 2nd Dhaka-Chittagong National Highw
- Page 9 and 10: 2nd Dhaka-Chittagong National Highw
- Page 11 and 12: 2nd Dhaka-Chittagong National Highw
- Page 13 and 14: 2nd Dhaka-Chittagong National Highw
- Page 15 and 16: 2nd Dhaka-Chittagong National Highw
- Page 17 and 18: 2nd Dhaka-Chittagong National Highw
- Page 19 and 20: 2nd Dhaka-Chittagong National Highw
- Page 21 and 22: 2nd Dhaka-Chittagong National Highw
- Page 23 and 24: 2nd Dhaka-Chittagong National Highw
- Page 25 and 26: 2nd Dhaka-Chittagong National Highw
- Page 27 and 28: 2nd Dhaka-Chittagong National Highw
- Page 29 and 30: 2nd Dhaka-Chittagong National Highw
- Page 31 and 32: 2nd Dhaka-Chittagong National Highw
- Page 33 and 34: 2nd Dhaka-Chittagong National Highw
- Page 35 and 36: 2nd Dhaka-Chittagong National Highw
- Page 37 and 38: 2nd Dhaka-Chittagong National Highw
- Page 39 and 40: 2nd Dhaka-Chittagong National Highw
- Page 41 and 42: 2nd Dhaka-Chittagong National Highw
- Page 43 and 44: 2nd Dhaka-Chittagong National Highw
- Page 45 and 46: 2nd Dhaka-Chittagong National Highw
- Page 47 and 48: 2nd Dhaka-Chittagong National Highw
- Page 49 and 50: 2nd Dhaka-Chittagong National Highw
- Page 51: 2nd Dhaka-Chittagong National Highw
- Page 55 and 56: 2nd Dhaka-Chittagong National Highw
- Page 57 and 58: 2nd Dhaka-Chittagong National Highw
- Page 59: 2nd Dhaka-Chittagong National Highw
2nd <strong>Dhaka</strong>-<strong>Chittagong</strong> National Highway (Expressway)<br />
Request for Qualification Document<br />
Similar Contract No. __[insert<br />
number] <strong>of</strong> [number <strong>of</strong> similar contracts]<br />
___<br />
Information<br />
Description <strong>of</strong> the similarity in<br />
accordance with the above:<br />
1. Amount __[insert amount in US$ in words <strong>and</strong> in<br />
figures]__<br />
2. Physical size __[insert physical size <strong>of</strong> activities]__<br />
3. Complexity __[insert description <strong>of</strong> complexity]__<br />
4. Methods/Technology __[insert specific aspects <strong>of</strong> the<br />
methods/technology involved in the<br />
contract]__<br />
5. Other Characteristics __[insert other characteristics as described in<br />
Section 5, Scope <strong>of</strong> Works]__<br />
<strong>Roads</strong> <strong>and</strong> <strong>Highways</strong> <strong>Department</strong> 47