27.05.2014 Views

Teacher Evaluation System - Polk County School District

Teacher Evaluation System - Polk County School District

Teacher Evaluation System - Polk County School District

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

conference (post‐observation conference) with the teacher. The planning and reflection conferences should<br />

be scheduled 1‐5 days preceding and following the observation.<br />

G<br />

Global Observation Instrument (GOI)<br />

A comprehensive observation tool used by an administrator while conducting classroom walkthroughs,<br />

informal observations, and formal observations. The instrument is used to gather information about a<br />

teacher’s use of evidence‐based practices for essential performance criteria across all four domains. It is<br />

one of two primary sources of information to be applied when rating the teacher on each essential<br />

performance criteria.<br />

Granular Level<br />

Technically, a very detailed level.<br />

H<br />

High Probability Instructional Strategies<br />

Research‐based strategies that have been identified in contemporary research as having a higher probability<br />

of raising student learning when they are used at the appropriate level of implementation and within the<br />

appropriate instructional context.<br />

Highly Effective<br />

A rating that indicates that there is significant and varied evidence of teacher performance at the highest<br />

level of quality and consistency of practice; demonstrated practice is exemplary in relation to the rubric<br />

description for an EPC as documented through observation and other appropriate data gathering methods.<br />

I<br />

Informal Observation<br />

An observation that can be announced or unannounced and may or may not include an observation of the<br />

full class period (10 to 30 minutes). Typically, there is no planning or reflection conference.<br />

Instructional Assistance Conference/Form<br />

A process used to promote prompt professional conversations regarding instructional assistance with<br />

teachers. This process and form does not replace the formal written plan of improvement required in<br />

Section 15.7 and is not disciplinary in nature. It is intended to facilitate professional conversations between<br />

the teacher and administrator.<br />

Interim Performance <strong>Evaluation</strong><br />

A mid‐year conference/conversation that takes place between a teacher and an administrator designed to<br />

focus on an analysis of the status of strategy implementation and student performance data between the<br />

initial planning session and summary review. A teacher’s progress towards TARGET plans and ARROW<br />

documentation is also discussed at this time.<br />

L<br />

Learning Gain Scale Score<br />

Determined by computing the sum of the Post Test Score minus the Pre‐Test Score, divided by the sum of<br />

100 minus the Pre‐Test Score. This number is then multiplied by 100 to identify the Learning Gain Scale<br />

Score. LGSS = [PoTS – PrTS / 100 – PrTS] X 100.<br />

Learning Target<br />

State determined or district determined goal for measurement of student progress.<br />

M<br />

Marzano <strong>Evaluation</strong> Model<br />

103

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!