Texas DOT Experience with Prefabricated Bridge ... - MCEER
Texas DOT Experience with Prefabricated Bridge ... - MCEER Texas DOT Experience with Prefabricated Bridge ... - MCEER
09.06.2014
Views
Pierce Elevated Freeway Bridge Replacement IH 45 Downtown Houston, TX (1997)
“Bolted” Connection
- Page 1: Texas DOT Experience with Prefabric
- Page 7 and 8: Benefits of Prefabricated Construct
- Page 10 and 11: Redfish Bay Precast Caps Nueces Cou
- Page 20: Pierce Elevated • Precast deck pa
- Page 25 and 26: Sponsored Research •Various conne
- Page 27 and 28: Grout Pockets • Technique - preca
- Page 29: Bolted Connection • Technique - d
- Page 32 and 33: Serviceability Guidelines • beddi
- Page 34 and 35: Connection Details • min. connect
- Page 36 and 37: Research Report 1748-2 • Contains
- Page 39: Lake Ray Hubbard Precast Caps Rockw
- Page 47 and 48: Plan View of Project PHASE 1 CONSTR
- Page 49 and 50: Cross-Section of New Structure
- Page 51 and 52: Bent Cap Design
- Page 53 and 54: Service Level Section Behavior Crit
- Page 55 and 56: Precast Connection Design
- Page 57 and 58: Cap Fabrication • Construction ac
- Page 59 and 60: Concrete Specification Requirements
- Page 61 and 62: Concrete Work Plan • Type III Por
“Bolted”<br />
Connection