2nd <strong>Dhaka</strong>-<strong>Chittagong</strong> National Highway (Expressway)<br />

Request for Qualification Document<br />

6 SCOPE OF WORK<br />

The Project Company will be responsible for the following activities:<br />

6.1 Preparation <strong>of</strong> phase wise plan <strong>of</strong> developing 2nd <strong>Dhaka</strong>-<strong>Chittagong</strong> National<br />

Highway (Expressway) in Bangladesh with all required facilities on the basis<br />

<strong>of</strong> ‘master plan’ or ‘layout plan’ supplied by RHD. It will include l<strong>and</strong><br />

development, construction <strong>of</strong> all required infrastructures, <strong>and</strong> other ancillaries.<br />

6.2 Carrying out <strong>of</strong> all design works <strong>and</strong> construction <strong>of</strong> 2nd <strong>Dhaka</strong>-<strong>Chittagong</strong><br />

National Highway (Expressway) in Bangladesh with all required facilities in<br />

phases <strong>and</strong> commissioning the same at its own risk but to the satisfaction <strong>of</strong><br />

RHD. The Project Company will also be responsible for ensuring that the<br />

project design <strong>and</strong> construction meet the requirements <strong>of</strong> the actual site<br />

conditions <strong>and</strong> for overall project management.<br />

6.3 Carrying out detail site survey, soil testing <strong>and</strong> environmental impact<br />

assessment studies. The Project Company will carry out the site development.<br />

The work will include site leveling <strong>and</strong> filling to the final elevation level, soil<br />

compacting.<br />

6.4 Arrangement <strong>of</strong> the necessary financing, negotiation <strong>of</strong> the Concession<br />

Agreement, construction <strong>of</strong> 2nd <strong>Dhaka</strong>-<strong>Chittagong</strong> National Highway<br />

(Expressway) in Bangladesh with all required facilities, procurement <strong>of</strong> all<br />

required equipment, <strong>and</strong> overall operation <strong>of</strong> the highway. The Project<br />

Company shall also obtain all necessary permits for importation <strong>of</strong> materials<br />

<strong>and</strong> equipment, construction <strong>of</strong> the Project <strong>and</strong> then operation <strong>of</strong> the Project in<br />

accordance with the laws, rules, regulations, orders, policies, guidelines etc. as<br />

applicable in Bangladesh.<br />

6.5 Studying <strong>and</strong> implementing measures to comply with Bangladesh<br />

environmental regulations <strong>and</strong> gender considerations, according to the<br />

principles <strong>of</strong> the government <strong>of</strong> Bangladesh <strong>and</strong> as may be applied to the<br />

project.<br />

6.6 The Project Company will be authorized to charge for his services according<br />

to the tariff mechanism [to be decided later].<br />

6.7 Undertaking any other scope <strong>of</strong> works, which will be provided in the RFP.<br />