Teacher Evaluation System - Polk County School District
Teacher Evaluation System - Polk County School District
Teacher Evaluation System - Polk County School District
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Professional Development Plan (PDP) and Cross‐Walk<br />
Category II teachers who receive a rating of Unsatisfactory on the Overall Annual <strong>Teacher</strong> Performance <strong>Evaluation</strong> Rating Form must be placed on<br />
a Professional Development Plan (PDP). This process is optional for teachers receiving an overall rating of Needs Improvement. When applied, the<br />
PDP must be prepared in a collaborative conference between the teacher and designated administrator within 10 days of the noted deficiency. The<br />
PDP is designed to provide up to 90 days of assistance; helping the teacher to correct deficiencies within the prescribed period of time and in<br />
accordance with the Student Success Act (see Appendix A). However, a Professional Development Plan (PDP) may be implemented at any time,<br />
when a Category II teacher continues to demonstrate unsatisfactory performance related to the specific Essential Performance Criteria.<br />
Category Two Only Interim Review<br />
Last Name First Name Interim Review<br />
SAP ID # Interim Review<br />
<strong>School</strong> Year Interim Review<br />
<strong>Teacher</strong> Signature Administrator Signature Planning Session Date Interim Review<br />
<strong>School</strong> Name<br />
<strong>Teacher</strong> Signature Administrator Signature<br />
Summary Review Date Met Goal Did NOT Meet Goal<br />
Goal Statement<br />
(One sheet per Goal)<br />
To improve my knowledge, skill<br />
and/or mental model related<br />
to:<br />
The Goal Statement, Strategies,<br />
Methods of Documentation and<br />
Timelines elements must be<br />
prepared.<br />
Related Domain/EPC<br />
Mark one of the options below for which the individual has been rated<br />
“Needs Improvement” or “Unsatisfactory”.<br />
Instructional Design, Lesson Planning, and Assessment<br />
EPC:<br />
Instructional, Delivery and Facilitation<br />
EPC:<br />
The Learning Environment<br />
EPC:<br />
Professional Responsibilities and Ethical Conduct<br />
EPC:<br />
1 Comments:<br />
Strategies<br />
Documentation<br />
Method<br />
Timeline<br />
Professional Resource Team<br />
2<br />
3<br />
4<br />
97