Slab Pour
- Page 47 and 48: Plan View of Project PHASE 1 CONSTR
- Page 49 and 50: Cross-Section of New Structure
- Page 51 and 52: Bent Cap Design
- Page 53 and 54: Service Level Section Behavior Crit
- Page 55 and 56: Precast Connection Design
- Page 57 and 58: Cap Fabrication • Construction ac
- Page 59 and 60: Concrete Specification Requirements
- Page 61 and 62: Concrete Work Plan • Type III Por
- Page 63 and 64: 5’x5’ Connection Block Mock-Up
- Page 65 and 66: Concrete Mix Results • 8” Slump
- Page 67 and 68: Grout Mixing
- Page 69 and 70: Flow Cone Test
- Page 71 and 72: Bedding Layer Evaluation
- Page 77 and 78: Storage
- Page 79: Cap Placement
- Page 86 and 87: LP340/SH6 at IH35 Complete Prefabri
- Page 88 and 89: Construction Sequence
- Page 90 and 91: Closure Strip
- Page 92 and 93: Simulated Bearing Seats
- Page 94 and 95: Transverse Screed
- Page 96: Forming Closure Strips
- Page 104 and 105: Transportation to and Erection at B
- Page 106 and 107: STEEL BEAMS ON SINGLE COLUMN BENTS
- Page 108: Setting Prefabricated Column Shell
- Page 112: Casting Concrete Core
- Page 119 and 120: Dry Creek Bridge
- Page 122: Thank You Lloyd M. Wolf, PE lwolf@d