9965244 Operator Instruction Collection Tray en - Ernst Nagel GmbH

9965244 Operator Instruction Collection Tray en - Ernst Nagel GmbH 9965244 Operator Instruction Collection Tray en - Ernst Nagel GmbH

<strong>Collection</strong> <strong>Tray</strong><br />

User Manual<br />

ENGLISH


Cont<strong>en</strong>ts<br />

1 Safety information ........................................................................................................ 3<br />

2 Int<strong>en</strong>ded use and possible combinations ..................................................................... 4<br />

3 Operating the collection tray......................................................................................... 5<br />

4 M<strong>en</strong>u table, control box of the collection tray ............................................................... 6<br />

5 Setting the operating mode .......................................................................................... 7<br />

6 Setting the sheet size................................................................................................... 8<br />

7 Adjusting the sheet retainers........................................................................................ 9<br />

8 Adjusting the pressing roller in the Foldnak ............................................................... 10<br />

9 Adjusting the suction power ....................................................................................... 10<br />

10 Error messages.......................................................................................................... 11<br />

11 Installation of the collection tray ................................................................................. 12<br />

DECLARATION OF CONFORMITY.................................................................................. 23<br />

© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.2


1 Safety information<br />

1. Read the operating manual carefully and completely before starting up the unit.<br />

2. Make sure the mains connection has the correct voltage and is grounded before starting up the<br />

unit.<br />

3. Repairs may only be performed by trained <strong>Nagel</strong> v<strong>en</strong>dors and service <strong>en</strong>gineers.<br />

4. Disconnect the unit's power cable from the mains before repairs.<br />

5. Install cables so that they do not repres<strong>en</strong>t a tripping hazard.<br />

6. Use only original <strong>Nagel</strong> spare parts.<br />

7. Install the unit in a dry room on a level surface.<br />

8. Lock the castors once the unit is in place.<br />

9. Safety covers that prev<strong>en</strong>t operators from reaching into the machine must always be in place.<br />

10. Safety devices may not be removed or bypassed.<br />

11. Be sure to use the same rating wh<strong>en</strong> replacing fuses.<br />

12. Keep long hair away from rotating shafts and rollers.<br />

13. Guide covers during closing to prev<strong>en</strong>t them falling shut.<br />

14. Do not op<strong>en</strong> the cover during operation, as this may cause a paper jam.<br />

15. Connect the various units using the screws provided so that the units cannot be separated<br />

without tools.<br />

16. Switch off the main switch before reaching into the machine.<br />

© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.3


2 Int<strong>en</strong>ded use and possible combinations<br />

The collection tray is a link betwe<strong>en</strong> the Robo-Feeder or S8 feeder and the Foldnak Compact,<br />

Foldnak 8 or Foldnak 40 bookletmakers.<br />

Sets of up to 25 sheets (80 gsm) that are separated by the collators are collected, jogged and fed<br />

to the Foldnak as complete sets.<br />

A complete, unseparated set of up to 8 sheets from the S8 can also be fed to the Foldnak via the<br />

collection tray.<br />

The collection tray cannot be combined with an S8 two- or three-tower system!<br />

The collection tray can also be used together with an older Foldnak from serial number 00114542<br />

onwards. In this case, the Foldnak must be equipped with an online box 2413036.<br />

Units with serial numbers betwe<strong>en</strong> 97000000 and 00114542 require retrofit kit 2955735 in addition.<br />

Control box 2656020 is required if the collection tray is to be operated with a Foldnak 8 /<br />

Foldnak 40 or a Foldnak Compact 2655000 without membrane keyboard.<br />

The control box is not needed to operate the collection tray with a Foldnak Compact 2655010 with<br />

membrane keyboard. The standard online box is suffici<strong>en</strong>t for all versions of the Foldnak Compact.<br />

© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.4


3 Operating the collection tray<br />

The collection tray is controlled via the membrane keyboard of the control box or of the Foldnak<br />

Compact. The following describes the operation via the control box. The control via the Foldnak<br />

Compact is basically the same; only the m<strong>en</strong>u structure is differ<strong>en</strong>t - see the user manual of the<br />

Foldnak Compact.<br />

Overview of control elem<strong>en</strong>ts<br />

Main switch<br />

Welcome !!!<br />

FK XXX<br />

RF 0000<br />

<strong>Collection</strong> <strong>Tray</strong><br />

Main m<strong>en</strong>u 0<br />

<strong>Collection</strong> tray<br />

Status<br />

LED<br />

Display<br />

Back key<br />

Up /<br />

Down<br />

keys<br />

Enter key<br />

Function keys<br />

Wh<strong>en</strong> the control box is switched on, the display briefly shows the software version (XXX stands<br />

for the version number).<br />

Once the unit is powered up, the operating mode and counter reading are displayed in the upper<br />

line.<br />

Press the Enter key to op<strong>en</strong> the main m<strong>en</strong>u.<br />

The upper line always shows the superordinate m<strong>en</strong>u item, the lower line the subordinate m<strong>en</strong>u<br />

item.<br />

The table below shows an overview of the m<strong>en</strong>u structure.<br />

Use the Up / Down keys to navigate betwe<strong>en</strong> subm<strong>en</strong>u items.<br />

Use the Back key to return to the next higher m<strong>en</strong>u level.<br />

This corresponds to the next column on the left in the table.<br />

The control system "remembers" the last path through the m<strong>en</strong>u to make repeat adjustm<strong>en</strong>ts<br />

easier. Press the Enter key several times to return to the previously displayed subm<strong>en</strong>u.<br />

© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.5


4 M<strong>en</strong>u table, control box of the collection tray<br />

Main m<strong>en</strong>u 1st subm<strong>en</strong>u 2nd subm<strong>en</strong>u 3rd subm<strong>en</strong>u<br />

0 Counter 00 Delete 0a Sure?<br />

01 Preselection 0000<br />

1 Operating mode 1a S8<br />

1b Robo-Feeder<br />

2 Settings 20 Language 20a English<br />

20b German<br />

20c Fr<strong>en</strong>ch<br />

20d Spanish<br />

20e Dutch<br />

20f Italian<br />

20g Russian<br />

20h Czech<br />

3 Speed 30 low<br />

31 medium<br />

32 high<br />

21 Service 21a Total Counter 000000000<br />

21b Actuators FAN BRIDGE<br />

A 08<br />

FAN<br />

SICK O-BOX OUT<br />

ERROR OUT<br />

A 04<br />

VCC_OBOX<br />

HEFTSIG / ERROR<br />

START_OBOX<br />

SOLENOID COLLT<br />

FINGER BACKWARD<br />

FINGER FORWARD<br />

ENDURANCE RUN<br />

GREEN LED<br />

ERROR LED<br />

RELAY 2<br />

RELAY 1<br />

A12<br />

A11<br />

BLUE LED<br />

21c S<strong>en</strong>sors E 00<br />

E 28<br />

E 27<br />

DOOR CONTACT<br />

COLLTRAY INPUT<br />

REF_FINGER<br />

E 23<br />

E 22<br />

E 21<br />

E 20<br />

BUTTON 8 - 1<br />

AUX LS OBOX FK<br />

AUX FK ERROR<br />

E 09<br />

AUX TR ERROR<br />

E 07<br />

E 06<br />

AUX S8 ERROR<br />

AUX S8 START<br />

E 03 - 01<br />

21d Teach Point<br />

21e More FK Compact<br />

4 Run 4a Booklet<br />

4b Clear collecting station<br />

5 <strong>Collection</strong> tray 5a Suction power 00<br />

5b Edit 000.0<br />

5c Teach in ± 000.0<br />

© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.6


5 Setting the operating mode<br />

Select subm<strong>en</strong>u 1 Operating mode and press the Enter key.<br />

Operating mode 1a<br />

S8 �<br />

In this window, the selected operating mode is checkmarked.<br />

Select the collator connected to the collection tray with the Up / Down keys and press the Enter<br />

key.<br />

Press the Back key three times to return to the display window below. The operating mode is<br />

shown on the upper left.<br />

S8 0000<br />

<strong>Collection</strong> <strong>Tray</strong><br />

PLEASE NOTE!<br />

The control system of the collection tray must be "told" during installation with which Foldnak it is<br />

used!<br />

To do this, select m<strong>en</strong>u item 21e More in the Service m<strong>en</strong>u (the password for the service functions<br />

is 1000) and press the Enter key.<br />

More<br />

FK Compact �<br />

"Fk Compact" must be checkmarked if a Foldnak Compact 2655000 without membrane<br />

keyboard is installed; in all other cases, there must be no checkmark!<br />

Assignm<strong>en</strong>t of function keys<br />

The function keys F1, F2 and F3 are assigned the following functions at the time of delivery:<br />

F1 = Clear Foldnak with stapling<br />

F2 = Clear collection tray (the set is pushed into the Foldnak and processed)<br />

F3 = Suction power<br />

A function key can be assigned any function from the m<strong>en</strong>u tree. Select the desired subm<strong>en</strong>u item<br />

with the control keys, th<strong>en</strong> keep the appropriate function key pressed for more than three seconds.<br />

The display shows the message "Function key saved".<br />

The labelling of the function keys may be changed by trained personnel.<br />

© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.7


6 Setting the sheet size<br />

Manual input of sheet l<strong>en</strong>gth<br />

Select subm<strong>en</strong>u 5c Teach in.<br />

Please note! The adjustable side stop moves to the jogging position.<br />

Raise the sheet retainers.<br />

<strong>Collection</strong> tray 5c<br />

Teach in ± XXX.X<br />

XXX.X<br />

This window shows the read-out position of the transport finger as sheet l<strong>en</strong>gth in millimetres<br />

(distance betwe<strong>en</strong> transport finger and rear cross stop).<br />

Push the transport finger toward the Foldnak.<br />

Insert a sheet of paper of the same size as the sets to be processed.<br />

Loos<strong>en</strong> the wing screw behind the handwheel and adjust the lateral guides to the sheet width. Do<br />

not move the guides too close together to avoid jamming the set! You must be able to move the set<br />

easily in the direction of paper travel.<br />

Tight<strong>en</strong> the wing screw to lock the stops in this position.<br />

Place the sheet against the rear cross stop and move the transport finger to the right until it just<br />

touches the lead edge of the sheet.<br />

The display now shows the "taught" value.<br />

Press the Enter key until the display shows the message "Setting saved!!!"<br />

Numeric input of sheet l<strong>en</strong>gth<br />

Select subm<strong>en</strong>u 5b Edit.<br />

Please note! The adjustable side stop moves to the jogging position.<br />

<strong>Collection</strong> tray 5b<br />

Edit XXX.X<br />

In this window, you can <strong>en</strong>ter the numerical value of the sheet l<strong>en</strong>gth in millimetres.<br />

Use the Back and Enter keys to select a digit (the selected digit is underlined). Change the numerical<br />

value of the selected digit with the Up / Down keys.<br />

Once the last digit has be<strong>en</strong> selected, the input value is saved and the transport finger moves to<br />

the start position. Another push of the Enter key takes you back to the subm<strong>en</strong>u; if necessary, you<br />

can correct the value as described above. Adjust the lateral guides as described above.<br />

Make sure the set sheet l<strong>en</strong>gth matches the actual sheet l<strong>en</strong>gth, otherwise the set may be<br />

jammed!<br />

© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.8


7 Adjusting the sheet retainers<br />

Once you have loos<strong>en</strong>ed the clamping screw, the sheet retainers can be moved on the bars.<br />

The right-hand sheet retainer should be adjusted so that its lower b<strong>en</strong>d is positioned approx. 1-2<br />

cm to the right of the transport finger (home position).<br />

Adjust the left-hand sheet retainer so that the set does not become caught on the rolls of the lateral<br />

guides wh<strong>en</strong> it is pushed out. If extra-long sheet sizes are processed, the left-hand sheet retainer<br />

can be removed altogether.<br />

Adjusting the sheet retainers; the left lateral stop is not shown<br />

Adjusting the sheet retainer rolls<br />

Adjust the sheet retainer rolls to a distance from the table that corresponds to twice the thickness<br />

of the set (e.g. place a booklet underneath the rolls). The fast<strong>en</strong>ing screws should be so tight that<br />

the rolls cannot go out of adjustm<strong>en</strong>t on their own.<br />

© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.9


8 Adjusting the pressing roller in the Foldnak<br />

The pressing roller in the Foldnak must be adjusted so that it rests on the part of the online box<br />

strap that is supported by a counter-roller on the other side.<br />

Wh<strong>en</strong> the online box is adjusted to a differ<strong>en</strong>t sheet size, this roller must be moved accordingly; it<br />

must always be directly opposite the support roller.<br />

9 Adjusting the suction power<br />

The sheets fed into the unit are supported on an air cushion and desc<strong>en</strong>d slowly as the air escapes.<br />

There are two fans in the rear cross stop. These fans suck off the air and accelerate the desc<strong>en</strong>t of<br />

the sheets.<br />

Select subm<strong>en</strong>u 5a Suction power.<br />

<strong>Collection</strong> tray 5a<br />

Suction power XX<br />

In this window, you can change the suction power of the fans. The power can be set in steps<br />

betwe<strong>en</strong> 0 (no suction) and 10 (maximum suction). If a value greater than 10 is <strong>en</strong>tered, only the<br />

maximum value of 10 is saved.<br />

The suction power must be optimised according to the weight and size of the sheets to be processed.<br />

If the suction is set too high, a sheet may be pulled against the cross stop and cover the air slots.<br />

The following sheets are supported on the air cushion that is no longer sucked off and cause a<br />

paper jam.<br />

The arriving sheet should not desc<strong>en</strong>d until its lead edge has almost reached the transport finger.<br />

Paper with static charges in particular may turn over if the suction is too strong – it may touch the<br />

lower sheets of the set too soon and stick to them.<br />

If the suction is too low, the sheet desc<strong>en</strong>ds too slowly and the following sheet can become caught<br />

at its tail edge.<br />

© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.10


10 Error messages<br />

In the ev<strong>en</strong>t of a malfunction, the following messages are displayed. Once the malfunction has<br />

be<strong>en</strong> eliminated, every error message must be acknowledged with the Back key.<br />

Paper jam<br />

FK infeed<br />

ERROR<br />

Home position<br />

ERROR<br />

Trimmer<br />

DOOR<br />

OPEN<br />

SEE<br />

--------><br />

ERROR<br />


11 Installation of the collection tray<br />

PLEASE NOTE!<br />

For a joint operation with the collection tray, the door at the Robo-Feeder or at the S8 must<br />

be replaced:<br />

2656170 door RF - collection tray<br />

2656171 door S8 - collection tray<br />

The sheet deflector must also be changed!<br />

Installing the 2761165 sheet deflector for the collection tray:<br />

Take off the cover of the Robo-Feeder / S8, dismount the transfer plate and the deflector adjustm<strong>en</strong>t<br />

motor (if installed), unscrew the All<strong>en</strong> screw (see long thin arrow) and take off the deflector.<br />

If an ultrasonic s<strong>en</strong>sor (order no. 2761006) for the external double sheet detector is installed, it<br />

is mounted to the new deflector.<br />

Mount the new deflector in the reverse order.<br />

Remove the original door. Do not mount the new door yet, see page 14.<br />

Replace the two inner fillister head screws at the base of the Robo-Feeder / S8 with two DIN 912<br />

M6x25 All<strong>en</strong> screws. Allow the screws to project by approx. 6 mm!<br />

© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.12


Mounting the support frame to the collection tray<br />

Loos<strong>en</strong> the two All<strong>en</strong> screws at the underside of the collection tray and use them to fast<strong>en</strong> the<br />

support.<br />

© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.13


Fitting the collection tray<br />

Fit the keyhole-shaped recesses of the collection tray onto the All<strong>en</strong> screws at the Robo-Feeder /<br />

S8 base. Level the collection tray using the adjusting feet. Mount the new door at the Robo-Feeder<br />

/ S8.<br />

Th<strong>en</strong> mount the<br />

2656170 door RF - collection tray /<br />

2656171 door S8 - collection tray.<br />

Connecting the Foldnak to the support frame<br />

Connect the Foldnak to the support frame with the angle iron (2760509 connection S8 / Fk) and<br />

secure the connection with the screws provided. The screws must be only hand-tight!<br />

© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.14


Plugging the cable into the collection tray<br />

Secure the cable using the screws at the plug.<br />

Installing the control box<br />

Plug connections: see image. Secure the plugs with the screws!<br />

Online box / Foldnak Compact 2655010<br />

<strong>Collection</strong> tray<br />

Service<br />

Robo-Feeder /<br />

S8<br />

� Fk Compact 2655010<br />

or control box<br />

© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.15


Mounting the control box to the collection tray<br />

Unscrew the 4 All<strong>en</strong> screws at the collection tray by approx. 5 mm.<br />

Fit the control box at the keyholes and tight<strong>en</strong> the screws.<br />

Fitting the panels<br />

PLEASE NOTE!<br />

The panels can only be fitted to the new Robo-Feeder / S8 support (dark grey)!<br />

Screw the DIN 912 M6x25 All<strong>en</strong> screws and rubber bushings into the support frame and into the<br />

Robo-Feeder / S8 support.<br />

The panels are symmetrical; if no control box is installed<br />

mount the panel with the recess pointing down.<br />

© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.16


Installing the pressing roller and infeed plate in the Foldnak<br />

For a joint operation with the collection tray, the short infeed plate at the Foldnak must be replaced<br />

with the longer 2955989 infeed plate Fk-8. The infeed roller for the online box is replaced by the<br />

2656177 pressing roller.<br />

The pressing roller must be adjusted so that it rests on the part of the online box strap that is<br />

supported by a counter-roller on the other side.<br />

Wh<strong>en</strong> the online box is adjusted to a differ<strong>en</strong>t sheet size, this roller must be moved accordingly; it<br />

must always be directly opposite the support roller.<br />

© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.17


© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.18


© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.19


© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.20


Changes<br />

© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.21


Notes<br />

© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.22


Wir/ We/ Nous: <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong><br />

Breitwies<strong>en</strong>str. 21<br />

70565 Stuttgart<br />

Germany<br />

erklär<strong>en</strong> in alleiniger Verantwortung, dass das Produkt/<br />

declare under our sole responsibility that the product/<br />

déclarons sous notre seule responsabilité que le produit<br />

KONFORMITÄTSERKLÄRUNG<br />

DECLARATION OF CONFORMITY<br />

DÉCLARATION DE CONFORMITÉ<br />

Sammelbrücke<br />

<strong>Collection</strong> <strong>Tray</strong><br />

Pont d'assemblage<br />

auf das sich diese Erklärung bezieht, in Übereinstimmung ist mit d<strong>en</strong> Bestimmung<strong>en</strong><br />

der EU Richtlini<strong>en</strong>/<br />

to which this declaration relates is in conformity with the ess<strong>en</strong>tial requirem<strong>en</strong>ts of<br />

EU directives/<br />

auquel se réfère cette déclaration est <strong>en</strong> conformité avec les exig<strong>en</strong>ces ess<strong>en</strong>tielles<br />

des directives de la communauté europé<strong>en</strong>ne<br />

2006/42/EEC und Änderung<strong>en</strong>/ and am<strong>en</strong>dm<strong>en</strong>ts/ et am<strong>en</strong>dem<strong>en</strong>ts<br />

2006/95/EEC und Änderung<strong>en</strong>/ and am<strong>en</strong>dm<strong>en</strong>ts/ et am<strong>en</strong>dem<strong>en</strong>ts<br />

2004/108/EEC und Änderung<strong>en</strong>/ and am<strong>en</strong>dm<strong>en</strong>ts/ et am<strong>en</strong>dem<strong>en</strong>ts<br />

unter Anw<strong>en</strong>dung der folg<strong>en</strong>d<strong>en</strong> harmonisiert<strong>en</strong> Norm<strong>en</strong>/<br />

by applying the following harmonized standards/<br />

<strong>en</strong> appliquant les normes harmonisées suivantes<br />

EN 1010 10.99<br />

Jahr der Anbringung der CE- K<strong>en</strong>nzeichnung/<br />

Year of affixing the CE marking/<br />

Année d'application de la marque CE : 2011<br />

Stuttgart, 2 nd February 2011<br />

Stuttgart, le 2 février 2011<br />

Ort und Datum/ Geschäftsführer/<br />

Place and date/ Managing Director /<br />

Lieu et date Gérant<br />

© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.23


<strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong><br />

D - 70565 Stuttgart, Germany<br />

Domestic 0711 78078 11<br />

Export +49711 78078 21<br />

Telefax +49711 78078 10<br />

www.ernstnagel.com<br />

© <strong>Ernst</strong> <strong>Nagel</strong> <strong>GmbH</strong> <strong>9965244</strong> Bedi<strong>en</strong>ungsanleitung Sammelbrücke <strong>en</strong>.doc 03.02.2011 p.24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!