Texas DOT Experience with Prefabricated Bridge ... - MCEER

Texas DOT Experience with Prefabricated Bridge ... - MCEER Texas DOT Experience with Prefabricated Bridge ... - MCEER

mceer.buffalo.edu
from mceer.buffalo.edu More from this publisher
09.06.2014 Views

Fabricator Concrete Requirements • Workable Concrete, 7 1/2” to 8” Slump • High-Early Strengths • Rotate the Casting Bed within 24 hours

Concrete Work Plan • Type III Portland Cement- 6 sacks/ CY • Class C Fly Ash - 20% Replacement • Grade I River Sand • Grade 5 Crushed Limestone - CA Factor 0.81 • Water Cement Ratio - 4.0 gal/sack • Air Entrainment, Water Reducing and Retarding Agents used.

Concrete Work Plan<br />

• Type III Portland Cement- 6 sacks/ CY<br />

• Class C Fly Ash - 20% Replacement<br />

• Grade I River Sand<br />

• Grade 5 Crushed Limestone - CA Factor<br />

0.81<br />

• Water Cement Ratio - 4.0 gal/sack<br />

• Air Entrainment, Water Reducing and<br />

Retarding Agents used.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!