11.06.2014 Views

4-Laning of Dhaka-Chittagong - Roads and Highways Department

4-Laning of Dhaka-Chittagong - Roads and Highways Department

4-Laning of Dhaka-Chittagong - Roads and Highways Department

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2nd <strong>Dhaka</strong>-<strong>Chittagong</strong> National Highway (Expressway)<br />

Request for Qualification Document<br />

6.8 At the end <strong>of</strong> the concession term <strong>of</strong> 30 years, the Project Company will be<br />

required to h<strong>and</strong>over the 2nd <strong>Dhaka</strong>-<strong>Chittagong</strong> National Highway<br />

(Expressway) in Bangladesh with all facilities developed, to RHD or GoB in<br />

such condition as will be set out in the Concession Agreement <strong>and</strong> at no cost<br />

either to RHD or GoB.<br />

In addition to the above the Applicant(s) willing to be Short-Listed for<br />

Option-2 shall be required to submit proposal on the Design, Engineering,<br />

Construction, Development, Finance, Operation <strong>and</strong> Maintenance <strong>of</strong> the<br />

project following Option 2 after conducting necessary investigations <strong>and</strong><br />

study.<br />

Applicant(s) shall bear all expenses or cost incurred in preparation <strong>and</strong><br />

submission <strong>of</strong> Application for Request for Qualification (RFQ) to RHD<br />

including any further investigation or study required in connection with<br />

preparation <strong>of</strong> their proposal as per Option-1 <strong>and</strong> Option-2. RHD or GoB shall<br />

not in any way be responsible for the costs incurred by the Applicant(s).<br />

<strong>Roads</strong> <strong>and</strong> <strong>Highways</strong> <strong>Department</strong> 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!