Ensuring Sustainability in Brownfield Revitalisation as PDF

Ensuring Sustainability in Brownfield Revitalisation as PDF Ensuring Sustainability in Brownfield Revitalisation as PDF

revit.nweurope.org
from revit.nweurope.org More from this publisher
10.06.2014 Views

Environmental Profile General conditions and environmental policy aims have to be specified for the context of the building, the macrolocation, in order to be able to review and/or optimise the planning process. The aims of the macrolocation form the framework within which the building is located with its own building quality. In Tilburg, so-called ‘environmental profiles’ encompassing and describing the macrolocation in more detail are thus placed above the GPR software tool: criteria that are particularly relevant for a certain area from an environmental point of view are defined based on an environmental analysis. Experience in Tilburg has shown that it makes sense to give an area three key topics; the statutory minimum standards must be fulfilled at any rate in the other topics to be considered. For example, the use of renewable energy, increased urban greening and a greater than normal number of bicycle paths could be offered to future residents in an area. These key topics vary from area to area. With their differing individual focus, the regions therefore form a clear, attractive and diverse proposition to the future user. A matrix that is constantly updated shows the requirements for the corresponding area and summarises the environmental qualities, as shown in the following table: Quality aspects Basic quality Aim of area Actions Implementation ■ Ground Water Compilation of Classification and Political, planning Planning and technical ■ Greenery and Nature ■ External Security ■ Noise statutory minimum requirements quantification Exact specification of the qualities to be accomplished in the and technical consequences for the area consequences for the buildings (possible appraisal by GPR) ■ Air area ■ Mobility Measurable criteria ■ Spatial Use ■ Measurable Criteria The most important aims and measures for the area that is to be developed are therefore summarised on one page. In addition, best practice examples, plans and drawings illustrate the matrix and convey a clear picture to political decision-makers. 28

Aims of the GPR Trial Run in Stuttgart The GPR trial run covered the following general aspects: ■ Examining the content of the program ■ Classification in existing framework conditions, i.e. initial comparison of the required entries with German/Baden-Wuerttemberg regulations and directives ■ Examining and evaluating how user-friendly the program is Additional Stuttgart specific issues were considered: ■ Does the program offer new aspects hitherto not considered in local planning? ■ Does GPR make a more comprehensive and clearer summary of all planning requirements than the standard case used in Stuttgart? ■ Can GPR take on a role in Stuttgart? If so, which one? Data Entry Specific Procedure Architects Lehen drei tested the use of GPR over two for the days. In a preliminary meeting, administration and Trial Run in planners established framework conditions similar to an Stuttgart environmental profile and defined the documentation that was necessary for the entries. The specifications, valid final plans and the thermal insulation certificate for the building application were used as sources of information for the entries. Object The planners selected a building in Tübingen as it fits well for a comparison with the plans for the site of the freight depot at Bad Cannstatt. The building ‘Haus am Platz’ was erected between August 2003 and September 2004 in the French Quarter in Tübingen. It is integrated in an almost complete perimeter block development. A public square which forms the eastern end of the Französische Allee is in front of the building on the west side. A private inner courtyard surrounded by six buildings is located to the east. The building consists of a six-storey main building and a four-storey secondary building with a ground floor passage to the inner courtyard. It is directly built onto the fire-wall of the neighbouring building in the south. The building is freestanding on the north side. The neighbouring building is staggered in relation so that a gap is created towards the inner courtyard. Haus am Platz, Tübingen (photograph by Gudrun De Maddalena) The ‘Haus am Platz’ has seven flats with approximately 51 to 170m 2 living space as well as two business units with 51 and 28m 2 on the ground floor. The total effective area amounts to approximately 830m 2 . Access to each flat is on each floor via the stairwell with a lift. Only on the second floor are two flats located at the stairwell. The building has a cellar and there is a shared underground car park beneath a part of it. 29

Aims of the GPR Trial Run <strong>in</strong> Stuttgart<br />

The GPR trial run covered the follow<strong>in</strong>g general <strong>as</strong>pects:<br />

■ Exam<strong>in</strong><strong>in</strong>g the content of the program<br />

■ Cl<strong>as</strong>sification <strong>in</strong> exist<strong>in</strong>g framework conditions, i.e. <strong>in</strong>itial comparison of<br />

the required entries with German/Baden-Wuerttemberg regulations and<br />

directives<br />

■ Exam<strong>in</strong><strong>in</strong>g and evaluat<strong>in</strong>g how user-friendly the program is<br />

Additional Stuttgart specific issues were considered:<br />

■ Does the program offer new <strong>as</strong>pects hitherto not considered <strong>in</strong> local<br />

plann<strong>in</strong>g?<br />

■ Does GPR make a more comprehensive and clearer summary of all<br />

plann<strong>in</strong>g requirements than the standard c<strong>as</strong>e used <strong>in</strong> Stuttgart?<br />

■ Can GPR take on a role <strong>in</strong> Stuttgart? If so, which one?<br />

Data Entry<br />

Specific<br />

Procedure Architects Lehen drei tested the use of GPR over two<br />

for the days. In a prelim<strong>in</strong>ary meet<strong>in</strong>g, adm<strong>in</strong>istration and<br />

Trial Run <strong>in</strong> planners established framework conditions similar to an<br />

Stuttgart environmental profile and def<strong>in</strong>ed the documentation<br />

that w<strong>as</strong> necessary for the entries. The specifications,<br />

valid f<strong>in</strong>al plans and the thermal <strong>in</strong>sulation certificate for the build<strong>in</strong>g<br />

application were used <strong>as</strong> sources of <strong>in</strong>formation for the entries.<br />

Object<br />

The planners selected a build<strong>in</strong>g <strong>in</strong> Tüb<strong>in</strong>gen <strong>as</strong> it fits well for a comparison<br />

with the plans for the site of the freight depot at Bad Cannstatt.<br />

The build<strong>in</strong>g ‘Haus am Platz’ w<strong>as</strong> erected between August 2003 and September<br />

2004 <strong>in</strong> the French Quarter <strong>in</strong> Tüb<strong>in</strong>gen. It is <strong>in</strong>tegrated <strong>in</strong> an almost complete<br />

perimeter block development. A public square which forms the e<strong>as</strong>tern end<br />

of the Französische Allee is <strong>in</strong> front of the build<strong>in</strong>g on the west side. A<br />

private <strong>in</strong>ner courtyard surrounded by six build<strong>in</strong>gs is located to the e<strong>as</strong>t.<br />

The build<strong>in</strong>g consists of a six-storey ma<strong>in</strong> build<strong>in</strong>g and a four-storey<br />

secondary build<strong>in</strong>g with a ground floor p<strong>as</strong>sage to the <strong>in</strong>ner courtyard. It is<br />

directly built onto the fire-wall of the neighbour<strong>in</strong>g build<strong>in</strong>g <strong>in</strong> the south.<br />

The build<strong>in</strong>g is freestand<strong>in</strong>g on the north side. The neighbour<strong>in</strong>g build<strong>in</strong>g is<br />

staggered <strong>in</strong> relation so that a gap is created towards the <strong>in</strong>ner courtyard.<br />

Haus am Platz, Tüb<strong>in</strong>gen<br />

(photograph by Gudrun De Maddalena)<br />

The ‘Haus am Platz’ h<strong>as</strong> seven flats with approximately 51 to 170m 2 liv<strong>in</strong>g<br />

space <strong>as</strong> well <strong>as</strong> two bus<strong>in</strong>ess units with 51 and 28m 2 on the ground floor.<br />

The total effective area amounts to approximately 830m 2 .<br />

Access to each flat is on each floor via the stairwell with a lift. Only on the<br />

second floor are two flats located at the stairwell. The build<strong>in</strong>g h<strong>as</strong> a cellar<br />

and there is a shared underground car park beneath a part of it.<br />

29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!