I A( y ,<br />

THE PORT<br />

OF LOS ANGELES<br />

Executive Director's<br />

Report to the<br />

Board <strong>of</strong> Harbor Commissioners<br />

DATE: SEPTEMBER 25,2008<br />

FROM:<br />

CONSTRUCTION DIVISION<br />

SUBJECT: RESOLUTION NO. - AWARD OF CONSTRUCTION CONTRACT<br />

CONTRACTOR: MANSON CONSTRUCTION COMPANY<br />

BERTHS <strong>145</strong>-<strong>147</strong> WHARF IMPROVEMENTS - TRAPAC TERMINAL<br />

SPECIFICATION NO. 2605<br />

SUMMARY:<br />

This contract will upgrade the <strong>wharf</strong> at Berths <strong>145</strong>-146 from 50 foot to 100 foot gauge<br />

crane rail and will replace the unserviceable timber <strong>wharf</strong> at Berth <strong>147</strong> with a new<br />

concrete <strong>wharf</strong> with 100 foot gauge crane rail as part <strong>of</strong> the TraPac Terminal<br />

development program. <strong>The</strong> new wharves will be equipped with Alternative Maritime<br />

Power (AMP) facilities. <strong>The</strong> adjacent <strong>wharf</strong> at Berth 144 and the Berths 136-139 <strong>wharf</strong><br />

will also be retr<strong>of</strong>itted with AMP facilities. <strong>The</strong> lowest responsive bidder is Manson<br />

Construction Company located in San Pedro, California. <strong>The</strong> contract amount plus a 5%<br />

contingency is $102,798,040, and the contract duration is 737 calendar days. This<br />

contract is subject to the conditions <strong>of</strong> a Project Labor Agreement (PLA).<br />

RECOMMENDATION:<br />

It is recommended that the Board <strong>of</strong> Harbor Commissioners:<br />

1. Find and determine that a PLA among the City <strong>of</strong> <strong>Los</strong> <strong>Angeles</strong> Harbor<br />

Department (Harbor Department), the <strong>Los</strong> <strong>Angeles</strong>/Orange Counties Building<br />

and Construction Trades Council, and contractors working on the project, is<br />

appropriate and shall be issued for the Berths <strong>145</strong>-<strong>147</strong> Wharf Improvements<br />

project, in that the PLA will promote Labor stability and advance the City's<br />

interest in lowest cost efficiency, quality, safety, and timeliness;<br />

2. Adopt Resolution No. to award the above-mentioned contract for<br />

Item Nos. 1 through 63 <strong>of</strong> the proposal schedule to Manson Construction<br />

Company in the amount <strong>of</strong> $97,902,892; that a 5% contingency not included in<br />

the original contract amount be applied for a total authorized amount <strong>of</strong><br />

$102,798,040; and that payment be authorized from the Construction Account.<br />

<strong>The</strong> contract time for performance <strong>of</strong> the work will be 737 calendar days from the<br />

Notice to Proceed;<br />

3. Authorize the Executive Director to execute and the Board Secretary to attest to<br />

this contract for and on behalf <strong>of</strong> the Board; and


DATE: SEPTEMBER 25,2008 PAGE 2 OF 5<br />

SUBJECT: RESOLUTION NO. - AWARD OF CONSTRUCTION CONTRACT<br />

CONTRACTOR: MANSON CONSTRUCTION COMPANY<br />

BERTHS <strong>145</strong>-<strong>147</strong> WHARF IMPROVEMENTS - TRAPAC TERMINAL<br />

SPECIFICATION NO. 2605<br />

4. In accordance with City Charter 655 (g), delegate and authorize the Executive<br />

Director to adjust final bid quantities and accept the construction contract upon its<br />

completion.<br />

DISCUSSION:<br />

1. <strong>The</strong> project consists <strong>of</strong> timber <strong>wharf</strong> and mooring dolphin demolition, concrete <strong>wharf</strong><br />

demolition, longshore toilet building demolition with lead and asbestos abatement,<br />

slope dredging, steel sheet pile installation, rock placement, landside grading,<br />

existing <strong>wharf</strong> modification including concrete pile driving and <strong>wharf</strong> deck<br />

construction, new concrete <strong>wharf</strong> construction, new longshore toilet building<br />

construction, AMP installation at Berth 144, Berths 136-139, and Berths <strong>145</strong>-<strong>147</strong>,<br />

concrete pile repair and replacement at Berth 143.<br />

2. This is the first major construction contract under the Clean Air Action Plan<br />

incorporating stringent air quality mitigation measures during construction required<br />

by the <strong>Port</strong>'s new Construction Emissions Policy adopted by the Board on February<br />

21, 2008, and the first major <strong>wharf</strong> construction project at the <strong>Port</strong> <strong>of</strong> <strong>Los</strong> <strong>Angeles</strong> in<br />

6 years.<br />

3. <strong>The</strong> Notice Inviting Bids was advertised February 19, 2008, on the <strong>Port</strong> <strong>of</strong> <strong>Los</strong><br />

<strong>Angeles</strong> Website, the Chinese Daily News, Eastside Journal, Dodge Construction<br />

"Green Sheet", Hoy, and the Metropolitan News Company.<br />

4. As authorized by the Executive Director on February 19, 2008, the Chief Harbor<br />

Engineer received five bids for the subject contract on August 14, 2008. Bids were<br />

received from Manson Construction Company, Dutra Construction Co., Inc., Traylor<br />

Pacific, General Construction Co., and FCI Constructors, Inc., in the amounts shown<br />

on the Analysis <strong>of</strong> Bids, attached as Transmittal NO.1. Manson Construction<br />

Company was determined to be the apparent low bidder at $97,902,892. A 5%<br />

contingency is allocated for this project for a total authorized amount <strong>of</strong><br />

$102,798,040. This 5% contingency was determined based on a qualitative review<br />

<strong>of</strong> project specific risks including schedule constraints and potential unforeseen<br />

conditions that may arise during construction.<br />

5. Construction staff has verified Manson Construction Company's state license and<br />

project references. In conformance with Section 10.8.4 <strong>of</strong> Ordinance No. 143429,<br />

certification is hereby made that Manson Construction Company has executed and<br />

filed an Affirmative Action Plan with their bid. A notification letter has been sent to<br />

the City Office <strong>of</strong> Contract Compliance as required in the ordinance.


DATE: SEPTEMBER 25,2008 PAGE 3 OF 5<br />

SUBJECT: RESOLUTION NO. - AWARD OF CONSTRUCTION CONTRACT<br />

CONTRACTOR: MANSON CONSTRUCTION COMPANY<br />

BERTHS <strong>145</strong>-<strong>147</strong> WHARF IMPROVEMENTS - TRAPAC TERMINAL<br />

SPECIFICATION NO. 2605<br />

6. This contract is consistent with State <strong>of</strong> California Prevailing Wage provisions.<br />

7. <strong>The</strong> purpose <strong>of</strong> a PLA for the referenced project is to promote efficiency <strong>of</strong><br />

construction operations , increase quality, and provide for orderly settlement <strong>of</strong> labor<br />

disputes and grievances without strikes or lockouts, thereby promoting the public<br />

interest in assuring the timely and economical completion <strong>of</strong> the project with no<br />

interruptions to ongoing terminal operations.<br />

8. Worker safety is a major concern while working within an operating terminal. <strong>The</strong><br />

work within the terminal is in localized areas surrounded by ongoing terminal<br />

operations. It is imperative to have well-trained workers who have experience<br />

working in this type <strong>of</strong> environment in order to reduce the risk <strong>of</strong> serious injury to<br />

both construction and terminal workers. <strong>The</strong> PLA will provide qualified, well-trained<br />

construction workers who have experience in performing work within an operating<br />

container terminal. This will reduce the risk <strong>of</strong> interference <strong>of</strong> terminal operations<br />

due to construction delays and the potential for worker injury.<br />

9. <strong>The</strong> PLA will also provide for the preferential recruitment and placement <strong>of</strong> local<br />

workers residing within the City <strong>of</strong> <strong>Los</strong> <strong>Angeles</strong> and surrounding areas near the <strong>Port</strong>.<br />

Additionally, this provides employment opportunities for disadvantaged workers<br />

identified as having a household income below 50% <strong>of</strong> the median, being homeless,<br />

receiving public assistance, or having a history <strong>of</strong> involvement with the criminal<br />

justice system. <strong>The</strong> PLA for this contract requires 30% local hires plus 10%<br />

disadvantaged workers .<br />

ENVIRONMENTAL ASSESSMENT:<br />

<strong>The</strong> proposed action is the award <strong>of</strong> a contract to Manson Construction Company to<br />

construct the Berths <strong>145</strong>-<strong>147</strong> Wharf Improvements Project. <strong>The</strong> <strong>wharf</strong> construction<br />

project was included in a larger terminal <strong>improvements</strong> project that was assessed under<br />

the Berths 136-<strong>147</strong> [TraPac] Container Terminal EIR (ADP: 030127-020) certified by the<br />

Board <strong>of</strong> Harbor Commissioners on December 6, 2007. As such, the Director <strong>of</strong><br />

Environmental Management has determined that the proposed action is exempt from<br />

the requirements <strong>of</strong> the California Environmental Quality Act (CEQA) under Article II,<br />

Section 2(i) <strong>of</strong> the <strong>Los</strong> <strong>Angeles</strong> City CEQA guidelines.


DATE: SEPTEMBER 25, 2008 PAGE 4 OF 5<br />

SUB..IECT: RESOLUTION NO. - AWARD OF CONSTRUCTION CONTRACT<br />

CONTRACTOR: MANSON CONSTRUCTION COMPANY<br />

BERTHS <strong>145</strong>-<strong>147</strong> WHARF IMPROVEMENTS - TRAPAC TERMINAL<br />

SPECIFICATION NO. 2605<br />

FINANCIAL IMPACT:<br />

Funds for these <strong>improvements</strong> have been budgeted in Fiscal Year 2008/2009 Capital<br />

Budget Account No. 54510, Center NO.1103, Program No. 000. It is anticipated that the<br />

funds for this contract will be expended as follows:<br />

Fiscal Year 2008/2009 $ 29,500,000<br />

Fiscal Year 2009/2010 $ 52,500,000<br />

Fiscal Year 2010/2011 $ 20,798,040<br />

Total $102,798,040<br />

Although the Contractor is not obligated to perform any work under the contract in any<br />

fiscal year in which no appropriation for the contract has been made, the Contractor<br />

agrees to resume performance <strong>of</strong> the work required by the contract on the same terms<br />

and conditions for a period <strong>of</strong> 60 days after the end <strong>of</strong> the fiscal year if an appropriation<br />

is approved within that 60-day period. <strong>The</strong> Contractor is responsible for maintaining all<br />

insurance and bonds during this 60-day period. <strong>The</strong> time for performance shall be<br />

extended during this period until the appropriation is made; however, such extension <strong>of</strong><br />

time is not compensable.<br />

If in any subsequent fiscal year funds are not appropriated for work required by the<br />

contract, the contract shall be terminated. However, such termination shall not relieve<br />

the parties <strong>of</strong> liability for any obligation previously incurred.<br />

ECONOMIC BENEFITS:<br />

Spending under this <strong>wharf</strong> rehabilitation contract is estimated to support the equivalent<br />

<strong>of</strong> 1,272 one-year full-time equivalent jobs in the five-county region.<br />

CITY ATTORNEY:<br />

<strong>The</strong> Office <strong>of</strong> the City Attorney reviewed and approved Specification No. 2605 as to<br />

form on March 10, 2008.


DATE: SEPTEMBER 25,2008 PAGE 5 OF 5<br />

SUBJECT: RESOLUTION NO. - AWARD OF CONSTRUCTION CONTRACT<br />

CONTRACTOR: MANSON CONSTRUCTION COMPANY<br />

BERTHS <strong>145</strong>-<strong>147</strong> WHARF IMPROVEMENTS - TRAPAC TERMINAL<br />

SPECIFICATION NO. 2605<br />

TRANSMITTALS:<br />

1. Analysis <strong>of</strong> Bids<br />

2. Contractor and Subcontractor List<br />

3. Site Map<br />

4. Five copies <strong>of</strong> Specification No. 2605<br />

SHAUN SHAH ESTANI<br />

Chief Harbor Engineer<br />

Construction Division<br />

MIO AEL R. CHRISTENSEN<br />

D puty Executive Director<br />

APPROVED:<br />

GERALDINE KNATZ, Ph.D.<br />

Exetutive Director<br />

/<br />

DLE:lh:lm<br />

2605801<br />

ADP NO: 020306-041