04.06.2014 Views

Purchasing Department - University of Connecticut

Purchasing Department - University of Connecticut

Purchasing Department - University of Connecticut

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

General technology capabilities will be covered in section 3.14.<br />

It is anticipated that the <strong>University</strong>, including UCHC, will expend a combined amount <strong>of</strong><br />

approximately $2.2 million dollars annually for general <strong>of</strong>fice supply products. However, this<br />

estimated amount is provided only as a guideline for preparing your RFP response. It is not a<br />

guaranteed estimated dollar volume. The <strong>University</strong> is not able to guarantee any specific dollar<br />

volume on this agreement and will not be able to commit to an agreement that requires any<br />

financial penalties to the <strong>University</strong>. Please note that all estimates provided, including attached<br />

usage estimates are to be used as guidelines only.<br />

It is important to note that this contract shall not apply to any supply item or <strong>of</strong>fice equipment<br />

currently stocked in the <strong>University</strong>’s Central Stores or available under other <strong>University</strong> contract<br />

awards. Please refer to Section 3.0 for specific product exclusions.<br />

1.3 Specifications<br />

The specifications in Section 3 must be responded to on a point by point basis so the<br />

<strong>University</strong> can evaluate how the proposer plans to meet these requirements. Proposers<br />

must use the RFP numbering scheme in their response to allow for efficient evaluation.<br />

Additionally all other Sections must be addressed with a point by point or section by<br />

section acknowledgement <strong>of</strong> “agreed” or “disagreed” and supply alternate language if<br />

“disagreed”.<br />

This RFP solicits creative and highly competitive pricing for <strong>of</strong>fice supplies based on<br />

scale economies through aggregated volume and standards developed to meet<br />

<strong>University</strong> needs. It is not the intent <strong>of</strong> these specifications to rule out or eliminate any<br />

prospective bidder or manufacturer. If the materials or services you intend to bid do not<br />

comply with the specifications as written, you are instructed to attach to your proposal a<br />

complete itemization and explanation for each deviation or variation from the<br />

specifications. The <strong>University</strong> may, at its discretion, consider or deny any deviation and<br />

purchase the material which best suits its intended use. The bidder shall not purposely<br />

bid goods or services <strong>of</strong> a lesser quality, which requires deviation from the<br />

specification, if the bidder can furnish the goods or services, which will comply with the<br />

minimum technical specifications.<br />

The <strong>University</strong> encourages alternate suggestions for the general <strong>of</strong>fice supply proposal.<br />

Please attach alternate proposals and be sure to respond to the initial RFP on a point by<br />

point basis as instructed above. The award <strong>of</strong> a General Office Supply agreement will<br />

be based upon a comprehensive review and analysis to the most responsive bidder<br />

<strong>of</strong>fering the best value to the <strong>University</strong>. A weighted matrix will be utilized and<br />

reviewed by committee. Please refer to section 4.0 for RFP Evaluation Criteria.<br />

1.4 Term <strong>of</strong> Contract<br />

The initial term <strong>of</strong> any contract resulting from this RFP will be for three (3) years from<br />

date <strong>of</strong> award. By mutual written agreement <strong>of</strong> both parties, resultant contract may be<br />

extended for two (2) additional one (1) year periods or parts there<strong>of</strong>. Such intent to<br />

renew shall be conveyed to the firm in writing no later than one hundred and twenty<br />

(120) days prior to the effective date in the form <strong>of</strong> an amendment to the original<br />

agreement.<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!