09.06.2014 Views

Texas DOT Experience with Prefabricated Bridge ... - MCEER

Texas DOT Experience with Prefabricated Bridge ... - MCEER

Texas DOT Experience with Prefabricated Bridge ... - MCEER

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Research Project 4176<br />

“Development of Precast <strong>Bridge</strong> Construction<br />

Systems” – Report to be Published 3-2006<br />

• Investigation of:<br />

– Metal vs Plastic Ducts (25% Cap. Reduction)<br />

– Misplaced Connectors in Ducts (Off Center –<br />

20% Cap. Reduction)<br />

– Connector Embedment Depth<br />

• Availability<br />

– Center for Transportation Research Library<br />

• Phone 512-232-3126<br />

• ctrlib@utexas.edu

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!