Texas DOT Experience with Prefabricated Bridge ... - MCEER
Texas DOT Experience with Prefabricated Bridge ... - MCEER Texas DOT Experience with Prefabricated Bridge ... - MCEER
09.06.2014
Views
Setting Prefabricated Column Shell
- Page 57 and 58: Cap Fabrication • Construction ac
- Page 59 and 60: Concrete Specification Requirements
- Page 61 and 62: Concrete Work Plan • Type III Por
- Page 63 and 64: 5’x5’ Connection Block Mock-Up
- Page 65 and 66: Concrete Mix Results • 8” Slump
- Page 67 and 68: Grout Mixing
- Page 69 and 70: Flow Cone Test
- Page 71 and 72: Bedding Layer Evaluation
- Page 77 and 78: Storage
- Page 79: Cap Placement
- Page 86 and 87: LP340/SH6 at IH35 Complete Prefabri
- Page 88 and 89: Construction Sequence
- Page 90 and 91: Closure Strip
- Page 92 and 93: Simulated Bearing Seats
- Page 94 and 95: Transverse Screed
- Page 96: Forming Closure Strips
- Page 102: Remove Form
- Page 105 and 106: Research Project 4122 “Developmen
- Page 107: Prefabricated Columns
- Page 112: Casting Concrete Core
- Page 119 and 120: Dry Creek Bridge
- Page 122: Thank You Lloyd M. Wolf, PE lwolf@d
Setting <strong>Prefabricated</strong> Column Shell