11.06.2014 Views

4-Laning of Dhaka-Chittagong - Roads and Highways Department

4-Laning of Dhaka-Chittagong - Roads and Highways Department

4-Laning of Dhaka-Chittagong - Roads and Highways Department

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2nd <strong>Dhaka</strong>-<strong>Chittagong</strong> National Highway (Expressway)<br />

Request for Qualification Document<br />

10.9 FORM IX: EXPERIENCE RECORDS<br />

The Investor shall describe <strong>and</strong> provide evidence <strong>of</strong> its successful experience<br />

<strong>of</strong> raising debt <strong>and</strong> equity, reliable operating history <strong>and</strong> ownership experience<br />

in minimum 40 km access controlled highway/expressway (at grade level) <strong>and</strong>/or<br />

a minimum 20 km Elevated Expressway both having minimum 4-lane dual<br />

carriageway in accordance with Sections 9 in the following manner:<br />

(a)<br />

(b)<br />

(c)<br />

(d)<br />

(e)<br />

(f)<br />

(g)<br />

(h)<br />

(i)<br />

(j)<br />

(k)<br />

(l)<br />

Type, nature <strong>and</strong> location <strong>of</strong> the project;<br />

Product or service produced or delivered by the project;<br />

Capacity or ability <strong>of</strong> the project;<br />

Technical data/information on major equipment installed;<br />

Description <strong>of</strong> role performed by the Investor on the project;<br />

Total investment cost, financing structure, debt <strong>and</strong> equity raised for<br />

the project;<br />

Construction time for the project;<br />

Name <strong>and</strong> address <strong>of</strong> the Lead Investor including other shareholders <strong>of</strong><br />

the project;<br />

Date <strong>of</strong> commercial operation;<br />

Present status <strong>of</strong> the project;<br />

Certificate <strong>of</strong> Incorporation, <strong>and</strong> Memor<strong>and</strong>um <strong>of</strong> Association <strong>and</strong><br />

Articles <strong>of</strong> Association;<br />

Audited Financial Statements 4 (including Annual Report, if any) <strong>of</strong> the<br />

project during the time <strong>of</strong> experience asked for.<br />

In case <strong>of</strong> raising debt <strong>and</strong> equity for a project, the Investor shall also provide<br />

copies <strong>of</strong> the loan agreements <strong>and</strong> shareholders’ agreement on equity<br />

contribution in addition to the above requirements.<br />

The Investor can provide any other data <strong>and</strong> information that would assist the<br />

RHD to assess the experience <strong>and</strong> capability <strong>of</strong> the Investor.<br />

For the construction related experience the Investor shall also fill up <strong>and</strong><br />

submit Forms IX(a) <strong>and</strong> Forms IX(b).<br />

<strong>Roads</strong> <strong>and</strong> <strong>Highways</strong> <strong>Department</strong> 43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!