Texas DOT Experience with Prefabricated Bridge ... - MCEER
Texas DOT Experience with Prefabricated Bridge ... - MCEER Texas DOT Experience with Prefabricated Bridge ... - MCEER
09.06.2014
Views
On the Right Track
- Page 29: Bolted Connection • Technique - d
- Page 32 and 33: Serviceability Guidelines • beddi
- Page 34 and 35: Connection Details • min. connect
- Page 36 and 37: Research Report 1748-2 • Contains
- Page 39: Lake Ray Hubbard Precast Caps Rockw
- Page 47 and 48: Plan View of Project PHASE 1 CONSTR
- Page 49 and 50: Cross-Section of New Structure
- Page 51 and 52: Bent Cap Design
- Page 53 and 54: Service Level Section Behavior Crit
- Page 55 and 56: Precast Connection Design
- Page 57 and 58: Cap Fabrication • Construction ac
- Page 59 and 60: Concrete Specification Requirements
- Page 61 and 62: Concrete Work Plan • Type III Por
- Page 63 and 64: 5’x5’ Connection Block Mock-Up
- Page 65 and 66: Concrete Mix Results • 8” Slump
- Page 67 and 68: Grout Mixing
- Page 69 and 70: Flow Cone Test
- Page 71 and 72: Bedding Layer Evaluation
- Page 77 and 78: Storage
- Page 79: Cap Placement
- Page 87 and 88: Typical Superstructure and Interior
- Page 89 and 90: Pretopped Steel Tub Girder 38 in de
- Page 91 and 92: LP340/SH6 at IH-35 Prefabricated Co
- Page 93 and 94: Pre-topped Slab
- Page 95 and 96: Reinforcing Steel Placement
- Page 99: Slab Pour
- Page 104 and 105: Transportation to and Erection at B
- Page 106 and 107: STEEL BEAMS ON SINGLE COLUMN BENTS
- Page 108: Setting Prefabricated Column Shell
- Page 112: Casting Concrete Core
- Page 119 and 120: Dry Creek Bridge
- Page 122: Thank You Lloyd M. Wolf, PE lwolf@d
On the Right Track