-106- A Budgetary Analysis of Cadre Wartime LWAM Data (% of deployments) Table A.7—AC Stress Calculations for CadreMix Force Dwell Time 12 16 20 24+ 18% 12% 22% 49% Calculation 0.33*0.18 0.33*0.12 0.33*0.22 0.33*0.49 + 0.66 % Long Term Deployments 6% 4% 7% 83% We calculate long-term stress on the AC in the same manner for all other forces analyzed in this paper. A.5—CADRE COST SAVINGS RELATIVE TO BASELINE In Section 2.4, we calculated the peacetime and average long-run cost savings from cadre relative to the corresponding non-cadre forces that could sustain the same size rotation. Figure A.2 shows how these calculations were performed. Figure A.2—Relative Cadre Cost Savings Calculations AC BCTs RC BCTs Cadre BCTs Peacetime Cost Average Long Run Cost +6 48 28 Baseine Forces 0 $60 billion $62 billion +9 51 28 0 $64 billion $65 billion +18 60 28 0 $73 billion $74 billion CadreMix 48 28 0 $60 billion $62 billion +6 42 28 Cadre Forces 6 $55 billion $58 billion +9 42 28 9 $56 billion $59 billion +18 42 28 18 $57 billion $62 billion CadreMix 35 19 16 $47 billion $51 billion Difference +6 -6 0 +6 -$5 billion -$4 billion +9 -9 0 +9 -$8 billion -$6 billion +18 -18 0 +18 -$16 billion -$12 billion CadreMix -13 -9 +16 -$13 billion -$11 billion Cadre Difference Relaitve to Baseline +6 -13% 0% - 9% 6% +9 -18% 0% - 12% 9% +18 -30% 0% - 21% 16% CadreMix -27% -32% - 22% 17%
-107- A Budgetary Analysis of Cadre First, we calculated the peacetime and average long-run cost of each of the baseline and cadre forces as discussed in the previous sections. Second, we calculated the difference in cost between each cadre force and its corresponding baseline force. Lastly, we divided the difference in cost (in all cases- cost savings) by the cost of the corresponding baseline force to calculate the cost savings of cadre relative to the overall cost of the force. It is worth noting that all cost estimates are restricted to estimates of personnel and operations and maintenance (O&M) costs. The actual Army budget in any period of peace or averaged over periods of peace and war would be significantly larger as it includes other costs such as research and development and procurement. 132 However, since the cost of a marginal unit in the force is determined mainly by personnel and O&M costs, restricting our analysis to these costs is appropriate. ____________ 132 This is especially true for periods of war when the size of the Army budget may increase significantly over peacetime levels. In this analysis, we assume that the only increase in the baseline personnel and O&M budget during wartime is the cost of activation (increase from part-time to full-time pay and increase in O&M costs) of reserve forces.
- Page 71 and 72: -55- A Budgetary Analysis of Cadre
- Page 73 and 74: -57- A Budgetary Analysis of Cadre
- Page 75 and 76: -59- A Budgetary Analysis of Cadre
- Page 77 and 78: -61- A Budgetary Analysis of Cadre
- Page 79 and 80: -63- A Budgetary Analysis of Cadre
- Page 81 and 82: -65- A Budgetary Analysis of Cadre
- Page 83 and 84: -67- A Budgetary Analysis of Cadre
- Page 85 and 86: -69- A Budgetary Analysis of Cadre
- Page 87 and 88: -71- A Budgetary Analysis of Cadre
- Page 89 and 90: -73- A Budgetary Analysis of Cadre
- Page 91 and 92: -75- A Budgetary Analysis of Cadre
- Page 93 and 94: -77- A Budgetary Analysis of Cadre
- Page 95 and 96: -79- A Budgetary Analysis of Cadre
- Page 97 and 98: -81- A Budgetary Analysis of Cadre
- Page 99 and 100: -83- A Budgetary Analysis of Cadre
- Page 101 and 102: -85- A Budgetary Analysis of Cadre
- Page 103 and 104: -87- A Budgetary Analysis of Cadre
- Page 105 and 106: -89- A Budgetary Analysis of Cadre
- Page 107 and 108: -91- A Budgetary Analysis of Cadre
- Page 109 and 110: -93- A Budgetary Analysis of Cadre
- Page 111 and 112: -95- A Budgetary Analysis of Cadre
- Page 113 and 114: -97- A Budgetary Analysis of Cadre
- Page 115 and 116: -99- A Budgetary Analysis of Cadre
- Page 117 and 118: -101- A Budgetary Analysis of Cadre
- Page 119 and 120: -103- A Budgetary Analysis of Cadre
- Page 121: -105- A Budgetary Analysis of Cadre
- Page 125 and 126: -109- A Budgetary Analysis of Cadre
- Page 127 and 128: -111- A Budgetary Analysis of Cadre
- Page 129 and 130: -113- A Budgetary Analysis of Cadre
- Page 131 and 132: -115- A Budgetary Analysis of Cadre
- Page 133 and 134: -117- A Budgetary Analysis of Cadre
- Page 135 and 136: -119- A Budgetary Analysis of Cadre
- Page 137 and 138: -121- A Budgetary Analysis of Cadre
- Page 139 and 140: -123- A Budgetary Analysis of Cadre
- Page 141 and 142: -125- A Budgetary Analysis of Cadre
- Page 143 and 144: -127- A Budgetary Analysis of Cadre
- Page 145 and 146: -129- A Budgetary Analysis of Cadre
- Page 147 and 148: -131- A Budgetary Analysis of Cadre
- Page 149 and 150: -133- A Budgetary Analysis of Cadre
- Page 151 and 152: -135- A Budgetary Analysis of Cadre
- Page 153 and 154: -137- An Operational Analysis of Ca
- Page 155 and 156: -139- An Operational Analysis of Ca
- Page 157: -141- An Operational Analysis of Ca
- Page 161 and 162: -145- An Operational Analysis of Ca
- Page 163 and 164: -147- An Operational Analysis of Ca
- Page 165 and 166: -149- An Operational Analysis of Ca
- Page 167 and 168: -151- An Operational Analysis of Ca
- Page 169 and 170: -153- An Operational Analysis of Ca
- Page 171 and 172: -155- An Operational Analysis of Ca
-107- A Budgetary Analysis of <strong>Cadre</strong><br />
First, we calculated the peacetime and average long-run cost of each of the baseline<br />
and cadre forces as discussed in the previous sections. Second, we calculated the difference<br />
in cost between each cadre force and its corresponding baseline force. Lastly, we divided the<br />
difference in cost (in all cases- cost savings) by the cost of the corresponding baseline force<br />
to calculate the cost savings of cadre relative to the overall cost of the force. It is worth<br />
noting that all cost estimates are restricted to estimates of personnel and operations and<br />
maintenance (O&M) costs. The actual <strong>Army</strong> budget in any period of peace or averaged over<br />
periods of peace and war would be significantly larger as it includes other costs such as<br />
research and development and procurement. 132 However, since the cost of a marginal unit in<br />
the force is determined mainly by personnel and O&M costs, restricting our analysis to these<br />
costs is appropriate.<br />
____________<br />
132 This is especially true for periods of war when the size of the <strong>Army</strong> budget may increase significantly over<br />
peacetime levels. In this analysis, we assume that the only increase in the baseline personnel and O&M budget<br />
during wartime is the cost of activation (increase from part-time to full-time pay and increase in O&M costs) of<br />
reserve forces.